查询词典 pit bottom
- 与 pit bottom 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Analysis indicates that there is little difference in the displacement of tunnel and well control of stratum displacement by both methods. Plastic zone develops more obviously above the tunnel side by CRD method and is larger by CRD method than by dual sidewall guide pit method. It is comparatively obvious that the plasticity district develops in the side direction of the tunnel by dual sidewall guide pit method and the leading influence distance is also longer than that by CRD method. The development speed of plasticity district is comparatively fast in the range of the leading 3~6 m in CRD tunnel and 0~3 m in sidewall guide pit tunnel. There are different advantages by both methods for passing through sand layer.
结果表明,采用这2种工法时引起的隧道变形相差不是很大,都能较好地控制地层的变形;采用CRD法时产生的塑性区较双侧壁法大,且向隧道侧上方发展较为明显;采用双侧壁法时产生的塑性区在隧道侧向发展较为明显,超前影响的距离也大于CRD法;采用CRD法时的塑性区在超前3~6m的范围内发展速度较快;采用双侧壁法时的塑性区在超前0~3 m的范围内发展速度较快;对于隧道穿越砂层而言,2种工法各有优势。
-
During the excavation of a large and deep foundation pit,a trestle bridge is usually needed to build to facilitate the on-the-spot transportation and the foundation pit construction by virtue of the support structure of the pit.
在大型深基坑开挖过程中,常需要利用基坑的支护结构,建造用于方便现场车辆交通及基坑施工的栈桥。
-
Authentic barbecue is traditionally cooked in a pit (prefabricated smoker or fire pit, raised brick or stone fire pit, or even a hole in the ground).
正宗烧烤是在传统的预制吸烟者或火坑一个坑(煮熟,提高砖或石头火坑,甚至在地上挖个洞)。
-
Diversity of soil surface, stone gully and stone pit is 1.199, 1.592 and 1.962; evenness index of soil surface, stone gully and stone pit is 0.616, 0.989 and 1.095; dominance of soil surface, stone gully and stone pit is 0.545, 0.353 and 0.245 in soil macrofauna community structure.
土面生境土壤动物的多样性指数为1.199,石沟的为1.592,石槽的为1.962;均匀性指数为0.616,石沟的为0.989,石槽的为1.095;土面生境土壤动物的优势度为0.545,石沟的为0.353,石槽的为0.245。
-
Diversity of soil surface, stone gully and stone pit is 1.199, 1.592 and 1.962; evenness index of soil surface, stone gully and stone pit is 0.616, 0.989 and 1.095; dominance of soil surface, stone gully and stone pit is 0.545, 0.353 and 0.245 in soil macrofauna community structure.
土面生境土壤动物的多样性指数为1.199,石沟的为1.592,石槽的为1.962;土面生境土壤动物的均匀性指数为0.616,石沟的为0.989,石槽的为1.095;土面生境土壤动物的优势度为0.545,石沟的为0.353,石槽为0.245。
-
All of the other frogs gathered around the pit to see what could be done. When they saw how deep the pit was, they agreed that it was hopeless and told the two frogs in the pit that they should prepare themselves for their fate.
其它青蛙们围在坑前试图做些什么,但当它们看见坑如此之深时,一致认为已经没有希望了,然后,它们告诉这两只在坑里的青蛙,应该为命运做好准备了。
-
Feeding can, output can and etching gas transmission system are connected on the reaction chamber, plate type positive and negative electrodes installed in parallel in the reaction chamber, with the negative pole connected with the water cooling device that connected with seal wave tube and the bottom of the reaction chamber actively, bottom of the water cooling device connecting with the vibrating source through vibrating shift lever, with the seal wave tube, vibrating shift lever and vibrating source on the bottom bracket that fastened to the bottom and installed on the oblique angle adjusting bracket.
