英语人>网络例句>cell bridge 相关的网络例句
cell bridge相关的网络例句

查询词典 cell bridge

与 cell bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

The invention includes a bridge, a bridge traveling mechanism, a crane trolley, a telescopic boom and a telescopic traveling mechanism; wherein the bridge traveling mechanism drives the bridge to travel longitudinally along the track on elevated beams on the two sides; the crane trolley travels laterally along the track on the bridge; the telescopic boom is arranged between the crane trolley and the bridge, the crane trolley travels laterally along the track on the telescopic boom; and the telescopic traveling mechanism drives the telescopic boom to travel laterally along the track on the bridge.

本发明包括桥架、桥架运行机构、起重小车、伸缩臂和伸缩运行机构;其中,所述桥架运行机构驱动所述桥架沿两侧的高架横梁上的轨道纵向运行;所述起重小车沿所述桥架上的轨道横向运行;所述伸缩臂设置在所述起重小车和所述桥架之间,所述起重小车沿所述伸缩臂上的轨道横向运行;所述伸缩运行机构驱动所述伸缩臂沿所述桥架上的轨道横向运行。

In the gravid uterus, The CKs immunolabelling were detected in glandular cell, luminal epithelial cell, traphoblast cell, endoblastic cell and allantoic cell; Vimentin immunolabelling were detected in stromal cell and endoblastic cell; CK7 immunolabelling were not detected in any tissue of the yak utenus but in endoblastic cell and some luminal epithelial cell.

对分离得到的子宫内膜基质细胞和子宫内膜腺上皮细胞进行免疫组织化学标记的结果显示在体外子宫内膜基质细胞表达泛角蛋白,子宫内膜腺上皮细胞表达波形蛋白,并且这一特性不因为传代而发生丢失。

2B8a was weakly reactive to neutrophils (23.72%) and negative for T cells, NK, DC, RBC and Plt. The antibody reacted to all 3 marrow CD34+ cells with an average positive rate of 39.33% while it was negative for G-CSF-mobilized CD34+ peripheral blood stem/progenitor cells (PBSC, 1.25%). Cell line analysis showed that the antibody notably reacted to three out of 4 cell lines (Raji, SMS-SB, Nalm-6 and Nall-1) with the positive rates of 98.78%, 98.61%, 94.93% respectively and weakly to one of them with 5.68% in B lineage cell lines and monoblastic cell line (U937, 67.78%) while it was only weakly positive or negative for other myeloid leukemia cell lines including Meg01 (33.40%), HL-60 (29.70%),K562 (28.19%), KG1a (16.23 %) and HEL92.1.7 (8.02%). Among 4 T lineage leukemia,5 neuroblastoma and 1 colon cancer cell lines tested, only Molt-3 was found weakly positive (31.40%) for 2B8a, while the remaining 3 T cell lines (Molt4, JM and CCRF-CEM), 5 neuroblastoma cell lines (LA-N1, KCNR, BE, SK-N-SH, SK-N-AS) and the colon cancer cell line (HR8348) tested were negative.

结果表明: 2B8a抗原在外周血B细胞上表达(3/3例,平均阳性细胞数为26.29 %),而在T淋巴细胞和NK细胞上不表达(0/3例);在粒细胞和单核细胞上阳性表达均为2/3例,平均阳性细胞数分别是23.72 %和59.84 %;在DC细胞、红细胞和血小板上均不表达(0/3例)。2B8a抗原在骨髓CD34+细胞上的阳性表达是3/3例,平均阳性细胞数39.33 %,而在G-CSF动员的外周血CD34+细胞上的阳性表达仅1/3例,平均阳性细胞数为1.25 %。2B8a抗原在B系细胞系Raji、SMS-SB、Nalm-6和Nall-1上的平均阳性细胞数分别为98.78 %、98.61 %、94.93 %和5.68 %;在T系细胞系Molt-3上的平均阳性细胞数为31.40 %,而在Molt-4、JM和CCRF-CEM 细胞上不表达;在髓系细胞系U937、Meg-01、HL-60、K562、KG1a和HEL92.1.7上的平均阳性细胞数分别为67.78 %、33.40 %、29.70 %、28.19 %、16.23 %和8.02 %;在神经母细胞瘤细胞系SK-N-SH、KCNR、BE、LAN-1和SK-N-AS细胞以及结肠癌细胞系HR8348细胞上均不表达,而在羊膜细胞系FL细胞上呈一定的阳性表达,平均阳性细胞数为45.03%。

Cell line analysis showed that the antibody notably reacted to three out of 4 cell lines (Raji, SMS-SB, Nalm-6 and Nall-1) with the positive rates of 98.78%, 98.61%, 94.93% respectively and weakly to one of them with 5.68% in B lineage cell lines and monoblastic cell line (U937, 67.78%) while it was only weakly positive or negative for other myeloid leukemia cell lines including Meg01 (33.40%), HL-60 (29.70%),K562 (28.19%), KG1a (16.23 %) and HEL92.1.7 (8.02%). Among 4 T lineage leukemia,5 neuroblastoma and 1 colon cancer cell lines tested, only Molt-3 was found weakly positive (31.40%) for 2B8a, while the remaining 3 T cell lines (Molt4, JM and CCRF-CEM), 5 neuroblastoma cell lines (LA-N1, KCNR, BE, SK-N-SH, SK-N-AS) and the colon cancer cell line (HR8348) tested were negative.

