英语人>网络例句>processing workshop 相关的网络例句
processing workshop相关的网络例句

查询词典 processing workshop

与 processing workshop 相关的网络例句 [注:此内容来源于网络,仅供参考]

We are a professional brake drum factory and into business for over 20 years ,we have one 5 tons of efficient hot-blast stove ,two modeling casting workshop ,two machining workshop,sophisticated machining equipment ,advanced physical and chemical testing and the latest clearance sand shot blasting treatment .

我们公司是具二十年科研、生产、销售于一体的汽车制动企业,拥有一座五吨高效热风炉,两个浇铸造型车间,两个机加工车间,精良的机加工设备、先进的理化检测和最新式的抛丸清沙处理,生产各种型号的汽车制动铸件。

There is knit goods production history for more than ten years in the clothing workshop of our company, there is perfect weaving , dyeing , sewing the equipment, there is a domestic most advanced revolving stage T shirt printing machine and dry the equipment to print stamp in the workshop , it is the products high quality of our company and foundation of the low price to print strength , advanced production equipment in strong production, it is our foundation with fast-developing business too.

我公司的制衣车间已有十余年的针织品生产历史,拥有完善的织造、染色、缝纫设备,印花车间拥有国内最先进的转台T恤印花机和烘干设备,强大的生产印刷实力、先进的生产设备是我们公司产品高质量和低价格的基础,也是我们业务快速发展的基础。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计的过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适的建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备的设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间的初步设计。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计の过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适の建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备の设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间の初步设计。

The paper describes social thinking and collective wisdom, the frame structure and technical pattern of hall for workshop of metasynthetic engineering, as well as the Internet-based living example of the hall for workshop of metasynthetic engineering.

论述了社会思维与群体智慧;综合集成研讨厅的框架结构及技术构件;基于internet的综合集成研讨厅实例。

To eliminate static electricity commonly used methods are: an increase in the use of humidity-left to set paper hanging in the laboratory and workshop of relative humidity, moisture content of the paper hnproving; paper in advance to the machine, to fit the business card printing and membership card-making workshop of temperature and humidity.

消除静电常用的方法有:利用加湿器增加吊晾纸张的室内和车间的相对湿度,以提高纸张的含水量;提前将纸张放到机器旁,以适应制卡和会员卡制作车间的温、湿度。

It is demonstrated that a new maintenance system is necessary. The operating mode, crew rostering system, maintenance regulations and procedures are proposed. Also proposed are the formulae to calculate the ration of the number of trains, amount of repair work, repair lines at a workshop, as well as parking lines. A scheme for the workshop structures of a repair ...

阐明了高速列车具有全新的运用检修模式;提出了高速列车的运行方式、乘务制度、检修制度、工艺流程,以及高速动车组配属数量、检修工作量、检修库线、存车线的设计计算方法与计算公式;给出了高速动力段主检修库厂房结构的推荐方案。

The company was founded in 2004, more than 180 employees, mainly production equipment are:: internal and external automatic profiling, automatic scrub, automatic single vertical saw, universal circular saw machines, double-headed shear , The grantor of hand-planing wood, automatic machine planing wood, high-speed particle machines, vertical high-speed particle machines, single-shaft planing wood, wood-planing double vertical shaft, side-pressure automatic drilling machines, vertical hydraulic multi-axis Bored (acrylic paint, painting workshop, the assembly of water workshop) and other production facilities.

本公司始创于2004年,现有员工180多人,主要生产设备有::内外自动仿型机、自动磨砂机、自动单片纵锯机、万能圆锯机、双头剪、密式手押刨木机、自动刨木机、高速刨花机、立式高速刨花机、单立轴刨木机、双立轴刨木机、侧式气压自动钻孔机、立式油压多轴钻孔机)(喷漆、涂装生产车间、装配流水车间)等生产配套设施。

Company's existing plant 8000 square meters, covers an area of 10,000 square meters, of which: coating workshop 2500 square meters, has two production line coating, flocking production line 1, with a calendering machine, Slitting machine, cloth inspection fight Volume machine, can produce a variety of coatings, silver back, white-out, Flocking of curtains, fabrics shutter, maximum width of up to 280cm; finished workshop 1500 square meters, has 35 flat car, per day production in general Rome 1500 screens, rolling shutters 3000; warehouse 2000 square meters; office, staff living area 2000 square meters.

公司现有厂房8000平方米,占地10000平方米,其中:涂层车间2500平方米,有涂层生产线两条,植绒生产线1条,配有轧光机、分条机、验布打卷机、可生产各种涂层、背银、涂白、植绒的垂帘、卷帘面料,最大门幅可达280cm;成品车间1500平方米,有平车35台,每天可生产一般的罗马帘1500支,卷帘3000支;仓库2000平方米;办公室、员工生活区2000平方米。

School covers an area of 80 mu, building area of 40000 square meters, built of Electrical and Electronic Laboratory, Electrical Engineering Training Room, home appliances laboratories, multimedia classrooms, computer room (500), Training Roomdian qi han , machining workshop, CNC workshop, shop fitter, interactive closed-circuit television "class Ntibantunganya" teaching network and other advanced teaching facilities; now more than 5,000 students, 157 faculty, 111 full-time teachers, 69 teachers technology theory, instructor training 42 Bi-40 teachers, 25 teachers in middle and senior lecturers, 31 lecturers, instructor level training for more than 27 people.

学校占地80余亩,建筑面积40000余平方米,建有电工电子实验室、电工实训室、家电实验室、多媒体教室、微机室(500台)、电气焊实训室、机加工车间、数控车间、钳工车间、交互式闭路电视&班班通&教学网等先进的教学设施;现在校生5000余名,教职工157名,111名专任教师中,技术理论教师69人、实习指导教师42人、双师型教师40人,教师中高级讲师25名、讲师31人、一级以上实习指导教师27人。

第16/100页 首页 < ... 12 13 14 15 16 17 18 19 20 ... > 尾页
相关中文对照歌词
Albert Flasher
Workshop Of The Telescopes
Radiophonic
Award Tour
The Night Santa Went Crazy
The Night Santa Went Crazy (Extra Gory)
Inner Voice
Utopian Futures
Jezebel Boy
Boston
推荐网络例句

Fostering the concept of multi-culture firmly and mastering the development of advanced culture correctly are conductive to resisting terrorism, separatism of nationalities and ultraism of religion, which is of great academic theoretical, immediate and profound historical si...

牢固树立多元文化的理念和正确把握先进文化的发展方向,有助于在世界范围内自觉地抵制恐怖主义,民族分裂主义和宗教极端主义。不仅具有重大的学术理论意义,而且也具有重大的现实意义和深远的历史意义。

But if anyone walks in the night, he stumbles, because the light is not in him.

11:10 若在黑夜行走,就必碰跌,因为那光不在他里面。

You are asking for the moon.

你的要求太过分了。