查询词典 supporting construction
- 与 supporting construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
If you pay attention, you find a lot of advertisements Loushu or have "full cast in place", not the school for the majority of construction, in construction who only know that it is related to housing construction on the term structure, but what does he mean with the housing quality and the use of a space it was not clear what relationship.
如果你留心,会发现不少楼书或广告中都有"全现浇"一词,对于大多数不是学建筑、搞建筑的人来说,只知道这是与房屋建筑结构有关的名词,但到底是什么意思,与房屋的质量和空间使用有什么关系就不清楚了。
-
Combined with the project general situation,it introduces the whole setting of portal jib crane ,represents the construction process and methods of using portal jib crane batch by batch,consolidation large-tonnage steel box girder,steel girder spanning by using drag put up girder,so to increase the construction progress and construction quality.
结合工程概况,对龙门桁吊的总体布置情况进行了介绍,阐述了利用龙门吊分节段吊装、拼装大吨位钢箱梁,用拖拉架梁进行钢梁架设的施工步骤与方法,从而提高了施工进度和施工质量。
-
This paper simulates three jobbing sheet construction schemes of air duct structure in a certain subway station project by using the strong pre-and post-processing functions of FLAC~(3D), and separately calculates the sedimentation value of ground after construction by the three schemes through analog calculation, in order to evaluate the quality of the three jobbing sheet construction schemes.
利用FLAC3D强大的前后处理功能来模拟某地铁车站工程风道结构的三种中板施工方案,并通过模拟计算,分别计算出三种中板方案施工后地表的沉降值,以此来评选三种中板施工方案的优劣。
-
Our country firstly put forward such design principle of Qinghai-Tibet railway engineering as "lower temperature actively, reduce the heat into the subsoil, and assure the heat stability of frozen earth for the quality stability of construction", creatively adopt such corresponding measures of frozen earth construction problem as: for the poor frozen earth developing section, line should avoid as possible;for the geology of ice at high temperature and unstable frozen earth zone, the method of bridge instead of subgrade shall be adopted;in subgradeconstruction, such facilities as heat stick, rubble ventilation subgrade , rubble ventilation berm, ventilation pipe subgrade and laying heat preservation board etc shall be adopted to raise the stability of frozen earth subgrade;during the excavation of bridge, culvert , foundation pit and scouring prevention trough, creatively adopt single-tooth knapper and solve the problem of frozen earth excavation;during the construction of bridge and culvert, durable concrete and three-step maintenance method are adopted to assure the outside and inside beauty of structure.
我国在世界上首次提出"主动降温、减少传入地基土的热量、保证多年冻土的热稳定性,从而保证修筑在上面的工程质量的稳定性"的青藏铁路工程设计原则,创造性地采取了解决冻土施工难题的相应对策:对于不良冻土现象发育地段、线路尽量绕避;对于高温极不稳定冻土区的高含冰量地质,采取"以桥代路"的办法;在路基施工中采用了热棒、片石通风路基、片石通风护道、通风管路基、铺设保温板等多项设施,提高冻土路基的稳定性;在桥涵基坑、挡水埝基槽开挖中,创造性地应用了单齿破碎器,解决了冻土开挖难题;在桥涵工程施工中,采用了耐久性混凝土,采用了三步养生法,保证了结构物内实外美。
-
This paper discusses the necessity of enhancing information service for domestic animal industry,and analyses the influence factors and the laggardly causes of the database's construction. The paper makes out concerned study of quickening the pace of database's construction,the combination of information service and some correlative affairs and focuses on the information need from group customers. The study is of importance for information service's construction and development for domestic animal industry.
本文在论述了加强我国畜牧信息服务业运行机制研究必要性的基础上,对影响我国畜牧信息服务业发展的专业数据库建设及专业数据库建设缓慢的原因等因素进行了分析,对加快我国畜牧信息服务业发展的专业数据库建设、畜牧业信息服务与相关事务处理业务相结合、关注集团用户的信息需求等运行机制进行了相关的研究,对我国畜牧信息服务业的建设与发展有重要的意义。
-
At first, this paper conducts in depth research on classification method, compaction propeties, granulometric composition and crushing of stone. On the basis of clarifying engineering characteristics of material of rock-filling embankment, requirements of ground treatment have been put forword in this paper. Then combined with the site test and engineering practice in SHUINAN Road and LANLIN Road, through the synthetical analysis of factors of influencing densification effect for the maximum grain size of filling material, lay-down thickness, granulometric composition, densification machinery and densification frequency etc., this paper studies key technical problems about construction technologies for spreading and leveling of filling material, choosing densification machinery, densification technology and slope construction systematically. Finally, construction technologies of filling lime-stone and sand-stone roadbed have been proposed in this paper ,which are significant for quality guarantee of highway engineering.
