查询词典 span-new
- 与 span-new 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
The rolling tide of information and globalization with incomparable power has brought humankind into the span-new 21st century and a span-new era—knowledge economy era.
滚滚而来的信息化与全球化浪潮以无与伦比的巨大力量把人类带进崭新的 21 世纪,带进一个崭新的时代——知识经济时代。
-
City of pool of long individual plant group " two model integrated form a complete set of level of state of social " construction reforms test division, its key is to want establish to span the strategic train of thought that type and intensive change development, with the technology innovation, system innovation and social innovation give priority to grasper, make pool of long individual plant city of especially big core, contemporary " of "3+5" of pool of construction long individual plant two model social " city group belt, form south with Guangzhou, north and Wuhan, on the west with Chongqing, east be opposite accordingly with Shanghai, can drive mid economy of Hunan economy and even our country to span the new-style industrialization that type develops is metropolitan area, develop countrywide economy the action of growth pole.
长株潭城市群"两型社会"建设国家级综合配套改革试验区,其关键是要确立跨越式和集约化发展的战略思路,以技术创新、制度创新和社会创新为主抓手,打造长株潭特大核心城,建设长株潭"3+5"现代"两型社会"城市群带,形成南和广州、北和武汉、西和重庆、东和上海相应对的、能带动湖南经济乃至我国中部经济跨越式发展的新型工业化大都市区,发挥全国经济增长极的功能。
-
In some buildings it is unable to apply strengthening measurements on the upper surface of the reinforced concrete continuous beam. On the basic character of RC continuous beam moment redistribution, a new method was tried to increase the beam's resisting moment capacity. The Carbon Fiber Reinforced Plastic was bonded on beam bottom of the span-mid, the flexural capacity of span-mid was increased, and the plastic hinge joint at the beam end was formed.
在实际加固工程中无法对钢筋混凝土连续梁梁顶进行加固,因此在试验中采用CFRP来加固梁的跨中,增强其正其正截面的抗弯承载力,并利用梁支座处出现塑性铰,引起弯矩重分布的特性,来达到加固的目的。
-
We will show several previous results of the span of simple graphs and multigraphs, and we also will present a new algorithm to compute spT of multigraphs, furthermore we will discuss the bound of the span of a special multigraph and the algorithm of spT.
本文将给出一些关于简单图和重图的已知结论,同时还将给出一种计算重图的sp_T的新算法,并将讨论取特殊T集时重图的T-匝算法以及完全图K_n的T-匝算法。
-
As the economic index of the ordinary long span solid abdomen type portal rigid frame will drop along with the span increasing, a new type of way is presented in this paper, which is fixing up horizontal prestressed cables at the joints between beams and columns.
本文针对普通大跨度实腹式门式刚架随着跨度的增大经济性指标下降的问题,采取另一种方法,在门式刚架的梁柱连接处布置水平预应力拉索。
-
In August 2007, C-SPAN unveiled a new "C-SPAN Video Library" webpage, which will eventually provide free access to all of its past programs including Congressional proceedings, hyperlinked to corresponding Congressional Record entries that are not otherwise subject to copyright.
2007年8月, C - SPAN的推出了一种新的& C - SPAN的视频库&的网页,最终将免费提供其所有的过去的项目,包括美国国会的程序,链接到相应的国会记录条目,没有其他受版权保护。
-
The multistage construction analysis method has been successfully used to simulate the whole erection process of a 102m-span barrel vault grid structure and a 118m-span double-layer spherical reticulated shell.
并运用多阶段施工全过程跟踪数值理论进行了两算例分析:某102m跨度大型柱面网壳结构的累积滑移施工与支架滑移施工的理论模拟,某118m跨度双层球面网壳结构悬臂施工的全过程理论分析。
-
Considering the factors such as randomness of natural lightning locus and the coexistence of primary and secondary leaders, it is necessary to lead in the concept of dynamic lightning protection shielding angle. It is suggested that the angular bisector of practical protective angle formed by ground wire or earth pin in UHVAC transmission line and conductor should be aligned with the direction of lightning leader as well as the ratio of vertical span to horizontal span and the impact of wind speed should be considered.
考虑自然闪电轨迹的随机性和雷电主先导与次先导并存现象等因素,有必要引入动态防雷保护角概念,建议特高压交流线路中地线对导线的实际保护角形成的角平分线应与雷电先导的来向一致,并应计及垂直档距和水平档距的比值和风速的影响。
- 相关中文对照歌词
- Couch Potato
- New Girl
- Everything New
- New York Shit
- Streets Of New York (City Life)
- New York Minute (Remix)
- We Don't Stop
- Woman Keep Watching Me
- I Love New York / New York, New York
- Ain't Sayin' Nothin' New
- 推荐网络例句
-
Panorama Many people are dancing in a large sitting room.
在一个大客厅里,许多人在跳舞。
-
We fully understand how a microwave oven cooks food, it is first necessary to talk ...
我们充分理解一个微波炉煮的食物,这是首先要谈。。。
-
The age of the patient is, therefore, almost equivalent to the duration of HBV infection.
因此患者的年龄几乎与乙肝病毒感染的病程相似。