英语人>网络例句>construction engineer 相关的网络例句
construction engineer相关的网络例句

查询词典 construction engineer

与 construction engineer 相关的网络例句 [注:此内容来源于网络,仅供参考]

Cultural theory is relative to econdric thary while intellectual cilivization construction is relative to materical cilivization construction, So cultural construction theory derives from intellectual cilivization. We can summarize Deng Xaoping's cultural construction theory in 4 aspects. First, soicalist essential charactedstic is that economic and cilivization prosper together. Second, intellectual cilivization construction is the clementary content of socialist cultual construction.

这个世纪伟人在给我们勾画现代化建设的宏伟蓝图时,始终告诫我们必须对社会主义的经济、政治和文化三者在整个社会历史进程中的互为因果、互为条件、相互促进、协调发展的关系有一个清醒的认识和把握,并由此进一步阐述了社会主义文化建设的基本内容、根本任务和建设手段等问题,成为党在改革开放历史时期领导社会主义文化建设的指导思想。

By applying Talmy's semantic theory of causation, this paper divides the Ba-construction into five categories in terms of its semantic structure, namely, the causing-event Ba-construction, the agent Ba-construction, the author Ba-construction, the instrument Ba-construction, and the undergoer Ba-construction, the major type of which is subdivided into some smaller groups according by their syntactic structures.

本文以Talmy的致使义理论为框架,从致使义的角度重新考察&把&字句的语义,将&把&字句按其语义类型分成致使事件&把&字句,施动者&把&字句,起始者&把&字句,工具&把&字句以及遭遇者&把&字句,并根据其语法结构对其中主要类型做了更细致的分类。

The virtual construction training flow is introduced. Before construction, technicians can rehearse the whole construction process again and again in virtual environment, until they master every detail of the whole construction process. Therefore, that ensures the complicated construction would go with a swing in the construction site.

本文对建筑结构虚拟动态设计方法进行了探索,该方法强调设计人员利用现有的设计和分析软件,沉浸在三维可视化虚拟环境中,对模型进行结构动态优化设计,充分发挥设计人员的想象力和创造力,使设计人员的经验和科学计算完美地结合在一起。

Notification each province quality checks on the content of each in recent years, quality inspection programme clearly basic inspection scope : units in the project area above 2,000 square metres of housing projects under construction; units in the project area above 2,000 square metres of the High decorative renovation of public buildings; 100 million in construction costs of the municipal engineering; ready-mix concrete production enterprises; provincial inspection of the previous year due to the quality of construction entities in the construction enterprises in the construction punishment tracking checks; on the previous year Huosheng "Century Cup" Award of the construction project manager works to check entities; inspection reports received during the works full inspection.

通知中每年省工程质量检查的内容都各有侧重,在近几年的省工程质量检查方案中明确基本的检查范围是:单位工程面积在2000平方米以上在建的房屋建筑工程;单位工程面积在2000平方米以上公共建筑的高级装饰装修工程;工程造价在100万元以上的市政工程;预拌混凝土生产企业;对上年省检查中因工程实体质量妥到处罚的施工企业在建工程进行跟踪抽查;对上年获省&世纪杯&奖的项目经理施工的实体工程实行免检;对检查期间接到举报的工程进行全数检查等。

Our company has completed the Gaobazhou power plant construction, the Three Gorges permanent ship lock forward for water project construction, the Three Gorges permanent ship lock lateral water intake works, the temporary shiplock shiplift of the excavation project, the Three Gorges 35 KWA transmission plant construction, the Three Gorges Su Qin way road construction project, a permanent ship lock intake excavation, the Three Gorges Project Construction old trees Ridge, the Three Gorges Maopingxi Ping Protection Project and the Three Gorges Zuoyou An site formation and road construction, has created the excavation of earth and stone, 500,000 of the M3 Excavation records.

