查询词典 factor loading
- 与 factor loading 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This paper discusses the problems met in static test as the setting of datum line beam and reference stake,compaction of main beam by jack,loading side test,and quick and slow loading method,in order to ensure scientificity and accuracy of static test data,and to improve the quality of pile foundation detection and the reliability of detection evaluation result.
对基准梁与基准桩的设置、主梁压实千斤顶、边堆载边试验、慢速与快速加荷法等静载试验中遇到的问题进行了探讨,以保证静载试验数据的科学性和准确性,从而提高了桩基检测工作的质量和检测评定结果的可靠性。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
- 相关中文对照歌词
- The Twang Factor
- Life's Zombies
- Age Ain't A Factor
- Across The Line (Unreleased 2007 Demo)
- Across The Line
- When The Love Factor's High
- Fed
- Chill Factor
- Believe Me
- Stress Factor
- 推荐网络例句
-
I can do simple painting, carpentry and plumbing.
我能做简单的油漆、木工和修水管等工作。
-
The motivations, notations and outline of this work are also given in this chapter.
从这个意义上讲,这些时滞是无害的。然后用实例说明这三个定理的应用和互不包含性。
-
American writer known for his droll epigrammatic verse,much of which appeared in the New Yorker.
纳西,奥格登1902-1971美国作家,因写没有固定韵律的幽默诗而闻名,其中大多数发表在《纽约人》杂志上