英语人>网络例句>path 相关的网络例句
path相关的网络例句
与 path 相关的网络例句 [注:此内容来源于网络,仅供参考]

A critical path analysis using computer techniques.

一种使用计算机技术的关键通路分析方法。

Thus, many construction projects have a planned project programme which has been developed using computerized critical path analysis software.

因此,很多承包商通过运用关键路径分析软件对其已制定的进度计划进行优化。

Performing Critical Path Analysis on this sequence allows you to work out possible parallel sequences (ie tasks that can be performed simultaneously).

表演关键路径分析就这一序列可让您的工作的可能并行序列。

According to the time-parameter analysis of critical path method, a mix-integer programme model of additional resources in project construction has been presented.

根据网络计划技术中的关键线路法CPM的时间参数分析,提出了一个工程项目建设过程中附加资源的混合整数规划模型,使建设项目在充分利用自身已有资源的前提下得到附加租赁机械设备和附加资源的使用安排计划,并使所支付的费用最低。

4 Relationship to Other Management Disciplines -16- Documents www.pmway.com Much of the knowledge needed to manage projects is unique to project management (e.g., critical path analysis and work breakdown structures).

管理项目所需的许多知识是专用于项目管理的(如关键路线法和工作分解结构)。

CPA stands for Critical Path Analysis - its the critical dates that must be acheived in order to make the delivery date.

CPA 代表紧要关头的路径分析-它的紧要关头的日期必须为了要约订递送日期,是 acheived 。

Through analysis of system variables, system variables and the relationship between the operating system analysis and critical path analysis back links, a knowledge innovation project system operating model;on the four elements of technology assessment design analysis, research evaluation system built the basic framework.

本文对中国科学院开展知识创新工程在科技布局的调整和优化、组织机构调整以及运行机制改革与管理创新等方面取得的实际成效进行了实证分析,提出了相关的政策建议。

1CF Have procedures been drawn up to ensure that the requirements laid down at various stages of the design phase are implemented (breakdown into elementary tasks planning and critical path analysis)?

为了确保设计各阶段的规范要求得到满足(将设计工作化整为零,对关键的方法制订规划并加以分析)是否制订了程序?

One must be aware of the following in order to understand the NPD process: Analysis of Critical path, proceeding by combine with QMS. Thus one could clearly realize the major check point and stage gate of whole project of QMS process. In the same time, resource allocation and conscientious audition fora critical activity could be processed with such analysis.QMS function helps us to do the job right and well contribute in limited time with limited resources.

了解在新产品发展过程上,运用阶段关卡流程法管理工具,必须注意到:关键流程的分析,并结合品质管理系统来实行,可以清楚整个专案的新产品发展过程中的重要检核点或关卡在哪里,同时可经由此分析,对相关的关键活动进行资源的分配及严密的审核。

Develop project plans including work breakdown, project milestones, critical path analysis, risk management, cost/benefit analysis, staffing plans, project timelines, and project budgets.

职责:1。制定项目计划,包括工作分解,项目里程碑事件,关键路径分析,风险管理,成本/利润分析,人员配置计划,项目进度安排和项目预算。2。

第89/100页 首页 < ... 85 86 87 88 89 90 91 92 93 ... > 尾页
相关中文对照歌词
Straight Path
Path Of The Right Love
Off The Beaten Path
No Hidden Path
Dog
No Path To Follow
The Saint
Backs Turned Looking Down The Path
Thy Word
The Path
推荐网络例句

"The operators will suffer a temporary decrease in the number of consumers and short message services as people may not like having to provide their ID cards for a phone number," Xu Junqi, vice-dean with the Policy-Making Institute of the Telecommunications Research Centre under MII, said yesterday.

信息产业部下属的通信决策研究院副主任徐俊其昨天说:&实行手机实名制后,人们可能不太情愿用身份证注册手机号,所以通信运营商会暂时面临用户减少和短信用户减少的问题。&

I don't believe in make-believe!

我不相信这些虚构的故事。

The edible root of the beet .Fodder preserved in a silo; silage.

贮窖的饲料贮藏在贮窖中的饲料;青贮作物