英语人>网络例句>construction engineer 相关的网络例句
construction engineer相关的网络例句

查询词典 construction engineer

与 construction engineer 相关的网络例句 [注:此内容来源于网络,仅供参考]

Dongguan Branch have steel construction project national first class qualification of responsibility contracts on specialities, the construction work of the house constructs and always contracts one grade , smelts the project to always contract one grade, adopt " H section steel steel construction energy-conserving residential housing system " technology belong to at home leading technology, have good market prospects.

山东莱钢建设有限公司东莞分公司拥有钢结构工程专业承包国家一级资质、房屋建筑工程施工总承包一级、冶炼工程总承包一级,采用&H型钢钢结构节能住宅建筑体系&技术属国内领先技术,具有良好的市场前景。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Combined with the construction of Shuangtan Bridge Wu-Feng freeway,it introduces the successful finish the suspension construction technique of large-tonnage arch ring box by using the cable suspension steel reinforced concrete arch ring,and puts forward the safety program that should attention in construction.

结合巫奉高速公路双潭大桥施工,详细地介绍了采用缆索吊装钢筋混凝土主拱圈,成功地完成了大吨位主拱圈的吊装施工技术,并提出了施工中应注意的安全事项。

The construction of China Blasting Network and industry information-based platform has laid a basis for "Digital Blasting". The paper also described some efforts made by the blasting industry in the construction and application of information technology in recent years, including the construction and application of China Blasting Network, industry application system software, the industry database clusters, the website clusters, digital archives, vibration measurement grid, digital products, as well as the current development goals of "Digital Blasting".

建设中国爆破网,搭建行业信息化平台,是&数字爆破&的基础工作,本文阐述了爆破行业近几年在信息化建设与应用方面所做的一些工作,内容包括:中爆专网、行业应用系统软件、行业数据库集群、网站集群、数字档案管、测振网格、数字化产品等的建设、研发和应用,同时也提出了当前&数字爆破&的发展目标。

The article is used finite yuan the method builds his to emulate analytic model, the construction of imitate bridge, study successive bridge bracket is irrigated build construction each operating mode, analyse what each operating mode issues bracket to be out of shape reach stability, ordinal come the design of bracket of test and verify is reliable, provide reference for bridge construction.

文章利用有限元方法建立其仿真分析模型,模拟桥梁的施工,探究连续梁支架浇筑施工各工况,分析各工况下支架的变形及稳定性,依次来验证支架的设计是否合理可靠,为桥梁施工提供参考。

To increase the construction process of rigid bridge hollow thin wall high pier ,it puts forward the large mode design method in the construction of hollow thin wall high pier ,and mainly discusses the process of mode design and the checking calculation combined with the practice,and this solves the problems of accelerating the construction of pier.

为了提高刚构桥空心薄壁高墩墩身施工进度,提出了在空心薄壁高墩施工中的大模板设计方法,并结合实例对模板设计的过程和验算进行了主要论述,有效解决了加快墩身施工进度问题。

In addition, interest rates and building materials such as iron and steel prices have eased substantially on the provision of infrastructure such as road and bridge construction business is also good to a certain extent, reduce the construction of road and bridge construction project financing costs.

此外,利率,如钢铁,建材价格已放松了对基础设施大量诸如公路和桥梁建设业务还高兴地在一定程度上减少了道路和桥梁建设项目建设的融资成本。

Mechanized construction of high-grade highway road status, asphalt concrete, cement concrete, RCC, as well as supporting the existence of grass-roots construction machinery and accessories in the focus of questions should consider the issue of the roller compacted asphalt concrete machinery importance; cement concrete slipform paver machine as the leading equipment machines for concrete mixing equipment related to measurement and mixing homogeneity of the importance of indicators; of RCC and grass-roots construction machinery, mixing equipment is still emphasize the measurement accuracy and mixing uniformity; on the grass-roots level paver problem, development and the condition of our country to adapt the automatic leveling of the ground plane; stone processing counterattack crusher used to solve the problem of the ratio of the needle plate.

高等级公路路面机械化施工的现状,沥青砼、水泥砼、碾压砼以及基层施工机械配套存在问题和配套中重点应考虑的问题,沥青砼的碾压机械的重要性;水泥砼滑模摊铺机作为主导设备机对砼搅拌设备中有关计量及搅拌均匀性指标的重要性;对碾压砼和基层施工机械,依然强调搅拌设备的计量准确和搅拌均匀性;对基层摊铺问题,发展与我国国情相适应的自动找平的平地机;石料加工中使用反击式破碎机解决针片状比例的问题。

With the development of the community construction, the construction of residential committee has entered its second stage, namely, the construction of street community management model.

随着社区建设的深入发展,居委会层次上的社区建设已经告一段落,实际上,这项重要的改革正在进入第二个阶段,即街道层次上的社区管理模式的建立。

第45/50页 首页 < ... 41 42 43 44 45 46 47 48 49 ... > 尾页
相关中文对照歌词
Under Construction
Monkey And The Engineer
The Family
Hey Porter
Hey, Hey, Train
Hey Porter
Ice Cream
Love Engineer
Change In The Making
Wall Around My Heart
推荐网络例句

I hope that this success is just the first in a long series.

我希望这只是成功的开始。

Three dimensional stresses on the interface of tire and soil, tire deflection and soil sinkage are measured.

测试轮胎——沙土界面上的三向应力、轮胎变形和沙土沉陷;建立考虑剪切应力对沙土承载特性产生影响的车轮牵引性能预测模型;分析车轮作用下土壤的纵向稳定性。

Sickle-cell disease features episodes called 'sickling crises'.

镰状细胞病发作的特点所谓' sickling危机'。