英语人>网络例句>freight 相关的网络例句
freight相关的网络例句

查询词典 freight

与 freight 相关的网络例句 [注:此内容来源于网络,仅供参考]

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Party B shall be liable for any dead freight or demurrage, should they fail to have the quantity of the goods ready for loading in time as stipulated, while the carrying vessel has arrived at the port of shipment as advised.

如果乙方没有根据规定,及时地把装运货物准备好,而装运船只已经到达所通知的港口,乙方应负责所有的空舱费和滞期费。

Vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for sellers accorunt.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。

Should the carrying vessel has arrived at the port of shipment as advised and the Seller fails to have the quantity of the goods ready for loading in time as specified, the Seller shall be liable for any dead freight or demurrage

如果买方船只按时到达装运港,而卖方不能按规定的时间备妥货物以待装船,则由此而产生的空舱费及滞期费应由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the selle

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

第32/50页 首页 < ... 28 29 30 31 32 33 34 35 36 ... > 尾页
相关中文对照歌词
Freight Train
The Train Song
Don't Stop (For Anything)
Freight Train
Freight Train
One Monkey
White Freight Liner Blues
Freight Train Blues
New Delhi Freight Train
Good Old American Guest
推荐网络例句

These are places without aristocratic baggage; egalitarian places open to talent, self-improving, engaged in learning and innovation through networks that were at once competitive and cooperative.

这些地方没有贵族遗风作祟,而且对于那些有天分的人是开放的平等之地,这些人善于通过那些曾经很具有竞争力与合作精神的关系网进行自我提高以及学习创新。

Christine: You don't want to see me?

你不想见我?

The users of parallel computer system relate to many fields.

本文介绍了用户界面设计的基本原则,及其发展趋势和现状;分析了并行计算机系统的特点,及其使用过程中的用户需求。