英语人>网络例句>pile 相关的网络例句
pile相关的网络例句
与 pile 相关的网络例句 [注:此内容来源于网络,仅供参考]

The new structure and the county, Hebei Province China Pile Driving Machinery Factory, factory has 30 years, the company developed and produced a series of Piling Machinery total of 10 series over 30 varieties, mainly KQ series of submersible Drilling Rig, KLB walker hydraulic auger drilling rig, DZB multi-rig, CFG series pile driver, car rigs, reverse circulation drill, spiral pile driver, hydraulic walking rig, gravel pumps, drilling and engineering products and related accessories (pipe, drill pipe, drill pipe, drill bit, seal apron);.

简介: 华构牌反循环钻机效率good,反循环钻机;河北省新河县华构桩工机械厂。河北省新和县华构桩工机械厂,建厂已有三十多年,公司研制生产的系列桩工机械共有10大系列30多个品种,主要有KQ系列潜水工程钻机、KLB液压步履式长螺旋钻机、DZB多功能钻机、CFG系列桩机、汽车钻机、反循环钻机、螺旋桩机、液压步履钻机、砂石泵、工程等产品及相关钻机配件(导管、钻机导管、钻杆、钻头、密封胶圈

The new structure and the county, Hebei Province China Pile Driving Machinery Factory, factory has 30 years, the company developed and produced a series of Piling Machinery total of 10 series over 30 varieties, mainly KQ series of submersible Drilling Rig, KLB walker hydraulic auger drilling rig, DZB multi-rig, CFG series pile driver, car rigs, reverse circulation drill, spiral pile driver, hydraulic walking rig, gravel pumps, drilling and engineering products and related accessories (pipe, drill pipe, drill pipe, drill bit, seal apron);.

华构牌反循环钻机效率good,反循环钻机;河北省新河县华构桩工机械厂。河北省新和县华构桩工机械厂,建厂已有三十多年,公司研制生产的系列桩工机械共有10大系列30多个品种,主要有KQ系列潜水工程钻机、KLB液压步履式长螺旋钻机、DZB多功能钻机、CFG系列桩机、汽车钻机、反循环钻机、螺旋桩机、液压步履钻机、砂石泵、工程等产品及相关钻机配件(导管、钻机导管、钻杆、钻头、密封胶圈

pile driving resistance, strength of pile shaft, pile driving analysis

沉桩阻力的分析可按应力波理论用波动方程计

The paper focuses on the load distribution and load transfer among soil, pile-core and pile-socket, the interactive behavior of cement-soil ring and reinforced concrete core and some corresponding factors influencing the displacement of the pile which include the various core length, the section radius, the elastic modulus of soil and cement–soil etc.

着重分析了砼芯水泥土搅拌桩的竖向荷载在桩身内外芯和桩土各部分间的分配,砼内芯桩与水泥土外芯桩在荷载传递过程中的相互作用和共同工作特性,以及影响单桩沉降的因素包括砼内芯的直径和长度、水泥土和桩周土体的弹性模量等。

Two important parameters (pile top stress ratio and pile end stress ratio) of "pile settlement method" and its experience formulas were presented by model experiment and numerical simulation.

通过与模型试验和工程实测时比分析表明,采用桩体沉降法计算的沉降童与实测数据相吻合,可以认为是工程设计的一种可靠方法。

Taking navigation mark in Hongze lake as an example,this paper introduces the determination and design principle of cast-in-situ pile structure,elevation of pile top,ice load and ship impact force,so as to promoting the application of cast-in-situ pile in navigation mark engineering.

为确保船舶的安全通航,航标多采用固定标,其桩基多采用钢筋混凝土灌注桩,以洪泽湖区航标工程为例,对其灌注桩设计结构形式、桩顶标高、冰荷载、船舶撞击力的确定和设计原理进行阐述,旨在推进灌注桩在航标工程中的应用。

Model YTR150 rotary pile drill is another high performance rotary pile drill developed on the basis of model YTR230, featuring high torque, high maneuverability, low noise, low pollution, high operation efficiency and easy maintenance. The major specifications have reached those of foreign similar products. Model YTR150 rotary pile drill adopts hydraulic retractable crawler chassis made by Caterpillar. Its mast is lifted and lowered in full range with verticality automatically adjusted. Operating status parameters displayed by touch screen and monitor. Hydraulic pilot control is used for overall machine operations and load sensing hydraulic system and programmable logic controller are adopted to implement automation for easy and agile operation.

