查询词典 buttress thread
- 与 buttress thread 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In swampy places, plants occurred in big clumps with individuals as high as 1.8 m with buttress roots, but those in dryer, rocky habitats are noticeably 'stockier'.
在沼泽地区,沼泽君子兰会呈大片大片群落出现,有些植株在根系扶持下,会高达1.8米,而在那些相对干燥的地区,植株则明显矮壮。
-
Based on engineering practice,the paper introduces in detail the construction technique of abutment on pier top and temporary buttress,the construction technique at 0 section,the construction technology of casting concrete for cantilever and cast-in-situ concrete section for side span and the construction technology at closure section ,sums up the key construction technique of conti.
结合该工程实际,对墩顶支座及临时支墩施工技术、0号段施工技术、悬臂浇筑及边跨现浇段施工工艺、合龙段施工工艺等进行了详细的介绍,总结了大桥连续刚构关键施工技术,实践证明这些施工工艺和控制技术是可行的,为以后类似工程提供了借鉴。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Jane covered with tile-ridge, with Qian Yan Gallery, Yan Zhu 4, 7 brackets, known as the "hidden carved brackets", was recorded on the early history of the "arch buttress" the example of the kind, Taiyuan only one example of this.
覆以简瓦素脊,前檐带廊,檐柱四根,斗拱七朵,俗称&隐刻斗拱&,是早期史籍上记载的&扶壁拱&的实物例证,太原仅此一例。
-
1 Condenser on evaporative cooling hydro-generator (generator/motor) shall be collocated evenly on buttress pier of upper bracket or on concrete wall in generator turbine pit.
1 蒸发冷却水轮发电机的冷凝器尽量均匀的布置在上机架的支墩上或布置在发电机机坑内的混凝土墙壁上。
-
The elimination of measures: an additional pipeline and buttress the town pier, reinforced pipe support to change the operating parameters, change operating parameters to avoid the resonance zone.
消除措施:加设管道镇墩和支墩,加固管道支撑,改变运行参数,改变运行参数避开共振区。
-
See also buttress root.
参见 buttress root。
-
Today's physicists cists craft their equations on desktop computers and buttress them with hard data——they have tracked neutrinos in their eccentric flight .
气象学家利用计算机模型更为准确地预测会造成生命和财产损失的飓风的路线。
-
Objective To explore the clinical effects of internal fixation complicated type C femoral condyle fracture using AO buttress plate of femoral condyles.
目的 探讨应用AO股骨髁支持钢板治疗C型髁部骨折的效果。
- 相关中文对照歌词
- Hanging By A Thread
- Our Lady Of Pigalle
- Let It Go
- Pendulous Threads
- Weave On
- Thread
- Hanging By A Thread
- Beat The Devil's Tattoo
- Like
- Hangin' By A Thread
- 推荐网络例句
-
There are different types of personal loans available.
有许多不同类型的个人贷款优惠。
-
The above mentioned teaching model of spiral rising can be used to avoid rigidness in teaching.
上述螺旋式上升的教学模式,可以避免教学形成模式後的僵化现象。
-
In addition, the mass transfer process of main components in the heat pump cycle, such as a generator and an absorber, is analyzed, and the mass trasfer model, the relation of its separation effectiveness with the thermodynamic inconvertibility are described.
根据热力学第一、二定律,从理论上建立了描述该类热泵的数学模型。从热力学不可逆性原理出发,分析了热泵循环过程的热力学不可逆性引起的〓损失。