本发明反应室上连接投料罐、出料罐和刻蚀气体输送系统,反应室内平行装有板式阳极和阴极,阴极与水冷装置连接,水冷装置通过密封波纹管与反应室底部活动连接,水冷装置底端通过振动转换杆连接振动源;密封波纹管、振动转换杆和振动源位于底架上,底架与反应室底部固定连接并安装于倾角调整支架上。
-
Based on seismic, well logging, drilling and core data, five super sequence boundaries have been identified by using methods of sequence stratigrphy theory in deep formations of Shengping area, northern part of Songliao basion. They are the top boundaries of bed rock (SSB1), the bottom boundaries of Shahezi group (SSB2), the bottom boundaries of Yingcheng group (SSB3), the bottom boundaries of Denglouku group (SSB4) and the bottom boundaries of Quantou group (SSB5) respectively.
应用层序地层学基本理论,在综合分析工区地震、测井、岩心等资料的基础上,确立了超层序界面、准层序和准层序组识别标志,进而对松辽盆地北部升平地区深层进行超层序界面识别,共识别出五个超层序界面,分别为基岩顶面(SSB1)、沙河子组底面(SSB2)、营城组底面(SSB3)、登娄库组底面(SSB4)和泉头组底面(SSB5)。
-
The device for separating and recovering the carbon dioxide from the flue gas by dry process consists of a powder grinding device, a powder feeding device, a fluidized bed, a cyclone separator and a regeneration device, wherein, a flue gas inlet is arranged at the bottom of the fluidized bed, the powder grinding device is communicated with the lower part of the fluidized bed by the powder feeding device, the upper part of the fluidized bed is communicated with the upper part of the cyclone separator by a pipe I, the top of the cyclone separator is provided with an outlet pipe for the flue gas containing low-concentration carbon dioxide, the bottom of the cyclone separator is communicated with the upper part of the regeneration device by a pipe II, the bottom of the regeneration device is communicated with the bottom of the fluidized bed by a pipe III, and the top of the regeneration device is provided with an outlet pipe for the flue gas containing high-concentration carbon dioxide.
本发明提供一种干法分离和回收烟气中二氧化碳的装置和方法,无需分离前对烟气进行降温,而直接在高温下进行二氧化碳的吸收分离,从而避免降温过程中的能量损失;器中干法分离和回收烟气中二氧化碳的装置,由磨粉装置、给粉装置、流化床、旋风分离器和再生装置组成,所述流化床底部有烟气入口,所述磨粉装置通过给粉装置与流化床下部连通,流化床的上部通过管道I与旋风分离器的上部相连通,旋风分离器的顶部有低二氧化碳浓度烟气出口管道,旋风分离器底部经过管道II与再生装置的上部连通,再生装置的底部通过管道III与流化床的底部相连通,再生装置顶部设有高浓度二氧化碳烟气出口管道。
-
A rubber strip (10) may be scalene triangular shape, a trapezoidal shape or a parallelogram shape having has a bottom line (11) forming a strip width, a first diagonal line (12) extending from one end of the bottom line (11) and a second diagonal line (13) extending from the other end (P2) of the bottom line (11), a length (L0) of the bottom line is set to 5 to 50 mm, and a thickness thereof is set to 0.2 to 5.0 mm.
橡胶条(10)的形状可以是不等边三角形、梯形或者平行四边形,上述形状具有形成条宽的底边(11),延伸自底边(11)一端的第一斜边(12)和延伸自底边(11)另一端(P2)的第二斜边(13),底边的长度(L0)设定为5-50mm,其厚度设定为0.2-5.0mm。
- 相关中文对照歌词
- Mosh Pit
- Thug Pit
- Started From The Bottom
- Coming Up
- Bitch In The Pit
- The Root
- Bottom
- Stories (Down To The Bottom)
- Rock Bottom
- Atlantic
- 推荐网络例句
-
This is the inheritance of the tribe of the children of Issachar according to their families, the cities and their villages.
19:23 这些城并属城的村庄就是以萨迦支派按着宗族所得的地业。
-
I've have enough of your garbage.
我听了你的废话。
-
After the website finished, do not lie over to waiting for a guest to fall from the day.
网站做完了以后,别躺在那里等着客人从天而降。