YTR150型旋挖钻机是在YTR230的基础上开发出来的又一种高性价比的旋挖钻机,具有大转矩、机动灵活、低污染、低噪声、施工效率高及维护方便等特点,主要性能参数达到国际同类产品水平YTR150型旋挖钻机采用了卡特彼勒生产的液压可伸缩式履带底盘,桅杆全程自动起落,自动调整桅杆垂直度,触摸屏和监控器可以直接显示工作状态的参数,整机操纵上采用液压先导控制,采用负荷传感液压系统和可编程控制实现自动化,使用方便灵活。

The company's main products are: BZ-20ES, BZ-18ES utility mining loaders, the equipment can be used for ballast Tunnels, finding the top, were seized at the end, multi-wall clearance, is a sophisticated tunnel construction machinery; needle beam,穿行Top-and-steel arch concrete lining vehicles; wheel, the rail-lines, electric and internal combustion and hydraulic models at 2.5 M3, 3M3, 5M3, 6M3 series of concrete mixing tanker transport, steel Gongjia Bending special equipment - cold-formed; MTR and construction works under pressure by the pile-pipe, steel support, the steel tube PURLIN; works for pulling the pipe wall lock pile with all the various models of hydraulic Stubbs pile driver; Various public facilities used in steel structure, the grid system, and so on.

公司的主要产品有:BZ-20ES、BZ-18ES型多功能挖掘装载机,可用于隧道的装碴、找顶、捡底、多墙清理,是一种先进的隧道施工机械;针梁式、穿行式以及边顶拱式砼衬砌钢模台车;轮式、轨行式、电动式、内燃式和液压式,型号分2.5M3 、3M3、5M3、6M3 系列砼搅拌输送罐车;钢拱架弯曲专用设备---冷弯机;地铁及建筑桩基工程承压用的钢管柱、钢支撑、钢围檩;工程连续墙锁喉管拔桩用的各种型号全液压拔桩机;各种公共设施用的钢结构、网架制安等。

Making use of ABAQUS, the finite element models are constructed of pile with straight shaft and pedestal pile, with soil modeled as Mohr-Coulomb, piles as elastic, and contact pair built between pile and soil.

利用ABAQUS软件建立等截面桩与扩底桩的有限元分析模型,土体用Mohr-Coulomb本构模型,桩体采用弹性模型,在桩土接触面间设立接触对。

Compared with soil destroyed pattern of vertical force and its controlled factor of bearing capacity,it is concluded that pile capacity and its tip resistence have some difference when soil with the same physical mecanic property is used as natural foundation and pile tip resistent layer.Whereas the middle weathering rod Stratum hasn't this property,that is to say it has the same bearing capacity and pile tip resistence.

文摘:通过竖向荷载下土体的破坏模式及其承载能力控制因素的比较,论述了物理力学性能相同的土层作为浅基础的天然地基与桩端持力层时,承载力值与桩端阻力值应存在一定的差异;而中风化程度的同一岩层作为天然地基与桩端持力层时,不具有这方面的差异性,承载力值与桩端阻力值应该相等。

第9/100页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
Pile Of Gold
Pile Driver
Burning Pile
Money Pile
推荐网络例句

Means the parent directory, so this command means to execute "toolchain.sh," which is in the current directory.

代表父目录,所以这个命令就是执行当前目录下的"toolchain.sh"。

Yes,In fact,I'm on our city ream.

是的。事实上我是我们市队的。

The strong ionospheric disturbances caused by the significant magnetic storm appeared on the whole world.

用欧亚大陆地面电离层垂测站资料考察1989年3月12~16日磁暴期间的电离层暴形态及其发展变化。