结果表明: 2B8a抗原在外周血B细胞上表达(3/3例,平均阳性细胞数为26.29 %),而在T淋巴细胞和NK细胞上不表达(0/3例);在粒细胞和单核细胞上阳性表达均为2/3例,平均阳性细胞数分别是23.72 %和59.84 %;在DC细胞、红细胞和血小板上均不表达(0/3例)。2B8a抗原在骨髓CD34+细胞上的阳性表达是3/3例,平均阳性细胞数39.33 %,而在G-CSF动员的外周血CD34 细胞上的阳性表达仅1/3例,平均阳性细胞数为1.25 %。2B8a抗原在B系细胞系Raji、SMS-SB、Nalm-6和Nall-1上的平均阳性细胞数分别为98.78 %、98.61 %、94.93 %和5.68 %;在T系细胞系Molt-3上的平均阳性细胞数为31.40 %,而在Molt-4、JM和CCRF-CEM 细胞上不表达;在髓系细胞系U937、Meg-01、HL-60、K562、KG1a和HEL92.1.7上的平均阳性细胞数分别为67.78 %、33.40 %、29.70 %、28.19 %、16.23 %和8.02 %;在神经母细胞瘤细胞系SK-N-SH、KCNR、BE、LAN-1和SK-N-AS细胞以及结肠癌细胞系HR8348细胞上均不表达,而在羊膜细胞系FL细胞上呈一定的阳性表达,平均阳性细胞数为45.03%。

The design feature proceed know clearly systematic analysis of the text versus canting pull steel tube concrete arch bridge, it is above "joist type built-up arch bridge" architectural characteristic analytic foundation to said bridge type, certain technical characterstic point syntheses handle to oneness new bridge type among steel tube concrete arch bridge, stayed-cable bridge type.

本文对斜拉钢管混凝土拱桥的结构特点进行了系统的分析,该桥型是在"桁式组合拱桥"结构特性分析的基础上,将钢管混凝土拱桥、斜拉桥等桥型中的某些技术特点综合运用于一体的新桥型。

It is the image body of the feudalism grade system again now:The in the center the most outstanding 雕 wears the bridge noodles of the 蟠 dragon pillar head, emperor one person pass, call"resist road bridge";Two or so 雕s have lotus flower pillar the bridge noodles of the head, the prince passes, calling "princes and dukes bridge";Then both sides of, allows three articles above text martial big minister to pass, calling "grade bridge";Depending the common ectype stoning bridge of side most was four articles following officialdom and soldier to walk of, calling Mr.

它又是封建等级制的形象体现:中间最突出的一座雕着蟠龙柱头的桥面,只许皇帝一人通过,叫"御路桥";左右两座雕有荷花柱头的桥面,只许亲王通过,叫"王公桥";再两边的,只许三品以上的文武大臣通过,叫"品级桥";最靠边的普通浮雕石桥,才是四品以下官吏和兵了走的,叫"公生桥"。

The mechanical behavior of Shape Memory Alloys material is tested, and the constitutive model of the SMA is established. A kind of SMA combined rubber isolator is developed, and the isolation effect of the SMA combined rubber isolator for long-span bridge and tall building structures is numerically simulated, from which the adaptive isolation performance and the self-restoring capacity of the SMA combined rubber isolator are verified. A kind of SMA damper is developed, the mechanical behavior of the SMA damper is tested, and the model of restoring force of the SMA damper is established. The theory and method of adaptive control based on the SMA damper for the long-span bridge are built, and the effectiveness and reliability of the adaptive control for the long-span bridge using the SMA damper are verified through numerical simulation and model test. The MRF-04K type magnetorheological damper is developed, the mechanical behavior of the MR damper is tested, and the model of restoring force of the MR damper is established. The theory and method of adaptive control based on the MR damper for the long-span bridge and tall building structures are built, and the effectiveness and reliability of the adaptive control for the long-span bridge and tall building structures using the MR damper are verified through numerical simulation and model test. In addition, the theory and method of sub-structural damage identification for long-span bridge are derived, the influence of soil-structure dynamic interaction on the seismic isolation and control effects with different isolation and control measures and the damage responses and the sliding base-isolation of large structures under the excitation of underground explosion are investigated.

