英语人>网络例句>connection angle 相关的网络例句
connection angle相关的网络例句

查询词典 connection angle

与 connection angle 相关的网络例句 [注:此内容来源于网络,仅供参考]

There are requirements for connection orders of the inlet wires of three-phase full bridge SCR welding power source when its main circuit adopts Y/△ connection and synchronous transformer adopts Y/Y connection.

主电路为Y/△接法,同步变压器为Y/Y接法的三相全桥晶闸管焊接电源对电源三相进线接入顺序有要求。

According to connection method classification (1) threaded connection valves: valve with internal thread or external thread, and pipe thread connection.

按连接方法分类(1)螺纹连接阀门:阀体带有内螺纹或外螺纹,与管道螺纹连接。

In testing datasets, Snmpguess attack is misjudged as normal connection due to hidden feature transformation. We analyzed this attack connection and re-extract characteristics of the connection. The modified attack detection rates go up from 0.08% to 100%..

此外针对测试资料集中的Snmpguess攻击因特徵转换隐藏的问题,造成此一攻击会被误判为正常连线,我们透过分析此种攻击的连线特性,并重新取出连线特徵,修正后此类型攻击的侦测率由0.08%提升至100%。

The double ends of central tube is penetrated into pipe union nut, chuck ring and seal ring in turn, and the central tube is penetrated into ladder-shaped public connection, push the seal ring and chuck ring of double end into the ladder-shaped public connection separately, the thrash pipe union nut is heave, is credible tight connection.

将中心管两端依次穿入由壬螺母、压环、密封圈,并将中心管穿入梯形公接头内,分别将两端的密封圈,压环推入梯形公接头内,锤击由壬螺母凸起,即可靠密封连接。

The double ends of central tube is penetrated into pipe union nut and seal ring in turn, and the central tube is penetrated into ladder-shaped public connection, push the seal ring and chuck ring of double end into the ladder-shaped public connection separately, the thrash pipe union nut is heave, is credible tight connection.

将中心管两端依次穿入由壬螺母、密封圈,并将中心管穿入梯形公接头内,分别将两端的密封圈,压环推入梯形公接头内,锤击由壬螺母凸起,即可靠密封连接。

The connections studied herein were top-and-seat angle connection, including minor axis web connection and two type new connections designed according to the force-displacement character of minor axis joints.

进行了三种类型的梁柱弱轴角钢连接共9个试件的单调加载试验,其中两类试验试件采用本文根据梁柱弱轴连接节点受力变形特点设计的新型连接形式。

Size 1/2"(15mm) dual connection, solder or male IPS x 3/4"(20mm) hose thread connection, angle pattern

BD1C -通径DN15双连接,焊接或外螺纹铁管连接端口 x DN20软管螺纹连接端口,角式

It is given that the connection between interception probability and orbit intersection angle as well as time error under the instance that the main body of objective satellite is destroyed. The choice of orbit intersection angle is expatiated when time error exists by simulation calculation.

研究了对目标卫星主体毁伤情况下,轨道交角和交会时间偏差与拦截卫星拦截概率之间的关系;阐述了有一定交会时间偏差时,轨道交角的选择情况,并对其进行了仿真计算。

When creating the finite element model, complicated connections among howitzer components are considered, especially the large displacement slide and the nonlinear spring connection between gun tube and cradle rail. The gun firing at 0°direction angle and 0°elevating angle is simulated with explicit time integration method and implicit time integration method, and the similar results are obtained.

在建立有限元模型时,考虑了火炮各部件间复杂连接,尤其是身管与摇架导轨间的大位移滑动接触和非线性弹簧单元连接等非线性问题;分别应用显式积分程序和隐式积分程序模拟了火炮在0°高低射角、0°方向射角工况下的发射过程,得到了相近的结果。

When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

第10/50页 首页 < ... 6 7 8 9 10 11 12 13 14 ... > 尾页
相关中文对照歌词
L.A. Connection
Connection
Uncommon Connection
Intimate Connection
Angles
Angle Park
Heavy Connection
Connection
Connection
How We Kill Stars
推荐网络例句

If you were not , and OS X just booted normally, have no fear.

如果你没有,和OS X刚刚启动通常,没有恐惧。

I only want to preserve our all .

我只想保存好我们的一切

You know, there is nothing like exponential improvement.

你知道,没有像~者有指数的进步。