我公司先后完成了高坝洲电站施工、三峡永久性船闸正向取水工程施工、三峡永久性船闸侧向取水口工程、临时船闸升船机段开挖工程、三峡35KWA输变电厂施工、三峡苏覃一路道路修建工程、永久性船闸进水口开挖、三峡古树岭工程施工、三峡茅坪溪坪防护工程及三峡左右岸场地平整和道路修建,曾创造了月土石方开挖50万M3的开挖记录。

The application of HAZOP analysis for surface engineering construction in gas field was discussed too, combined with HAZOP analysis example for surface engineer construction in gas field was discussed too, combined with HAZOP analysis example for surface engineer preliminary design of production test in Longgang gas field.

并结合龙岗气田试采地面工程初步设计HAZOP分析实例,对HAZOP分析方法在气田地面工程建设中的应用进行了初步分析。

Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.

如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。

Xinhua net Beijing on May 11 report a few days ago, a technical parameter that aims to improve engineer work efficiency searchs engine senior engineer online (Gaogong123.com) is born in home, the design that it can be an engineer and purchase the job to offer good settlement method.

新华网北京5月11日电日前,一个旨在提高工程师工作效率的技术参数搜索引擎高工在线(gaogong123.com)在国内诞生,它可为工程师的设计和采购工作提供良好的解决办法。

Guards Tank Brigade (37 T-34), 29 Tank Brigade, 70 Guards, 89(18 T-34), 92 Separate Tank Regiment, 338, 339(17 JSU-152), 378 Guards Heavy Self-propelled Gun Regiment (17 JSU-152), 370, 371, 372 Guards Self-propelled Gun Regiment, 275, 284 Separate Special Destination Motorised Battalion 40, X*}JJi1 Motorised Engineer Brigade, 13, 20 Assault Engineer-Sapper Brigade, 1 Guards. Separate Sapper Battalion, 18 Separate Engineer Battalion, 54, 55, 97 Pontoon-bridge Battalion ?d!vfw7, 28, 40 Separate Flamethrower Battalion !lbRC6

第7近卫坦克旅(37辆T-34),第29坦克旅,第70近卫独立坦克团,第89(18辆)﹑92独立坦克团,第338﹑339重型自行火炮团(17辆JSU-152),第378近卫重型自行火炮团(17辆JSU-152),第370﹑371﹑372近卫自行火炮团,第275﹑284独立特殊任务摩托化步兵营,第1摩托化工兵旅,第13﹑20突击工程兵旅,第1近卫独立营造工兵营,第18独立工兵营,第54﹑55﹑97舟桥营,第7﹑28﹑40独立喷火营}#Ki7j

Such as senior engineer 18 people, engineer 175 people, assistant engineer 65 people.

工厂现有员工2100余人,其中工程技术人员248人,高级工程师18人,工程师175人,助理工程师65人。

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Under Construction
Monkey And The Engineer
The Family
Hey Porter
Hey, Hey, Train
Hey Porter
Ice Cream
Love Engineer
Change In The Making
Wall Around My Heart
推荐网络例句

Objective:To compare the response control and attention of Schizophrenic patients with that of the healthy controls by Integrated Visual and Auditorycontinuous performance test. To quantitate the impairment of cognitive function in patients, and to explore the relationship between cognitive function and the severity of the disorder.

目的:探讨精神分裂症病人在IVA持续操作测试中的反应控制能力、注意力等,并与健康人进行比较,从而量化精神分裂症病人的认知功能损害,并进一步探讨其认知功能与疾病严重程度的关系。

Main effective factors including subcooling degree, mechanical vibration, gas hydrate reformation, environment temperature, noncondensing gas and surfactant are analyzed.

指出过冷度、机械振动、重复生成水合物、环境温度、不凝性气体、添加剂是影响气体水合物生成的主要因素,还对R152a水合物的放冷进行了实验研究。

Water is the construction and development of socio-economic basis,and strategic resources.

水是社会经济建设与发展的的基础性,战略性资源。