试验研究了形状记忆合金材料的力学性能,建立了SMA材料的本构模型;研制了一种SMA复合橡胶隔震支座,数值仿真分析了应用SMA复合橡胶支座的大跨桥梁和高层建筑结构的隔震效果,从而验证了SMA复合橡胶支座的自适应隔震性能及其震后自恢复能力;研制了一种SMA阻尼器,试验研究了SMA阻尼器的力学性能,建立了SMA阻尼器的恢复力模型,建立了基于SMA阻尼器的大跨桥梁结构自适应控制理论与方法,通过数值仿真与模型试验验证了大跨桥梁结构SMA阻尼器自适应控制的有效性与可靠性;研制了一种MRF-04K型磁流变阻尼器,试验研究了MR阻尼器的力学性能,建立了MR阻尼器的恢复力模型,建立了基于MR阻尼器的大跨桥梁和高层建筑结构的自适应控制理论与方法,通过数值仿真和模型试验验证了大跨桥梁和高层建筑结构MR阻尼器自适应控制的有效性与可靠性;还建立了大跨桥梁结构的子结构损伤识别的理论与方法,研究了土-结构动力相互作用对不同隔震和控制措施的减震控制效果的影响以及地下爆炸波作用下各类大型结构的灾害响应与滑移隔震。

Lo Wu Bridge is not only a narrow bridge at the time, only moving train, but no bridge unroofed shed, left to sun and rain. In 1959, the government will be the Lo Wu Bridge turned into steel and concrete bridge deck has also widened more than doubled. 1962, also stamped with an iron Peng Ding, added in the iron bridge on both sides of the iron railing, and covered the sidewalk. The 20th century, the early 70s, the author in Guangzhou Railway Administration to do secretarial work, on several occasions to the Footbridge is the first walk.

当时的罗湖桥不但桥面狭窄,只能行驶火车,而且桥身无顶无棚,任凭雨淋日晒。1959年,人民政府将罗湖桥改建成钢筋水泥桥,桥面也加宽了一倍多。1962年又加盖了铁皮篷顶,在铁桥两侧增设了铁栏杆,并铺上了人行道。20世纪70年代初,笔者在广州铁路局做秘书工作,曾多次到罗湖桥头漫步。

Based on rail/wheel reaction and track/bride reaction theory and systems engineering theory, new vehicle-track and vehicle-track-bridge system dynamic models are established and discussed in details, including ballast track model and ballastless track model. The characteristics of the models are:(1) vehicle-track and vehicle-track-bridge system dynamic models are coupled in vertical and lateral;(2) track vibration on bridge is taken in account, track on bridge is considered as one or two layer continuous-point supported rail model, according to actual track structure, interaction between vehicle and bridge transfer from track structure;(3) three type of ballastless track models (tieembanked, elastic-tie-block, slab track) are presented;(4) models reflect the main feature of actual vehicle, track and bridge structure, the response computation frequency of models is relatively broad, which can be applied to analyze both low frequency and high frequency vibration.

基于轮轨相互作用和线桥相互作用特点,本文从系统工程角度出发建立了车辆、有碴轨道和无碴轨道、简支箱梁桥垂向和横向耦合系统动力分析模型,该系统模型具有以下特点:(1)车线、车线桥体系均考虑为垂向、横向耦合振动系统,车线间通过轮轨接触几何关系耦合,轨道与桥梁间通过轨道与梁体间的力与位移协调条件耦合;(2)充分考虑桥上线路在车线桥系统中参振作用,根据桥上线路轨道结构特点将桥上轨道结构模型具体化,即对桥上轨道结构视为多层支承体系,车桥间的动力作用通过轨道结构来传递;(3)建立了三种形式无碴轨道动力分析模型,即长轨枕埋入式、弹性支承块式和轨道板式无碴轨道模型;(4)系统模型详细,分析频带宽,适用范围较广。

In the interim governance new river dug river 3.3 kilometres, the new zoo at the locks, new long river bridge, forklifts official, Beijing kits Railway Bridge, Highways and Bridges Academy, timber building bridges, small East Village West Bridge, the small East Village Bridge, MTR Cheliangduan, xinjiekou Main Street Bridge, North riparian communities a total of 11 blocks across the bridge, one Block secret scheme, two blocks ran Jiezhizha 2 Block Terminal 1 Block, fill water gates, the original half-buried in the ground with heavy river finally light.

在此次治理中转河新挖河道3.3公里,新建动物园船闸一座、新建长河桥、叉车厂桥、京包铁路桥、学院路桥、木材大厦桥、东小村西桥、东小村东桥、地铁车辆段、新街口大街桥、北滨河路桥共11座跨河桥,1座暗涵,2座暗沟节制闸,2座码头,1座补水闸,原来被埋在地下的一半转河终于重见了天日。

第2/50页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
London Bridge Is Falling Down
Shell Shock
Clemenceau
Cell-29
Cell Phone
Send A Hell
Under The Bridge
Put It In A Love Song
Jailhouse Rock (Live)
Take It To The Bridge
推荐网络例句

It's not quite as simple as that.

并没有那么容易。

It debuted in 1992 in Japan and the United Kingdom, and 1993 in the United States.

它首次亮相于1992年在日本和英国,在美国1993年。

Nevertheless, moving free game confluence inchoately is driven is overflowed mostly adapt make game, game needs have the aid of to move the consequence that overflows successful work to win a player.

不过,早期的动漫游戏融合大多是从动漫改编成为游戏,游戏需借助动漫成功作品的影响力赢得玩家。