英语人>网络例句>value engineering 相关的网络例句
value engineering相关的网络例句

查询词典 value engineering

与 value engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]

Civil engineering construction and designers, tunneling companies, civil engineering co, protective consultants and designers, and also to meet with Israeli Military Attache that is staying in China.

市政工程建筑和设计者,隧道公司,市政工程公司,防护咨询和设计者,并与在中国的以色列武官专员会见。

This fact is very important and essential for the design of mining tunnels and ensures engineering safety in tunnel engineering.

该研究结果对于采矿隧道的设计及保证其工程安全有重要意义。

Also working on the project is a number of British engineering groups, including Lotus Engineering, MIRA and Caparo.

又在项目上的工作是一些英国工程集团,包括莲花工程,米拉和卡帕罗。

Key Lab of Data Engineering and Knowledge Engineering of MOE, Beijing 100872, China

教育部数据工程与知识工程重点实验室,北京 100872

Key Lab of Data Engineering and Knowledge Engineering, MOE, Renmin University of China, Beijing 100872, China

中国人民大学数据工程与知识工程教育部重点实验室,北京 100872

Engineering disaster of swelling rock is a subject of extreme complication and momentously economic implications. How to construct projects and sustain its stability economically and effectively in such rock is always a problem puzzling many experts in rock mechanics and engineering geology.

膨胀岩的工程灾害是个极为复杂且具有重大经济意义的课题,如何才能做到经济有效地在这类岩石中建设工程并维持其稳定性,一直是困扰着广大岩石力学和工程地质工作者的一个难题。

It's not all engineering and science, however, as the "Intelligent Emotion" moniker suggests - it is engineering tempered with passion.

这不是所有的工程和科学,但是,由于"智能情感"绰号建议-这是工程锻炼的热情。

Sichuan Motet Engineering Build Co., Ltd., founded in 2004, in Chengdu, Sichuan Province in China with registered capital of 8 million, with the State Environmental Protection Engineering Contract 2 qualification.

四川蒙特工程建设有限公司2004年成立于四川成都,注册资本800万,拥有国家环保工程专业承包二级资质。

In order to predict the engineering and hydro-geological conditions, Positioned along the tunnel alignment/axis on the surface with a long array, super power-supply High density electrical resistance exploration system To prevent engineering accidents from occurrence and to reduce mudflow, water gushing providing the tunnel construction with scientific and reliable grounds.

在公路隧道工程建设过程中,为设计和施工风险,对于埋深大、工程地质条件复杂的隧道,在地表沿隧道轴线采用长排列、大功率供电的高密度电法系统进行视电阻率成像探测,能科学地指导设计和施工,对不良地质段地段提前采取预防措施,能避免和减少塌方、涌水等地质病害的发生,可缩短工期和节约投资。

According to the characteristics of collapsible loess ground and the practice of multistoried engineering,the designing and testing of earth pile composite ground is introduced and the advantages of earth pile in treating thicker collapsible loess ground in multistoried engineering is proved.

针对湿陷性黄土地基的特点,结合多层建筑的工程实际情况,介绍了土挤密桩复合地基的设计和检测工作,阐述了土挤密桩在多层建筑中处理厚度较大的湿陷性黄土地基的优势。

第93/100页 首页 < ... 89 90 91 92 93 94 95 96 97 ... > 尾页
相关中文对照歌词
Let's Humanize
Treasure It
It's What You Value
Open Letter (To A Landlord)
Tool
Yuh Whine Have Value
Automotive Engineering
The Child With The Star On His Head
I Heart Throbsy
I Didn't Say I Was Powerful, I Said I Was A Wizard
推荐网络例句

Chinese traditional virtue is humility and wariness,the compliment and praise to the others should be declination

中国人的传统美德是谦虚谨慎,对别人的恭维和夸奖应是推辞。如

We bought this house on the never-never.

我们以分期付款的方式买下这座房子。

If they did move, and saved the penalty, the referee could insist on the penalty being retaken. In a Scottish 1945 game between Kilmarnock and Partick Thistle, Tommy White had to take a penalty seven times!

如果移动了,而且救出了点球,之前的点球可以视为无效,并重新再罚一次点球。1945年在 Kilmarnock 对阵Partick Thistle 的苏格兰联盟杯比赛中,判给其队的一次任意球,Tommy White却踢了7次。