英语人>网络例句>surrounding 相关的网络例句
surrounding相关的网络例句

查询词典 surrounding

与 surrounding 相关的网络例句 [注:此内容来源于网络,仅供参考]

Results Compared with that in the NP tissues, the number of α-SMA positive cells increased significantly in BPH tissue, and the number of vimentin positive cells increased moderately in the stroma and prominently surrounding the acinus and in the basal layer. In BPH tissue, the myosin and ERα staining signal was lost in the stromal cells surrounding the acinus, and the positive staining cells gathered into bunches in the stroma far away from the acinus, while the positive cells were sporadically distributed in the NP tissue. The PCNA positive cells increased moderately in the stroma and increased significantly in the basal layer.

结果 与NP相比在BPH中,α-SMA阳性染色细胞显著增加;波形蛋白在间质中阳性染色细胞有所增加,在腺泡基底层及临近腺泡外层间质中阳性染色细胞明显增加;在临近腺泡外的数层间质细胞中肌球蛋白和ERα由部分阳性变为完全阴性染色,而在远离腺泡的间质中其阳性染色细胞由散在斑块状分布变为簇状密集排列;PCNA在间质中阳性染色细胞有所增加,在基底细胞层中阳性染色细胞显著增加。

Allantois and surrounding tissues of 8.5 day post coitum embryos, the hindhut and surrounding tissues of 9.5 dpc and 10.5 dpc embryos, the gonadal ridges and surrounding tissues of 11.5 dpc and 12.5 dpc embryos were collected and digested with 0.25%pancreatin-0.02%EDTA, then the cells were cultured in the plastic petridishes which are pretreated with 0.1% gelatine.

实验方法:取胚龄8.5 d胎鼠尾端尿囊及周围组织,取胚龄9.5~10.5 d胎鼠后肠及周围组织,取胚龄11.5 d,12.5 d胎鼠生殖嵴及周围组织,分别经0.25%胰酶-0.02%EDTA消化并接种于0.1%明胶包被的培养皿中。

To maximize potency of exploitable land surrounding Guogongzhuang Station, to drive intensive and effective utilization of land, and enhance comprehensive returns on both rail transit and land surrounding the Station, by developing of above underground and integrating and harmonizing of the Station and surrounding land; and through introducing advanced design idea, to create human-oriented, safe, fast, convenient and effective public transportation, and improve environments of transit.

挖掘车辆段用地和郭公庄站周边可开发土地的效益,通过上盖开发及车站周边土地与车站的协调整合,促进土地的集约高效利用,提高轨道交通和周边土地的综合效益;同时,通过引进先进的设计理念,创造以人为本的,安全、便捷、舒适、高效的公共交通条件,完善换乘环境。

In this thesis, the methods of surrounding rock masses stability classification on the basis of the geological documentation of muck and the boring parameters of TBM are approached, especially as follows:①The geological documentation of muck and the boring parameters of TBM in the Yellow River Diversion Project.of shanxi province is summarized systematically;②Based on the geological documentation of muck and the boring parameters of TBM, that whether the common methods of surrounding rock masses stability (the methods of regular factor classification) classification are feasible, is carried on the discussion;③According to the corresponding relation of muck and the boring parameters of TBM and the surrounding rock masses stability type, the extension assessment method of tunnel surrounding rock masses stability classification is set up, also the corresponding fortran calculation procedure worked out, and not only rational result in conformity with the reality can be obtained, but also the stability situation of surrounding rock masses in front of the working range can be predicted according to the change of the dependent value in the application instance of Yellow River Diversion Project;④Combining with the application instance of Yellow River Diversion Project, extension assessment method in the application of surrounding rock masses stability classification is compared and verificated in detail by applying fuzzy synthesis method by forefathers, and a certain degree discussion and summary about the application achievement of surrounding rock masses stability classification, which is assessed by extension assessment method and fuzzy synthesis method, are carried on.

