查询词典 run ... into the ground
- 与 run ... into the ground 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The war was a complete subversion of the war in the past to attack ground-based understanding of the concept; the Federal Republic of Yugoslavia in the war, the US-led NATO forces did not put in ground troops, the use of the Federal Republic of Yugoslavia Precision guided weapons of indiscriminate bombing, eventually forcing the Federal Republic of Yugoslavia to yield more ground attack proved that the traditional mode of war will soon be empty by the Navy-led joint operations by replacement of the three services, ground troops in modern warfare status, others Gradually given way to decline in the Air Force and Navy.
这次战争彻底颠覆了人们的对以往战争的以地面进攻为主的认识观念;在对南联盟的战争中,以美国为首的北约部队,在未投入地面部队的情况下,对南联盟采用高精度的制导武器狂轰滥炸,最终也迫使南联盟屈服,更证明了地面进攻的传统战争模式即将被以空海军为主导的三军联合作战所替代,地面部队在现代战争中的地位,己逐步下降让位于海空军。
-
With large-scale model tests of open-cut box tunnel and shallow bored horseshoetunnel intersecting orthogonally and obliquely with active ground fissure zone individually, the adaptability of sectionalized tunnel passing through active ground fissure is studied,theresults show that the sectionalized tunnel with flexible joint can bear very large sheardeformation,and the deformation and secondary stress of adjacent sectionalized tunnel underthe action of ground fissure is small,meantime many sectionalized tunnels can eliminatepartly the effect of active ground fissure movement,have a good capability of adapting itselfto the large deformation.
8通过分段设缝的明挖箱形隧道和浅埋暗挖马蹄形隧道分别正交和斜交穿越地裂缝带穿的大型模型试验,对分段设变形缝的地铁隧道穿越地裂缝带的适应性进行了研究,结果表明分段式柔性接头隧道能承受较大的剪切变形,相邻衬砌管段变形和次生应力均较小,同时多段设变形缝具有很好的消化地裂缝变形的效果,从而说明多段设变形缝加柔性接头连接的地铁隧道具有较强的适应地裂缝活动大变形的能力。
-
Register a website, cento a few information, install 9 phones can " net scoops up a fish "; The company that the website place that a few copy risk shows registers the ground to be in A ground, personnel is in B ground, IP address is in C ground however.
注册一个网站,摘录一些信息,安装一两部电话即可&撒网捞鱼&;一些仿冒的网站所显示的公司注册地在A地,人员在B地,IP地址却在C地。
-
For low frequency and logic measurement, any ground connection from scope ground to circuit ground is OK, the probe ground may be left open.
对于低频和逻辑测量﹐如有任何从示波器的地到电路地的连接﹐探头的地就可以不接。
-
Ground caused by electromagnetic interference is mainly due to the existence of ground impedance, when the current flows through the ground, it will produce in the line voltage, which is ground noise.
详细说明:地线造成电磁干扰的主要原因是地线存在阻抗,当电流流过地线时,会在地线上产生电压,这就是地线噪声。
-
By mechanics analysis of ground deformation, this paper makes a systematic research on the affecting factors of ground deformation of shield tunnel and excavation and establishes a predicted model of ground deformation based on neural network. This model is applied to predict actual ground deformation caused by shield tunnel and excavation in Shanghai, Guangzhou, Nanjing etc.
本文以盾构法隧道和基坑为研究对象,通过对地面变形机理的分析,全面系统地从理论上探讨了盾构隧道和基坑引起地面变形的影响因素,建立了基于神经网络的地面变形预测模型,并运用该模型对上海、广州、南京等城市的盾构隧道和基坑工程所引起的地面变形进行了实际预测,获得了令人满意的预测结果。
-
However, anti-plug memory after burning is not necessarily the end-of-life, the majority of normal use or because of how memory power supply and ground root, anti-plug is often because the local power supply is the ground and in the connected to pass, so as long as this power will be the role of a period of short-circuit ground wire from burning, and other ground and the chip has not been destroyed.
不过,内存条反插烧毁后并不是一定就报废了,多数还是能够正常使用的,这是因为内存条有多根供电和地线,反插时往往是因为局部的地线把电源正和地相连通,所以只要加电就会把这一段起短路作用的地线烧毁,而其他地线和芯片却没有被破坏。
-
During the construction period of shield shaft, quite a significant disruption against the surrounding ground might happen, therefore, upon shield break-out, the ground surrounding the shaft eye should be conditioned to enable the said ground to be standing alone after ground improvement, to safeguard a successful break-out.
而盾构工作井构筑过程中,会对周围土体产生较大的扰动。因此,盾构出洞前,需要对洞口土体进行处理,使洞口土体经改良后达到可以自立的状态,从而保证盾构顺利出洞。
-
To the wall with construction materials, articles posted above, on handrails and electrical shutter doors, Yao Wang Taiwan, by product description 9 with wooden dam, looked like the look of cement, from the ground to the top of the dam is within the white walls, projectors, DVD, audio equipment 10 fence, the laying of real grass, small stone embellishment, flower basket fence, equipped with VAG stress management system entities pipeline 11 Steel Bridge, the need to open the door into the car, you can remove the bridge, waterfall in the lateral bridge, and a straight line, the ground when the tunnel plate, the plate Below are the sink, sink, a ring-shaped water system 12 the ship has three sails, fixed line connections, at the top of a volume system, laying the ground mosaic, surrounded by lamps.
用建筑材料做墙,上面贴写真,有扶手下去,又电动卷帘门,有遥望台,有产品图文说明 9)大坝用木制,看上去像水泥的样子,从地面到顶部,大坝内是白色墙面,有投影仪,DVD,音响设备 10)围栏内铺设真草皮,小石头点缀,栅栏花篮,安装有VAG压力管理系统的实体管线 11)钢结构桥,需要开门进车时,可以把桥整体移走,瀑布在桥的外侧,直线而下,地面时洞洞钢板,钢板下面是水槽,水槽内有水形环系统 12)船上有三个帆,同轴连接固定,顶部有卷收系统,地面铺设马赛克,周围有地灯。
-
Based on the mechanism of ground settlement, a rigorous solution is derived in this paper to find the ground settlement during excavation, taking the action of wall resistance into consideration, and the corresponding computer program is given. By use of the program, the characteristics of ground settlement caused by excavation are analyzed in detail and an excavation case in Chicago is calculated with the result compared to that given before.
通过对基坑开挖过程中地表沉陷的机理进行分析,本文还推导了一种考虑墙土界面侧摩阻力作用时的地表沉陷理论公式,并应用该公式对芝加哥某地铁基坑工程的地表沉陷进行了估算,与前人方法的计算结果进行了比较。
- 相关中文对照歌词
- L'unité
- Katie's Tea
- La Colline Des Roses
- Car Crazy Cutie
- Uptown / Don't Say Nothin' Bad (About My Baby) / Da Doo Run Run
- La Dance Ghetto
- Randall
- I Run This
- Barrio
- Run Devil Run
- 推荐网络例句
-
Who? I never heard of him, Paul said, before asking teammate James Posey if he had heard of him.
赛后,科比说,他一直都是一名非常出色的射手,今天他打得很棒。
-
When I joined the company, I rotated around the different sections.
我加入这个公司时,轮换过几个不同的部门。
-
I was in Dubai visiting my relatives.
我在DUBAI看望我的亲戚。