英语人>网络例句>freight 相关的网络例句
freight相关的网络例句

查询词典 freight

与 freight 相关的网络例句 [注:此内容来源于网络,仅供参考]

Aiming at the limitation of this algorithm,the universal cut-and-try algorithm is put forward.The complexities of macroscopic traffic volume and GDP time series are calculated,respectively.The results show:the complexity of GDP has a positive correlation with the complexity of freight traffic volume;the influence of the complexity of GDP on the complexity of macroscopic traffic volume is long-term with lagged effect;and the correlation between GDP and macroscopic traffic volume has an uncertain relation with the correlation between their complexities.

通过计算宏观交通量与GDP时间序列的复杂度,得到简单结论:GDP复杂度与货运交通量复杂度具有较强的正相关关系;GDP复杂度对宏观交通量复杂度的影响是长期的,具有滞后效应;GDP与宏观交通量现象的相关程度与二者复杂度的相关程度没有必然的联系。

East Wind within the time limit as stipulated in our contract, otherwise dead freight, if any, should be borne by you.

你方必须按合同规定的期限将货装上"东风轮",否则,空舱费将由你方负责。

The sellers shall be fully responsible for the dead freight, demurrage and all other losses thus sustained.

对于空舱费、滞期费以及由此而遭受的一切其他损失,卖方应完全负责

Since you have fail to load the ship on time , the expenses of dead freight and demurrage will be for your account .

例句1。既然你方没能如期装船,你们就应负担空舱费和滞期费。

Liable for the demurrage, dead freight and all other expenses in

收货人、提单持有人不承担在装货港发生的滞期费、亏舱费和其他与装货有关的费用,但是提单中明确载明上述费用由收货人、提单持有人承担的除外。

C. The Sellers shall be liable for any dead freight or demurrage, should it happen that they have failed to have the commodity ready for loading after the carrying vessel has arrived at the port of shipment on time.

c。 卖主将是对所有空水脚或抗议负责,如果它发生他们无法有商品准备好装载,在运载的船准时之后到达了装运港。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

By the Buyers after its arrival at the port of shipment, all expenses such as dead freight, demurrage, etc.,and

C如买方所订船只到达装港后,卖方不能按买方所通知的时间如期装船时,则空舱费及滞期费等一切费用和后果均由卖方负担。

Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

第31/50页 首页 < ... 27 28 29 30 31 32 33 34 35 ... > 尾页
相关中文对照歌词
Freight Train
The Train Song
Don't Stop (For Anything)
Freight Train
Freight Train
One Monkey
White Freight Liner Blues
Freight Train Blues
New Delhi Freight Train
Good Old American Guest
推荐网络例句

These are places without aristocratic baggage; egalitarian places open to talent, self-improving, engaged in learning and innovation through networks that were at once competitive and cooperative.

这些地方没有贵族遗风作祟,而且对于那些有天分的人是开放的平等之地,这些人善于通过那些曾经很具有竞争力与合作精神的关系网进行自我提高以及学习创新。

Christine: You don't want to see me?

你不想见我?

The users of parallel computer system relate to many fields.

本文介绍了用户界面设计的基本原则,及其发展趋势和现状;分析了并行计算机系统的特点,及其使用过程中的用户需求。