本文基于渣料和TBM掘进参数的地质编录提供的地质信息进行了围岩稳定分类方法的探讨,重点进行:①对引黄工程中渣料和TBM掘进参数的地质编录的系统整理;②基于渣料和TBM掘进参数的地质编录获得的地质信息,对常用围岩稳定分类方法是否能够进行围岩稳定分类进行了探讨;③根据渣料和TBM掘进参数与围岩稳定类型的对应关系,应用可拓理论,建立了隧洞围岩稳定分类的可拓评价方法,还编制了相应的fortran计算程序,并在引黄工程的应用实例中不仅取得了与客观实际相符的合理结果,而且根据其关联度值的变化能够预测临近掌子面前方围岩的稳定情况;④结合引黄工程的应用实例运用模糊综合评判方法对可拓评判方法在围岩稳定分类中的应用进行了详细的验证、比较,并对前人在运用可拓学和模糊数学进行岩体稳定评判的应用成果方面,进行了一定的探讨、总结。

Firstly, we collected and sorted out the GPS data, established the uniform velocity field for the Chinese mainland and the surrounding regions, and the horizontal deformation field relative to the Eurasia plate; Secondly, we established a motion model for the entire rotation and homogeneous strain of the first and second level blocks in Chinese mainland, analyzed the motion pattern and strain behavior of active blocks in Chinese mainland, as well as the motion pattern of principal fault zones in Chinese mainland; Thirdly, considering the heterogeneity of strain distribution inside a block and supposing that the strain tensor inside the block is the linear function of location, we derived and established an equation for the entire rotation and linear strain of block and a motion model for the entire rotation and linear strain of principal blocks in Chinese mainland; We also calculated the principal strain field and the maximum shear strain field in Chinese mainland and the surrounding regions, analyzed the basic characteristics of strain field in Chinese mainland, as well as the relationship between the spatial distribution of strain field and large tectonic zones; Finally, we established the 2-D geotectonic model and digital model for Chinese mainland and the surrounding regions, calculated the stress field in Chinese mainland and the surrounding regions, and analyzed the basic features of stress field in Chinese mainland and the principal driving force for the motion and deformation in Chinese mainland.

收集整理了已有GPS资料,建立了中国大陆及周边地区统一的速度场以及相对欧亚板块的水平形变场;建立了中国大陆一、二级地块整体旋转与均匀应变的运动模型;分析了中国大陆活动地块的运动状态,应变状态,以及中国大陆主要断裂带的运动状态;考虑到一个块体内部应变张量空间分布的非均匀性,假设块体内部的应变张量是位置的线性函数,推导建立了块体整体旋转与线性应变方程,建立了中国大陆主要地块整体旋转与线性应变的运动模型;计算了中国大陆及周边地区的主应变场与最大剪应变场,分析了中国大陆应变场的基本特征,以及应变场的空间分布与大型构造带的关系;建立了中国大陆及周边地区二维的地质构造模型和数值模型,计算了中国大陆及周边地区的应力场,分析了中国大陆应力场的基本特征以及中国大陆运动、形变的主要驱动力。

RESULTS: During 10 - 12 weeks, in cuntrol group: The defect area was repaired by white and soft tissue that had no resistance to press. The repaired tissue was still lower than the surrounding articular surface with clear boundary. By histological observation, it was found that the defect was repaired by the mechanism similar to inflammatory reaction and the defect is ultimately filled by the hyperplasia of hyaline degenerative fibrous tissues. In filling group: the defect was repaired by semi-transparent, smooth, textured tissues with polish that had resistance to press as well as elasticity. The repaired tissue was almost similar to the shape of the surrounding cartilage,difficult to be distinguished. After histological observation, it was found that there was no inflammatory reaction, but active hyperplasia of inner bonetissue and cartilage tissues; a lot of osteoid tissues and trabeculation were found. Newlborn cartilage was fused with surrounding cartilage tissue and connected with surrounding tissues.

结果:10~12周,对照组:缺损区由白色、质软、按压无阻抗的组织修复,修复组织仍低于周围关节面,边界仍清晰可辨,组织学以类似炎症反应的机制修复缺损,最终以透明变性的纤维组织的增生来填补缺损部位;填充组:缺损区由半透明状、质韧光滑有光泽,按压有阻抗并有弹性的组织修复,修复组织与周围软骨外形上已基本相似,不易区分,组织学未见有炎症反应的过程,内骨组织和软骨组织增生活跃,并可见大量类骨组织和骨小梁形成,新生软骨和周围软骨组织融合,并与周围组织连接。

The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.

