英语人>网络例句>wire casing 相关的网络例句
wire casing相关的网络例句

查询词典 wire casing

与 wire casing 相关的网络例句 [注:此内容来源于网络,仅供参考]

Electrical equipment test equipment General Wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes.

七。电工器材试验设备线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

Seven. Electrical equipment test equipment integrated wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes. Eight.

线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

During the guide wire operation, the following cares should be taken:(1) The head of guide wire needs to be bent to a certain degree and the degree of bend depends on the track of the lesion and diameter and characteristics of the vessel;(2) Insert the guide wire gently through the opening of coronary artery and ensure to deliver the guide wire into the vessel without any resistance;(3) Rotate the guide wire while delivering it across the stenosis lesion;(4) Once the guide wire is delivered to the place, no further operation should be performed before it is confirmed by angiography that the wire is in the true lumen of the vessel.

在引导钢丝的操作中应注意以下几点:(1)引导钢丝头部需弯成一定的弯度,弯度的大小应根据病变的走行、血管直径和特点来决定;(2)引导钢丝进入冠状动脉开口时,动作要轻柔,在确保推送引导钢丝无任何阻力情况下将其送入血管内;(3)引导钢丝通过狭窄病变时要边转动钢丝边推送;(4)引导钢丝到位后要造影确认其在血管真腔内,再行操作。

The company has long been engaged in walking Products Wholesale Wire Cutting used; main products are: Diamond Wire Cutting eyes walking mode / guide wire Tsui, water covered / sprinkler Tsui, ceramic insulation board, marble nose conductive block / give electricity board, take care Using Tension round wire, round round, round wire, catheter threading conductive Silverstrand gears, bearings, cation-anion-exchange resin / French resin walking slowly filter thread cutting / Japan "TOKYO" take care yarn machine filter / EDM Filter / Japan "TOKYO" EDM filter filters Express connectors stainless steel screws, wire walking dedicated fixture / fixtures Motorola, Netherlands powerful magnet than the tables swiss ruby silk copper walking / galvanized copper / Japan's "Sumitomo"/"OKI"/"KHS" copper / brass Electricity JAPAN TOA-class silk / Japan OKI galvanized wire line walking slowly dieMaterials SKD-11, SKH-9RHV600, JAPAN NC derusting agent K -200, KC-12, WD-40 anti-rust oil, rust-proof water NOVOTEC Germany than Israel, Block Table, Switzerland EROWA Fixture

公司长期从事慢走丝线切割常用产品批发;主要产品有:慢走丝线切割钻石眼模/导丝咀,水盖/喷水咀,陶瓷绝缘板,大理石机头导电块/给电板,慢走丝用张力轮,出线轮,引线轮,,穿线导管导电银线齿轮,轴承,阴阳离子交换树脂/法国树脂慢走丝线切割过滤器/日本&TOKYO&慢走丝机过滤器/火花机滤芯/日本&TOKYO&火花机过滤器过滤器快速接头不锈钢螺丝,慢走丝专用夹具/万力治具,荷兰强力磁石瑞士红宝石较表慢走丝铜线/镀锌铜线/日本&住友&/&OKI&/&KHS&铜线/日本TOA黄铜电级丝/日本OKI镀锌线慢走丝模具五金材料SKD-11,SKH-9RHV600,日本NC除锈剂K-200, KC-12,WD-40防锈油,德国NOVOTEC防锈水以色列较表座,瑞士EROWA 夹具

Retrieved the casing loads, making use of casing inwall displacements, which provided the research basis for casing deformation under non-uniform loading and prevention measures for casing collapse.

通过对套管内壁部分位移的优化反分析求出套管所受的内压及外载大小,为研究套管在非均匀载荷作用下的挤毁问题和套管损坏防治措施提供了依据。

Through investigation and analysis to several wells with CBL VDL and CCL. it is found that there are different characteristics in well logging images for the joint parts of API casing with buttress thread coupling, casing with special thread coupling and connecting casing with special thread. Abnormal CCL and CBL curves and VDL waveforms indicate casing failure position and damage pattern.

