英语人>网络例句>contractor 相关的网络例句
contractor相关的网络例句

查询词典 contractor

与 contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]

And the difference between the two sums shall be expressed in the said certificate as a balance due to the Trade Contractor from the Employer or to the Employer from the Trade Contractor as the case may be.

以上两总额如有差异,应该最终证明书中陈述,作为甲方应付专业承包商的款项,或专业承包商应付甲方款项或任何有可能的情况。

If the Contract does not contain any rates or prices applicable to the varied work, the rates and prices in the Contract shall be used as the basie for valuation so far as may be reasonable, failing which, after due consultation by the Engineer with the Employer and the Contractor, suitable rates or prices shall be agreed upon between the Engineer and the Contractor.

如果合同中未包括可适用于变更后工程的单价或价格,则合同中单价及价格只要合理,也可作为估价的基础,如果不适用,在与承包人及业主协商后,由工程师与承包人商定一个合适的单价或价格。

Of building contractor, sub-contractor, and supplier on a separate sheet.

请将其他建筑商及供应商的名称,位址及电话,另列提交。

They are investigating the person who is responsible for building road .they think that he and the contractor close a dark deal,the contractor offer a bribe to him in order to get the contract of building road and bridge .

他们正在调查负责修建道路的那个人。他们认为他和承包商达成了不可告人的交易;承包商私下贿赂他,以得到修建城市道路和桥梁的合约。

They thought he has reached the scandal deal with the contractor.The contractor bribe him secretly in order to get the contract for building road and bridge of the city.

他们认为他和承包商达成了不可告人的交易;承包商私下贿赂他,以得到修建城市道路和桥梁的合约。

Acceptance Criteria Activity Duration Estimation; Activity Definition; Activity Sequencing; Addenda Approved budget Arbitration Award of Contract ; Award Criteria Audits Balanced Matrix; Baseline Bill of Quantities Brainstorming Characteristic Checklists civil engineering civil building Claims Clarify Closing Communication Management Communications Planning Communications Skills Communication channels or paths Completion Computer-based Concrete structure Conditions of Contract Conflict Management Contract Management Contract administration Change Control Contract Closure Contract file Contract agreement; Contractual obligations Contractor Contractor's Representative Construction Management Planning Contract Price Control Chart Cost Estimating; Cost of Quality Cost Control Cost Budgeting Cost Management Co-operation Failure costs Critical Path Feedback Fixed-price Fossils Force Majeure Daywork Functional Organization Decision; Fundamental Tenets Decision Tree Defects Liability Definitions Delphi technique General Rules Deliverables General Provisions Deviation; Generation Direct Costs Discounted cash flow; Dissemination Highway engineering; Discharge Human Resource Management; Disputes Human Resource Planning Drawings Hydraulic engineering; Hydroelectric engineering; Employer's Taking Over Identity Certificate Evaluation of Tenders Initiating Process Group; Executing Process Group Instructions to Tenderers Industrial building Investment payback analysis; Ineffective Individual and team performance Information Distribution Negotiation Indirect Costs Nominated Subcontractors Incentive bonus Information Technology Interpretation; Insurance Observation Inspections Off-site Online On-the-job training Opening of Tender

验收标准活动时间的估计;活动的定义;活动序列分析;增编核定预算仲裁授予合同;授标标准审计平衡矩阵;基线工程量清单集思广益特性清单土木工程民用建筑索赔澄清闭幕通信管理通信规划沟通技巧沟通渠道或路径完成以计算机为基础的混凝土结构合同条件冲突管理合同管理合同管理变更控制合同结束合同文件合同协议;合同义务承包承包商的代表规划建设管理合同价格控制图成本估算;质量成本成本控制成本预算成本管理合作失败成本关键路径反馈固定价格化石不可抗力计日工职能组织决定;基本原理决策树缺陷责任定义德尔福技术的一般规则交付的一般规定偏差;代直接费用贴现现金流量;传播公路工程;放电的人力资源管理;争端的人力资源规划图纸水利工程;水电工程;雇主接管身份证书评标启动过程组;执行过程组指示的投标工业建设投资回报分析;无效个人和团队的业绩信息分配谈判指定分包商的间接费用激励奖金信息技术解释;保险观察视察场外在线在职培训开幕投标

The Employer shall be entitled to pay to such nominated Subcontractor direct, upon the certificate of the Engineer, all payments, less retentions, provided for in the nominated Subcontract, which the Contractor has failed to make to such nominated tract, which the Contractor has failed to make to such nominated Subcontractor and to deduct by way of set-off the amount so paid by the Employer from any sums due of to decome due from the Employer to he Contractor.

