英语人>网络例句>span loading 相关的网络例句
span loading相关的网络例句

查询词典 span loading

与 span loading 相关的网络例句 [注:此内容来源于网络,仅供参考]

Two of the golden gate bridge pier in 1964, before the longest suspension bridge in the world span.

金门大桥的两个桥墩在1964年之前拥有世界上悬索桥中最长的跨度。

But theatrics can span a wide variety of actions.

但是抱怨又很多种方式,似乎每个员工都对自己的雇主忍耐了很久了。

The main research object of the reliability theory is the life-span characteristics of the products.

可靠性理论以产品的寿命特征为主要研究对象,通常用一个非负随机变量来描述产品的寿命。

The chemotherapy alone is not significant to life span in tumor bearing mice with metastasis, breviscapine can improve therapeutic index of chemotherapeutic agents for tumor.

单独化疗对伴随肿瘤转移的荷瘤小鼠生命延长无实际意义,灯盏花素能改善肿瘤化疗药物的治疗指数。

The biblical span of three score years and ten is simply not enough.

圣经跨三个评分年和10是不够的。

The thesis also does the sensitivity analysis related to the input parameters for reliability.Qingxi River Bridge is a down-support Arch Steel Tube Bridge with rigid tie bar, its main span is 90 m.

同时采用相关性原理,分析桥梁的一些不确定因素对可靠度的敏感性,较好地描述了随机变量对桥梁结构影响,同类论文在国内还不多见。

The main structure of Caiyuanba Yangtze Bridge in Chongqing, up to date the largest-span tie bar arch bridge, is formed by two side tie bars and one middle tie bar which unite the Y-shape rigid framework and arch rid . Therefore, tie bars are one of the key components.

重庆菜园坝长江大桥是迄今为止世界上跨度最长的系杆拱桥,该桥的两根边系杆和一根中系杆将南北两岸的Y型刚构和中间的拱肋连成一个受力整体,构成该桥的主结构,因此系杆是该桥关键受力部位构件之一。

On the North River Bridge Weicheng CFST arch main bridge construction S233 Provincial Highway Bridge (Gaoyou Depalletizing three to Jiangdu Port Section) under a span of 80.6m CFST arch, rigid tie beam for 1.4m × 1.8m pre-stressed box girder, cast-in-place method using stent Construction .

浅谈北澄子河大桥钢管砼拱主桥施工大桥为S233省道的一座跨径80.6m的下承式钢管混凝土拱桥,刚性系梁为1.4m×1.8m预应力箱形梁,采用支架现浇方法施工。

The parameters included drag-span ratio of cable,the value of prestressing force,the thickness of reinforced concrete floor,the cross area of tightwire and the number of prestressed tig.

利用ANSYS有限元分析软件建立了钢筋混凝土楼板模型和预应力空间组合结构模型,对楼板模型和预应力空间组合结构模型分别进行了模态分析,同时分析了垂跨比、预应力度、拉索截面面积、纵向连接索数和楼板厚度对预应力空间组合结构自振特性的影响

Long-span deep water timbering is the most difficult problem for construction of the bridge.

该桥施工最大难度是大跨度深水施工支护。

第98/100页 首页 < ... 92 93 94 95 96 97 98 99 100 > 尾页
相关中文对照歌词
Life's Zombies
Across The Line (Unreleased 2007 Demo)
Across The Line
Couch Potato
Believe Me
Christmas For Every Boy And Girl
License
Heartless Remix
Big Tops
Your Only Friends Are Make Believe
推荐网络例句

Chimborazo and Cotopaxi, took me by the hand.

越过琴博腊索山和科托帕克西山。

This car is in a good condition.

这辆车的状况很好。

You can divide them into two categories.

您可以分为两类他们。