查询词典 flood
- 与 flood 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Article 41: In floodways, flood channels, flood detention basins and flood storage basins, all land utilization and developments must meet flood control requirements.
第四十一条在防洪河道和滞洪区、蓄洪区内,土地利用和各项建设必须符合防洪的要求。
-
The time from May to September is the active time of hydrological process, which occupies 85% of annual runoff; the spring flood and summer flood are founded in hydrological process, the peak of summer flood is larger than spring flood.
结果表明5-9月为研究流域的水文过程活跃期,该时段内的径流量占全年总径流量的85%;径流过程中存在春汛和夏汛,夏汛洪峰值明显高于春汛。
-
The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.
总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入祊&分洪道工程地质条件分析、&分涑入祊&枢纽工程地质条件分析、&分涑入祊&葛九公路桥工程地质条件分析、&分涑入祊&327国道公路桥工程地质条件分析、&分涑入祊&鹅黄公路桥工程地质条件分析、&分涑入祊&小葛庄总干倒虹吸工程地质条件分析。
-
Basing upon a systematic point, a detailed analysis of temporal and spatial characteristics of the flood-breeding environment, flood-causing factors and disasterbearing body in flood disaster system of Puyangjiang basin was made.
3本文从灾害发生的系统观出发,详尽分析了浦阳江流域洪涝灾害系统中孕灾环境、致灾因子和承灾体三个方面的时空分布特征。
-
The main buildings of resisting flood such as cofferdam and diversion tunnel without the capacity of flood control play a role in flood detention.
围堰和导流洞作为渡汛的主要设施,其没有调节洪水的能力,只能对洪水起到一定的滞洪作用。
-
The generant frequency of flood disaster is high and distributing field is wild, the 50 percent population and 70 percent properties are distributed at the threaten field of flood disaster in China. Flood disaster has caused a huge amount of economical losses and this losses has an increasing trend.
在我国,洪水灾害发生的频率高,分布区域广,全国约有50%的人口,70%的财产分布在洪水威胁区内,每年因洪水灾害造成的经济损失十分巨大,而且呈上升趋势。
-
The results are displayed vividly in virtual scene which is established with program language of Visual C++ and OpenGL. At present flow field simulation manner mostly has time delay, deficient controllability, so this paper brings forward the methods of drawing flow velocity vector graphics with OpenGL in the 3D virtual scene to simulate and analyze flow field. At the same time cross section and flood analysis are completed. Accordingly, it assists flood flow field visualization and provides the more effective analysis method for the flood mathematics model research and application.
针对目前流场模拟方式大多存在模拟时间滞后、缺乏可控性等问题,本文提出基于水力学模型计算得到的流速数据,在三维虚拟场景中利用OpenGL绘制洪水流速矢量图的方法进行流场动态模拟分析,在流速变化较大区域和需要重点观测区域,提取断面,分析断面和洪水淹没情况,从而解决洪水流场数值可视化的问题,为洪水数学模型的研究与应用提供更加直观有效的分析手段。
-
By Monte-Carlo Method the flood discharge risk is calculated with consideration of the uncertainty of flood hydrograph, and the result is compared with that without consideration of the uncertainty of flood hydrograph.
文章最后用蒙特卡洛法分别计算了此工程在考虑洪水过程不确定性和不考虑时泄洪风险值,比较二者的计算结果,后者的风险值明显大于前者,这说明,洪水过程不确定性对泄洪风险的影响不可忽略不计。
-
A flood peak cut coefficient is proposed to measure the affection of the flood hydrograph for the risk calculating of the flood discharge.
本文分析了洪水过程这一不确定性因素,并用洪峰削减系数将洪水过程的不确定性量化。
-
Through a lot of tests,we brought forward a flood water quality control method,analysed the changes of flood well hygroscope ability caused by the changes of water quality control,Predicted flood well's harmful radii and the half life of hygroscope ability changes.
通过大量的试验研究提出了注水水质调控方法,通过以采油二厂七中东八道湾组油藏为主,分析了水质控制指标的变化带来的注水井吸水能力的变化,预测了注水井的伤害半径以及吸水能力变化的半衰期。
- 相关中文对照歌词
- Flood This Shit
- Flood I
- Flood Out The Club
- Holy Light
- Can't Stand The Rain
- Damn The Flood
- The Flood
- The Flood
- Flesh And Blood
- Flood The Block
- 推荐网络例句
-
The small blue capacitor has very high chances to go fully shorted compare to electrolytic capacitor which is very rare.
小蓝电容器具有很高的机会去充分地缩短了比较电解电容器,这是非常罕见的。
-
In the Italian campaigns of 1513 and 1515, when the Swiss won the victories of Novara and Marignan, he acted as army chaplain.
在意大利的运动, 1513年和1515年,当瑞士赢得了胜利,诺瓦拉和marignan ,他担任军队的牧师。
-
Program Director Meini Nicolai says it's a terrible development for the displaced in Darfur.
尼科莱说,对达尔富尔流离失所的人来说,这样的发展态势太糟糕了。