本文首先从石料的分类方法、压实特性、粒径组成以及破碎性等方面进行研究,在明确填石路基填料的工程特性基础上,进而提出了填石路基的地基处理要求,然后结合广西水南路和甘肃兰临路填石路基试验路段上的现场研究,通过对填石路基填料最大粒径、松铺厚度、粒径组成,压实机械以及碾压遍数等影响压实效果因素的综合分析,系统研究了填石路基填料的摊铺与整平技术、压实机械选型技术、压实工艺以及边坡施工技术等施工工艺中的关键问题,最后提出石灰岩类和砂岩类填石路基的施工工艺要求。
-
At the same time combined with indoor maximum dry density test,this paper discusses the possibility that rock-filling construction quantity .Then data of densification quantity examination under the condition ofdifferent filling material.densification machinery.densification parameter and lay-down thickness are collected as the analytic object. On the basis of making a statistical analysis of experiment data ,supervisory standard and assessment method of settlement difference and settlement ratio that adopted to examine rock-filling embankment construction quantity are put forward systematically At last carrying on settlement observation tests of rock-filling embankment in different construction stage in different layer ,the dependability of assessment method is validated.
同时结合室内最大干密度试验,讨论了表面沉降法作为填石路基施工质量检测手段的可行性和可靠性;然后通过汇总不同填料、不同压实机械、不同压实参数和不同摊铺厚度条件下的压实质量检测数据作为分析对象,在对试验数据进行了统计分析的基础上,较为系统地提出了以沉降沉降差及沉降率作为填石路基施工质量检测指标的评定方法和相应的管理标准值;最后通过对填石路基试验段进行不同填筑时期不同层位的沉降观测试验,验证了评定方法的可靠性。
-
Leifeng Pagoda in China's building and construction of landscape protection on the left go down in the four "best in the world": the use of tower-type construction as the construction of steel framework for the support of the main load-bearing of the best in the world.
雷峰塔的建设在中国风景保护和建设史册上留下了四项"天下第一":塔类建筑采用钢材框架作为建筑支撑、承重主体的天下第一。
-
After nearly a year of practical work, I have become familiar with the scene in the entire construction process, mastering the layout of the construction site and lofting, familiar with the basic engineering measurement, data compilation and quality of all aspects, with the initial construction site management work and cost control.
经过近一年的工作实践,我已经熟悉了现场施工的整个流程,熟练掌握了施工现场的测设和放样,基本熟悉工程计量、资料整理和质量检测各个环节,已初步具备了施工现场的管理工作和成本控制。
-
My bureau decides to use 3 to lustrum, corporeal market is begun to supervise administrative standardization, system to change construction in complete province (abbreviation 3 change construction), came on stage accordingly " Sichuan saves industrial and commercial administration to control government about the market " 3 change " the opinion of construction ".
我局决定用三至五年时间,在全省开展有形市场监督管理标准化、制度化建设,并相应出台了《四川省工商行政管理有关市场监督管理"三化"建设的意见》。
- 相关中文对照歌词
- Under Construction
- Ice Cream
- Road Of The Righteous
- Starring Role
- Change In The Making
- Wall Around My Heart
- 9-5ers Anthem
- Overload
- Outro
- Behind The Mask
- 推荐网络例句
-
So it was last week in Selma , alabama.
上星期在亚拉巴马州塞尔马市发生的事件也是这样一个转折点。
-
The group also spearheads various social programs in China.
该组织还带头参与中国的各种社会活动。
-
He points out huge swathes of neighbouring land that once glimmered with rice paddies.
而最近,这片土地上的水稻被挖掘干净,取而代之的是一片养鱼场。