英语人>网络例句>trussed construction 相关的网络例句
trussed construction相关的网络例句

查询词典 trussed construction

与 trussed construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

It combines the construction mechanization with the microcosmic process of construction mechanization and has a theoretic discussion on the mechanization organization method of RCD construction. An effective method is provided for rational optimization of the mechanization organization construction.

将施工机械化配套与大坝施工的&微观&过程相结合,对大坝机械化施工组织方法进行了理论性探讨,为合理优化组织机械化施工提供一套有效的指导方法。

Summary of the main tasks for the design basis of the new norms box for checking cantilever construction, Bridge construction safety and quality of construction is a top priority. Installation of this project is checking the pre-construction work of an important technology.

本设计主要任务为依据新的规范对箱形悬臂施工进行验算,拱桥的施工安全和质量是工程施工的头等大事,为此工程安装施工验算是施工前的一项重要技术工作。

During the period of construction by the cantilever erection construction method, bridge experiences not only the process of generating girder in the stage of T rigid frame, but also the process of system transformation, so bridge has experienced a great complex stress process, in order to ensure the security of bridge during the whole stage of construction, the stress control and geometry control must be made during the stage of construction of bridge.

近些年来,我国随着经济的快速增长,出现了建造大跨度桥梁的高潮,预应力混凝土技术的迅速推广应用以及建造预应力混凝土连续梁桥的各种先进施工方法应运而生,加快了桥梁的施工进度,使得预应力混凝土连续梁桥的跨越能力不断增大,悬臂拼装施工方法就是在这种背景下产生并发展起来的。

Syntactic presupposition triggers mainly refer to some special sentence patterns , including "ba" construction and "bei" construction that trigger the existential presupposition ; including "lian " construction that relates to the subjective judgment and "bi" construction that presuppose "BX".

句法类预设触发语主要是一些能触发预设的句式,包括触发存在预设的&把&字句和&被&字句,预设内容与主观评价有关的&连&字句和触发事实预设的&比&字句。

Sewage treatment plant phase ii rush period sewage treatment plant phase ii rush period qiqihar in heilongjiang news april 19 hearing yesterday morning,reporters at the city's bureau of the construction of urban sewage treatment center phase ii construction site to see more than 470 construction workers are in full swing biochemical pool,drainage pumping station,sewage pump pond 13 projects such as single pile foundation construction,7 sets of large hammers,3 large excavators,a national taiwan university,20 sets of cranes and heavy goods vehicles are operating at full capacity 24 hours with classes rush period.

污水处理厂二期工程抢工期黑龙江新闻网齐齐哈尔重庆自来水19日讯昨天上午,记者在市建设局自来水的中心城区污水处理二期工程施工现场看到,470多名施工人员正紧锣密鼓地进行生化池、排水泵房、自来水泵池等13个工程单体的桩基础施工,7台大型打桩机、3台大型挖掘机、1台大吊车和20余台重型给排水暖通正开足马力24小时连班抢工期。

The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable.

实例分析说明,该施工导流系统综合风险研究方法和分析模型是可靠的、适用的。

Coordinate the approval of construction contract, export credit, the check and confirmation of construction plan, the purchasing of plants, the organization of construction team, affreightment at home and abroad , as well as the coordination with people assigned abroad

负责指导监督国际工程的具体事务,包括报批、商业谈判以及合同签署,协调工程的审批、出口信贷的落实、对工程方案的审查和确立,设备采购、施工队伍的组织,国内的运输事务、设备的进出口协调以及与海外相关业务人员的沟通。

Including declaration for approval, business negotiation, and contract signing. Coordinate the approval of construction contract, export credit, the check and confirmation of construction plan, the purchasing of plants, the organization of construction team, affreightment at home and abroad , as well as the coordination with people assigned abroad

负责指导监督国际工程的具体事务,包括报批、商业谈判以及合同签署,协调工程的审批、出口信贷的落实、对工程方案的审查和确立,设备采购、施工队伍的组织,国内的运输事务、设备的进出口协调,以及与海外相关业务人员的沟通。

This article elaborated the construction principle of two pipe jacking methods——Sludge-liquid balance method and air-pressure balance method , introduced the main equipments used, discussed the construction technology and the treatment measures, then summarized and evaluated the construction effects as well as the merits and disadvantages.

本文结合工程实例,论述了顶管施工中泥水平衡顶管法和气压平衡顶管法两种顶管法的施工原理,对其主要设备及作用进行了简单介绍,对顶管施工中技术及问题处理措施进行了详细阐述,并对施工效果和两种顶管法施工中的优缺点进行了总结和评价。

The control of the construction time is one of the important controls of tunnel. Once the construction time went amuck, the others should be influenced. So the study of the construction time is very important to us.

而在隧道工程中,进度控制是三大控制(资金、进度和质量的控制)中重要控制的目标之一,工程进度失控,必然会人力、物力的浪费,甚至可能会影响到工程的质量和安全,因此,对于隧道工程的工期研究也具有重大意义。

第18/50页 首页 < ... 14 15 16 17 18 19 20 21 22 ... > 尾页
相关中文对照歌词
Under Construction
Ice Cream
Change In The Making
Wall Around My Heart
Wild Side Of Life
Godspeed On The Devil's Thunder
Ebolarama
Ruff Stuff
The Issue Of Tissue (Spacecake)
Joe
推荐网络例句

A historical region of southwest France between the Pyrenees and the Garonne River. The duchy of Aquitaine was joined with France after the marriage of Eleanor of Aquitaine to King Louis VII in1137, but its possession was disputed after her subsequent marriage to Henry II of England.

阿基坦法国西南部一个历史地区,位于比利牛斯山和加隆河之间,在1137年阿基坦的埃莉诺与国王路易斯七世结婚之后阿基坦公国加入法国,但当她再嫁英国亨利二世后,其归属权便受到争议

There are moments when I look at the smiling , happy faces of my expectant staff and wonder how they will cope when confronted by an outraged housemaster along with an unrepentant and recalcitrant bleached blond teenager in 18 years ' time .

有时候,我看着那些满怀期待的员工微笑,幸福的脸,想着当他们遇到一位愤怒的宿舍管理员和一位不知悔改,叛逆,而且将头发染成白色的18岁少年时,他们会如何处理。

In the crossing belt of town and country, the farmers manifest the plentifulness, complexity of social life in this area, especial young farmer, so creating the souls of common people, particular the soul world of young fanners, is the most particular aesthetic phenomenon.

在城乡交叉地带中,最能显示这一区域社会生活丰富复杂性的社会阶层就是农民,特别是青年农民,所以塑造这一地带平凡众生的心灵,特别是青年农民的心灵世界,是路遥小说最独特的审美现象。