富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。

The measurement results show that the general characteristics of the present crustal stress field of the project area are as follows: the horizontal principal stress is the maximum principal stress, and the preferred orientation of the maximum horizontal principal stress is NW-WNW, the maximum principal stress of surrounding rocks of the plant buildings and high-pressure branch tunnel area is generally 14.5±0.5 MPa and the minimum principal stress is 9±0.5 MPa; the dead oad-bearing capacity of surrounding rocks is 10—14 MPa; and the surrounding rocks are essentially impermeable at high pressures of 8—10 MPa.

测量结果表明,工程区现今地壳应力场的总体特征为:水平主应力为最大主应力,最大水平主应力的优势方向为NW-NWW向;厂房和高压岔管区围岩的最大主应力值一般为14.5±0.5MPa,最小主应力值一般为9±0.5MPa;围岩自身的抗载强度一般为10~14MPa;在8~10MPa高压力作用下围岩基本不透水。

From the results of numerical simulation, distributing characters of stress and strain field of surrounding rock mass under gravity is analyzed, which presents the effect of quality of surrounding rock mass, construction order and interactions of adjacent underground runnels while being constructed simultaneously. Impact of interlayer shearing belts on surrounding rock mass stability of underground c

对工程区右岸地下引水洞室群的围岩稳定性进行系统研究,可以控制工程投资,提高施工质量和支护设计精度;分析评价洞室围岩的整体及局部稳定性,消除洞室稳定的潜在危害,对保证地下洞室的施工安全、围岩的长期稳定以及优化设计具有十分重大的工程实践意义。

In studies of interaction among pile, platform that above it and surrounding soil, this paper employ the concept of plate element to simulate the loading character of platform, and employ the concept of solid element to simulate the character of pile and soil, using the finite element method after understanding the geometry properties of pile, soil and the platform. Analyzing the loading properties of the three entities above and their deformation, this paper also employ a special element, Penalty Element. The introduction of penalty element of this kind has served to guarantee the join harmony of displacement between solid element and plate element, thereby effectively resolving the join problem between platforms, pile that support it and surrounding soil.Considering significant property difference between pile material and its surrounding soil, there may be much shear stress on their contact interface produced under vertical load, thus causing displacement or fission. Therefore it is necessary to adopt one special constitutive law of this kind of contact interface, which can reflect its feature of loading and deformation thoroughly. On the basis of the deformation feature and constitutive laws of some contact interface obtained by Zhang Dongji and people concerned through some single-shear experiments on contact interface between structure and soil, this paper employ one pile-soil three-dimensional constant thickness contact interface model to simulate the " slide" taken place on the interface between pile and its surrounding soil. With this kind model, this paper has also created one finite element model, which can be applied to perform finite element calculation and analyze the pile-loading feature, and deduced its element stiffness matrix.

在承台-桩-土共同作用中,考虑桩与承台的几何特性,采用有限元方法,用实体单元模拟桩土,用板单元模拟承台,更具体地分析桩和承台的受力特性和变形,而且还采用罚单元—既实体单元与板单元之间连接必须满足变形协调条件,来有效地解决了承台与桩土的连接问题,且在桩土共同作用中,由于桩体结构的材料性能与周围土层性质相差较大,在竖向荷载下有可能在其接触面上产生较大的剪应力从而导致错动或开裂,因此,为了充分反映桩土接触面上的受力及变形特征,应采用一种桩土接触面特有的本构关系,即利用张冬霁等人关于结构与土体接触面单剪试验所得到的接触面变形特征及其本构关系,引入桩-土三维等厚度接触单元来模拟桩与桩侧土之间的&滑移&,在此基础上建立可用于桩基承载性状分析的有限元计算单元模型,并推导出了各单元的刚度矩阵。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Darkness Surrounding
Light Surrounding You
推荐网络例句

It is also known as one of the most poisonous naturally occurring substances.

它也被称为一个最自然发生的有毒物质。

The greatest stress is found at the location on the cross section where V is the largest.

最大应力出现在横截面上V为最大的地方。

It is the most important three water problem which our country faces in the 21st century that flood and waterlog, drought and shortage of water, the deterioration of water environment.

洪涝灾害、干旱缺水、水环境恶化是二十一世纪我国面临的三大水问题。