英语人>网络例句>span-new 相关的网络例句
span-new相关的网络例句

查询词典 span-new

与 span-new 相关的网络例句 [注:此内容来源于网络,仅供参考]

The multistage construction analysis method has been successfully used to simulate the whole erection process of a 102m-span barrel vault grid structure and a 118m-span double-layer spherical reticulated shell.

并运用多阶段施工全过程跟踪数值理论进行了两算例分析:某102m跨度大型柱面网壳结构的累积滑移施工与支架滑移施工的理论模拟,某118m跨度双层球面网壳结构悬臂施工的全过程理论分析。

Considering the factors such as randomness of natural lightning locus and the coexistence of primary and secondary leaders, it is necessary to lead in the concept of dynamic lightning protection shielding angle. It is suggested that the angular bisector of practical protective angle formed by ground wire or earth pin in UHVAC transmission line and conductor should be aligned with the direction of lightning leader as well as the ratio of vertical span to horizontal span and the impact of wind speed should be considered.

考虑自然闪电轨迹的随机性和雷电主先导与次先导并存现象等因素,有必要引入动态防雷保护角概念,建议特高压交流线路中地线对导线的实际保护角形成的角平分线应与雷电先导的来向一致,并应计及垂直档距和水平档距的比值和风速的影响。

The structure parameter influences on lateral stability, such as arch axis coefficient, arch high span ratio, crankle rigidity ratio of arch rib, vertical and lateral rigidity ratio of arch rib, lateral rigidity of bridge decking and arch rib ratio, crossbeam number, rigidity of crossbeam number the effect of non-orientedly conservative loadings of bridge deck and width span ratio, were discussed. Corresponding numerical charts were given, and they may be of some reference value and helpful to the parameter design of ribbed arches.

考虑了拱轴系数、矢跨比、拱肋抗扭刚度与横向抗弯刚度比、拱肋的竖向抗弯刚度与横向抗弯刚度比、横系梁在拱肋切平面内的抗弯刚度和拱肋的横向抗弯刚度比、横系梁在拱肋径向的抗弯刚度与拱肋的横向抗弯刚度比、桥面系的横向抗弯刚度与拱肋的横向抗弯刚度比、横系梁的数量、桥面系横向刚度引起的非保向力效应及拱肋间距与跨径的比对组拼拱横向稳定的影响,并给出了相应的图表,为拱桥设计时拱肋的结构参数的选取提供一定的依据。

Placement of late-span value is still an opportunity in the area in large numbers are more optimistic about the first 015 out cross-4,5,6,7,8, 2,3 cross-trumpet area to consider doing less, No. 016 concerns 4, 6,7,8,9 cross-out, rule out the possibility of three cross-value occurs, the first 017 candidates span the value of cross-3,5,6,7,9, 4,8 even cross there is little hope.

后期跨度值仍落点于中大数区的机会较多,第015期看好4、5、6、7、8跨开出,小号区2、3跨少做考虑,第016期关注4、6、7、8、9跨开出,排除3跨值出现的可能,第017期候选跨度值为3、5、6、7、9跨,偶数4、8跨出现希望不大。

Aiming at calculation of the equivalent rigidity of truss stiffening girder in an aeroelastic model design of a long-span suspension bridge with truss stiffening girder,Aizhai bridge,a super-long -span suspension bridge across deep valley with single span,was taken as an example for investigation.

针对大跨度桁架加劲梁悬索桥气弹模型设计中主梁等效刚度计算问题,以矮寨大桥为实例,建立不同长度空间桁架加劲梁节段模型有限元模型,通过悬臂梁位移法反算得到主梁的等效刚度特性,研究了不同荷载施加方式以及不同梁段长度对等效刚度特性的影响。

The text obtains some data that caving span of immediate roof is 30m, caving span of main roof at first weighting is 42m and caving span of main roof at periodic weighting is 14m. Mining influence range is determined about 40m through numerical modeling, namely about three advance pillars were in the range of mining influence.

利用数值模拟得出煤柱采场直接顶的垮落步距为30m,老顶的初次来压步距为42m,老顶的周期来压步距为14m;通过模拟超前支承压力,确定了采动影响范围约为40m,即采场超前的三个煤柱都在影响之内。

In the pump body installed a stator swing span and a swing span rotation shaft, the swing roller bearing on the stator swing span connects with an end of the stator mount, the other end of the stator mount connects with the stator; on the plunger connecting rod sliding boot installed a static pressure balance chamber, the holding rings are arranged on the two sides of the plunger connecting rod sliding boot which has a fit clearance with the holding rings; the rotor rotates the stator simultaneously via the plunger piston; the needle roller bearings are arranged on the two inner circles and fit with the port axle.

在泵体内安置有定子摆架和摆架转轴,位于定子摆架上的摆架滚子轴承与定子托架的一端配合联接,定子托架的另一端与定子相连;柱塞连杆滑靴上设有静压平衡室,柱塞连杆滑靴两侧设有保持环,柱塞连杆滑靴与保持环有一定的配合间隙;转子通过柱塞带动定子同步旋转;在转子内圆两端设有滚针轴承,滚针轴承与配流轴配合。

With the appearance of a free span pipeline, its loading types and stress state will be changed. Especially when ocean currents pass through it, a periodical vortex shedding is often produced and induces vibration of the free span pipeline. This type of vibration contributes a lot to the fatigue failure of a free span pipeline.

管跨段的出现改变了海底管线所承受的载荷形式和应力状态,尤其是在海流作用下流经管跨时,常伴随着周期性的涡旋发放,引发管跨段的周期性振动,成为管跨段发生疲劳失效的主要因素之一。

Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.

3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。

Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.

3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。

第5/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Attention Span
Attention Span
推荐网络例句

Chrysanthemum of 10 thousand birthday is lax to edaphic requirement, with the arenaceous qualitative loam with fecund, good drainage had better.

万寿菊对土壤要求不严,以肥沃。排水良好的砂质壤土为好。

He unstepped the mast and furled the sail and tied it.

他拔下桅杆,把帆卷起,系住。

Therefore, positively advances the interest rate marketability reform is one of current our country finance reform important tasks.

因此,积极推进利率市场化改革是当前我国金融改革的重要任务之一。