经过对多口井CBL、VDL和CCL套管测井结果进行了调查研究和分析,发现API接箍式偏梯形螺纹接头套管、接箍式特殊螺纹接头套管和直连型特殊螺纹接头套管接头部位在测井图像中均有不同各自的特征,不正常的CCL和CBL曲线和VDL波形位置表明了套管损坏位置和损坏形式。

Actually, downhole casing is cemented at its bottom, and fastened by casing head at its top, so the axial tension caused by internal pressure does is not loaded by the casing, instead, by well bottom and the casing head, etc..

实际井下套管下端被水泥固定,上端被套管头固定,此时套管承受内压所产生的轴向拉力,并不作用在套管上,而作用在井底和上端约束上。

The dishwashing compartment here has at least one compartment casing (30) and a frame part (3), in which case the compartment casing is formed from a first material, e.g. chrome steel, and, in the region of the introduction opening (2), the frame part (3) consists of a second material, e.g. chrome-nickel steel, which forms a front surface of the dishwashing compartment, and wherein the frame part (3) is connected in a form-fitting manner to the compartment casing, in which case the penetration of moisture into a region of overlap (4) between the frame part (3) and the compartment casing (30) is avoided.

这里所述的清洗舱室具有至少一个舱室壳体(30)和框架部件(3),在这种情况下,所述舱室壳体由第一种材料制成,例如铬钢制成,并且,在导入口(2)区域,所述框架部件(3)由第二种材料组成,例如铬镍钢组成,该框架部件形成清洗舱室的前表面,并且,其中框架部件(3)以形状配合的方式连接至舱室壳体,在这种情况下,可以避免潮气渗入框架部件(3)和舱室壳体(30)之间的重叠区域(4)。

Combined with the macro-morphology appearance analysis and working conditions of failure casing, the paper reached a conclusion that it is due to the impact and friction which come from the drill tools made the fatigue cracks formation on the casing thread root, and eventually leading to casing rupture failure, the material defects in failure casing accelerated crack initiation and growth.

摘 要:某井在钻井作业过程中,发生了上层Φ244.5 mm技术套管断裂失效事故,为了分析事故原因,对失效套管材料的化学成分、金相组织和力学性能进行了检测分析,结合套管失效形貌的宏观分析和套管使用过程中的现场工况分析,得出了套管螺纹发生断裂失效的原因是钻具对套管的撞击、摩擦,使套管螺纹根部产生疲劳裂纹,最终导致套管断裂失效,失效套管的材料缺陷加速了裂纹的萌生和扩展。

Thirdly, on the basis of the productivity model of ideal wells , we comprehensively consider the additional pressure caused by different completion methods and establish four structures of multilateral horizontal wells in 8 different completion methods of the actual open hole completion, slotted liner completion,slotted liner completion with external casing packer, open hole downhole gravel pack completion, openhole prepacked gravel liner completion, casing perforated completion, inside casing gravel pack completion, inside casing prepacked gravel liner completion.

在理想井产能模型的基础上,综合考虑不同完井方式所造成的附加压力损失,建立了这四种分支水平井结构在实际裸眼完井、割缝衬管完井、带ECP的割缝衬管完井、裸眼井下砾石充填完井、裸眼预充填砾石筛管完井、射孔完井、套管内井下砾石充填完井、套管内预充填砾石筛管完井等8种不同完井方式下的产能模型。

第6/50页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Live Wire
...And Through The Wire
Concrete And Barbed Wire
On The Wire
Hot Wire
Hot Wire In My Heart
Through The Wire
Live Wire
The Wire
Hang Wire
推荐网络例句

After explaining total design of automated test system for microcircuit , the thesis introduces GPIB standard .

文章在说明了微电路模块自动测试系统的总体设计后,对GPIB标准进行了介绍。

He interceded in my behalf.

他替我说情。

The greatest quality of axle load: vehicle carrying the largest single-axis by the total mass.

最大轴载质量:汽车单轴所承载的最大总质量。