英语人>网络例句>supporting construction 相关的网络例句
supporting construction相关的网络例句

查询词典 supporting construction

与 supporting construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

So long as we utilize the viewpoint of Marxism to give criticalness the inheritance and the development,Qu Yuan's personality value can be beneficial in our present culture,spirit construction and the contemporary personality value orientation establishment,which can be beneficial in our socialism harmonious society's construction and the socialism core value system construction.

只要我们运用马克思主义的观点予以批判性地继承和发展,屈原人格美的价值就会有益于我们当代文化精神的建设和当代人格美的价值取向的确立,就会有益于我们社会主义和谐社会的构建和社会主义核心价值体系的建设。

When the slip-form paver is used in curbstone concrete spreading construction,because the grade of designed curbstone concrete is comparatively superior and its thickness is comparatively thin,the crack resistance and the construction workability of concrete are usually bad in construction.

采用滑模摊铺机进行路缘石混凝土摊铺施工时,由于设计路缘石混凝土标号较高,厚度较薄,在施工中往往出现混凝土抗裂性差以及施工和易性不好等缺点,通过试验,在混凝土中掺加适量的粉煤灰,可对路缘石的施工质量有很大的改善和提高。

The problem of water leakage from curtain for cutting off water is reasonably solved after the conception of apparent connection width and construction method of big connection width in curtain for cutting off water in deep-mixing piles are proposed from practical engineering need. The economical benefit of the construction method of big connection width is better than that of construction method of traditional connection width.

6从实际工程需要出发,在深层搅拌桩止水帷幕中提出了视搭接宽度的概念和大搭接宽度设计施工方法,较好地解决了止水帷幕中桩间开叉漏水的问题;大搭接宽度施工方法与传统搭接宽度施工方法相比,还具有较好的经济效益。

Because of huge investment, longer construction cycle, the control of investment and the period of construction are the keys of construction items.

建设项目的投资巨大,建设期较长,其投资和建设期的控制,是建设项目控制的关键。

Li-tower construction is not decomposition group of conditions, and more flexible light industrial equipment, construction methods vary, resulting in the current construction site, they use a decomposition group of tower approach.

分解组立铁塔不受施工条件限制,并且工器具比较灵活轻便,施工方法多样,因此在目前施工现场大多采用分解组塔的方法。

In order to guarantee the construction quality of 500 mm×1 900 mm bonded prestress beam,its construction procedure,installation and demolishment of formwork,corrugated pipe setting,prestressed beam baiting,threading and stretching duct grouting and end envelop and other construction points were illustrated,so as to guarantee both quality and quantity.

为了保证500 mm×1900 mm预应力梁的施工质量,对该预应力梁的施工顺序、模板安装与拆除、波纹管留设、预应力筋下料、穿束与张拉孔道灌浆及端部封裹等方面分别阐述其施工要点,保质保量地完成了该预应力大梁的施工。

If it is really needed to demolish, move, rebuild or close the environmental sanitation facilities due to special causes such as construction etc., the construction entity or other relevant entity shall report to the municipal or district administrative department of sanitation for approval, in the case of demolishment or close of environmental sanitation facilities, scheme on future construction shall also be presented.

因建设等特殊原因确需拆除、迁移、改建、封闭环境卫生设施的,建设单位或者其他有关单位应当报市或者区市容环境卫生管理部门批准;拆除、封闭环境卫生设施的,还应当提出补建方案。

But the construction drawing budget method can cause the greater difference between the accounting results of development organization and construction organization due to their different accounting errors, different understandings of construction drawing and different dinking modes, which leads to the difficulty in project settling accounts.

但是,由于施工图预算计算起来往往由于预算人员的计算误差和对施工图理解的不同,思维方式的不同,造成建设单位和施工单位计算的结果误差较大,给工程结算造成较大的麻烦。

With the large-scale current of the construction project, as the requirement variety of the construction development impetus actor and the variety of the time and role when the contractors intervention of theproject, the paper brings forward a new pattern of integration management------PLMT mode,which aims at over process disseverment of the construction project、reducing the mutual dissension and conflict of every project actor, and makes the employer have abundant decision-making control right, as well as not to be immersed in idiographic project management.

随着建设工程项目大型化的趋势、作为建筑业发展动力的发包方的需求变化以及承包方介入项目时间和角色的变化,本文提出一种旨在克服建设工程项目过程之间的割裂、减少项目各参与方之间的相互争执和冲突,让发包方既有充分的决策控制权,又不陷于具体项目管理工作的新型集成管理模式——建设工程项目全寿命周期一体化管理模式。

To control and harness the pollution of dustfall in Changchun city, we should base on the construction of the ecological city, we also should enforce afforestation construction and water construction, and then we could achieve social, economic and environmentally sustainable development.

对长春市大气降尘污染进行治理和控制,应该首先以城市生态建设为基础,加强绿化建设和水域建设,实现社会、经济和环境的可持续发展。

第30/50页 首页 < ... 26 27 28 29 30 31 32 33 34 ... > 尾页
相关中文对照歌词
Under Construction
Ice Cream
Road Of The Righteous
Starring Role
Change In The Making
Wall Around My Heart
9-5ers Anthem
Overload
Outro
Behind The Mask
推荐网络例句

So it was last week in Selma , alabama.

上星期在亚拉巴马州塞尔马市发生的事件也是这样一个转折点。

The group also spearheads various social programs in China.

该组织还带头参与中国的各种社会活动。

He points out huge swathes of neighbouring land that once glimmered with rice paddies.

而最近,这片土地上的水稻被挖掘干净,取而代之的是一片养鱼场。