向工程师递交合理证明,证明他已将上述情况以书面形式通知了该指定的分包商。则雇主有权根据工程师的证明直接向该指定分包商支付在指定分包合同中已规定的,而承包商未曾向该指定的分包商支付的一切费用,并以冲帐方式从雇主应付给或将付给承包商的任何款项中将雇主支付的上述金额扣除。

The Employer shall , with - in twenty - one days of the date of delivery of such notice either is - sue to the Contractor a Certificate of Completion stating date on which, in his opinion, the works were substantially completed in accordance with the Contract or give instructions in writing to the Contractor specifying all the work which, in his opinion, re - quires to be done by the Contractor before the issue of such Cer - tificate.

发包方应当在收到这种通知之日起二十一天内或者对承包方签发一个以其自己的观点说明工程真正地按合同完成的日期的完工证明,或者以书面形式给承包方以指令,具体说明以他的观点看来在签发这种证明前要求承包方做的一切工作。

Achievements: 1997-2000, planned, organized lodging claims against a German shipyard under a shipbuilding contract and won the arbitration case conducted by London Maritime Arbitrators' Association; 1999-2004, Represented CMC to participate five arbitration cases before CIETAC with satisfactory outcome for each;2001-2002, participated in negotiations as the leading counsel and successfully concluded contracts for several projects, including: a Cairo Cement Project (CMC as the general contractor, contractual value at US$65 million), Egypt; and b Barapukuria Power Plant Project (CMC as the general contractor, contractual value at US$220 million), Bangladesh.2002, participated in negotiations of equipment and technology transfer of Gas-Turbine between CNTIC and GE, successfully concluded contract; planned, organized lodging claim against BK a German company and recovered 15 million USD.2004, participated the tender project of nuclear power plant and technology transfer, particularly in designing the transaction structure; 2005, planned, organized solution of a dispute between CMC and a Danish company in a project under NORDIC loan and represented CMC to appear before SCC Arbitration Institute; 2005-2006, organized and participated legal work as the leading counsel for CMC the contractor in Turkish high speed railway project.

主要业务成果: 1997-2000年参与德国政府贷款船舶进口项目争议的解决,策划、组织了对外商索赔并赢得了由伦敦海事仲裁庭审理的仲裁案;作为代理人参加了5起贸仲仲裁案件和多起国内诉讼案件,均获得较好审理结果;2001-2002年参与出口埃及水泥厂项目和出口孟加拉坑口电站等多个海外项目,进行法律风险评估,参加合同谈判,修改合同文本并出具法律意见,促成交易;2002年参与燃气轮机打捆招标项目,审核合同文件,参加了与美国GE公司的谈判,成功签约;策划、参与对德国BK公司的索赔,成功获偿1530万美元;2004年参与核电站及技术转让招标项目,参与设计交易结构、审核相关合同文件;2005年作为代理人组织、参与了与丹麦公司因北欧投资银行项目产生争议在瑞典斯德哥尔摩商会仲裁院的仲裁案;2005-2006年主持、领导土耳其安伊高速铁路项目中方总包方的法律工作,包括包括参与设计交易安排,参与组织行政复审、司法复审程序等。

With independent legal personality, the company has two housing construction general contracting of construction qualification, municipal public works general contractor 2 qualification, highway construction general contracting 2 qualification, water conservancy and hydropower project construction general contracting 2 qualification, architectural decoration decoration contracted 2 professional qualifications, steel structure engineering contracting 2 qualification, mechanical and electrical equipment installation engineering contracting 2 qualification, commercial concrete ready-mix professional contractor 2 qualification, landscape contractor 3 Ancient Architectural Engineering qualification, lifting equipment installation engineering professional contract 3 qualification, Chengdu Military Region B qualification modern engineering contracting business.

具有独立法人资格,公司具有房屋建筑工程施工总承包二级资质、市政公用工程施工总承包二级资质、公路工程施工总承包二级资质、水利水电工程施工总承包二级资质、建筑装修装饰工程专业承包二级资质、钢结构工程专业承包二级资质、机电设备安装工程专业承包二级资质、预拌商品混凝土专业承包二级资质、园林古建筑工程专业承包三级资质、起重设备安装工程专业承包三级资质、成都军区工程承包乙级资质的现代化企业。

第2/55页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Contractor
推荐网络例句

Objective: To study the effect of polycythemia on blood oxygen saturation.

裴蕾目的:观察RBC剧增而引起的高粘血症对血氧饱和度的影响。

Based on SIMPLER algorithm in the curvilinear body-fitted coordinates, the calculations were performed for Pr=0.7, Re=10~1000 on non-orthogonal non-staggered grids which are generated by elliptic equation systems.

采用曲线坐标系下压力与速度耦合的SIMPLER算法,数值研究了周期性渐扩渐缩波纹通道内脉动流动与换热情况,流动Re数的范围为10~1000,Pr数为0.7。

Such a traditional division of the zone of aeration is useful for illustrative purposes.

为了说明的目的,包气带的传统划分是有用的。