英语人>网络例句>construction engineer 相关的网络例句
construction engineer相关的网络例句

查询词典 construction engineer

与 construction engineer 相关的网络例句 [注:此内容来源于网络,仅供参考]

Companies under the Hitachi Group, Division of earth and machinery, accessories division, the cause of integrated industries, such as the Ministry of Industry five units, is the Hitachi Construction Machinery Co., Ltd. Hitachi excavator, Shandonglingong Provisional Construction Machinery Co., Ltd. The licensing loaders, Tianjin Construction Machinery Plant to Meet licensing bulldozers, Japan Konan MKB, South Korea Saehan broken hammer, Japan Jomo lubricants, Germany Furui De lubricants in east China, central China's A-level agents.

公司下设日立事业部、土石方机械事业部、配件事业部、综合产业事业部等五大产业单位,现为日立建机株式会社日立挖掘机,山东临工工程机械有限公司临工牌装载机,天津建筑机械厂移山牌推土机,日本甲南MKB、韩国世韩破碎锤,日本矫马润滑油、德国福瑞德润滑油在华东、华中地区的A级代理商。

Combined with practical construction,the author introduces the fixed form of color steel plate installation,lap joint of side and end,selection of self-tapping screw ,and setting of ribbon skylight,illustrates the methods to install color steel plate,and points out the problems should be noticed in installation construction,in order to ensure construction quality.

结合施工实践,对彩钢板安装的固定方式、侧向和端部搭接、自攻螺钉的选用、采光带的设置等方面进行了介绍,并阐述了彩钢板的安装方法,指出了安装施工中需注意的问题,以保证施工质量。

Based on the analysis, it is suggested that the solutions of developing community sports in west china are as follows: quickening the community construction in west china; librating people's thoughts, changing people's opinion, and improving people's understanding to community sports;strengthening the construction of community sports venues and facilities; increasing the investment of community sports fund; enhancing social sports instructor team construction.

在此基础上,提出我国西部城市社区体育发展的对策:加快西部城市社区建设工作;解放思想,转变观念,进一步提高对社区体育的认识;大力加强社区体育场地设施建设;增加社区体育专项资金投入;加快社会体育指导员队伍建设。

It illustrates technology of construction of provisions room from support system of sliding formwork platform、 selection of lifting jack、 height of climbing form, puts forward construction measures of climbing form in winter, which to improve construction level of provisions room.

从滑模操作平台支承系统、升千斤顶选用、升模板高度选用等方面,阐述了粮食筒仓建设施工操作的技术,提出了滑模的冬季施工措施,以提高粮食筒仓施工技术水平。

The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.

文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。

The relations among the different condition, lime content and ages in lime-ash soil construction process are drawn,which can provide reference for construction units to grasp its changes rules,and lay a foundation for making feasible construction plan and measurement criterion.

通过室内试验对二灰土在恒温箱低温养生、养护室标准养生和暴露养生这三种养护条件下石灰剂量的衰减规律进行试验研究,得出的二灰土底基层施工中养护条件、实测灰剂量与龄期之间的相互关系,可为施工单位掌握二灰土石灰剂量变化情况提供依据,并为制定出科学可行的施工组织计划和检测标准打下基础。

This paper studies the change of lime reduction of lime-ash soil under the following three conditions in an inside experiment,such as low temperature,stable temperature and exposed found. The relations among the different condition,lime content and ages in lime-ash soil construction process are drawn,which can provide reference for construction units to grasp its changes rules,and lay a foundation for making feasible construction plan and measurement criterion.

通过室内试验对二灰土在恒温箱低温养生、养护室标准养生和暴露养生这三种养护条件下石灰剂量的衰减规律进行试验研究,得出的二灰土底基层施工中养护条件、实测灰剂量与龄期之间的相互关系,可为施工单位掌握二灰土石灰剂量变化情况提供依据,并为制定出科学可行的施工组织计划和检测标准打下基础。

The main contents and results of this paper are listed as follows:Based on the finite element analysis software ANSYS establish a bridge of three-dimensional mechanical model of CWR;Based on an actual project,calculate different conditions of three forms of bridge and research the reasonable removal scope of fastener;Research on the allowed lock temperature rail track construction of partial maintenance of range.By analyzing the result obtain the best way to replace the support of a bridge and the range of removal of the bearing and permission of rail temperature of construction.It supports some recommendations for the replacement of city construction maintenance.

本文主要研究内容为:基于有限元分析软件ANSYS建立了桥上无缝线路三维力学模型;依据某实际工程,分析计算了三种桥梁形式在不同顶升工况下的钢轨和扣件受力,研究了扣件的合理拆除范围;对维修后局部钢轨施工锁定轨温的允许范围进行了研究;分析得出了城轨桥梁更换支座施工的最佳顶升方式、扣件拆除范围和允许施工轨温,为城轨桥梁更换支座的施工维修提出了一些建议。

It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .

据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。

The damming technique is relatively perfect now, but because of the problems in construction management are more and more severe, such as construction scheme and matching machine, which manifest the high construction expenses.

虽然碾压混凝土筑坝技术已达到较成熟的地步,但是由于采用不同施工组织方案和机械配套方面存在的施工管理问题越来越突出,这集中反映了碾压混凝土坝施工费用的巨大浪费。

第49/50页 首页 < ... 42 43 44 45 46 47 48 49 50 > 尾页
相关中文对照歌词
Under Construction
Monkey And The Engineer
The Family
Hey Porter
Hey, Hey, Train
Hey Porter
Ice Cream
Love Engineer
Change In The Making
Wall Around My Heart
推荐网络例句

The statistical analysis of this large set of mutations has led us to propose a diagnostic strategy that should help with the molecular work-up of optic neuropathies.

这一大系列基因突变的统计学分析引导我们提出一个诊断策略,可以帮助我们对视神经病变进行分子学的诊断检查。

The results show that the pipe grouting changes the mechanical parameters of surrounding rocks to achieve the security of engineering objectives by reinforcing surrounding rocks and bolcking the water.

研究表明:小导管注浆一方面改变了围岩的力学参数,另一方面利用浆液的固结特性可以实现堵水和加固围岩的工程目标,使隧道在开挖过程中的安全得到保障。

She did not make it through many auditions with many people telling her to give up but she didn't.

尽管经历了许多次试唱机会,她的梦想纷纷落空。期间很多人都劝她还是放弃巴,但她仍然守护者自己的梦。