英语人>网络解释>bridge construction 相关的网络解释
bridge construction相关的网络解释

查询词典 bridge construction

与 bridge construction 相关的网络解释 [注:此内容来源于网络,仅供参考]

approach spans:引桥

正桥; 主桥 main bridge | 引桥 approach spans | 上承式桥 deck bridge

cable-stayed space trusses:斜拉空间析架

独塔斜拉桥:Single-pylon cable-stayed bridge | 斜拉空间析架:cable-stayed space trusses | 结合梁斜拉桥:composite girder cable-stayed bridge

collision prevention of pier and abutment:桥梁墩台防撞

桥梁浅基防护 bridge shallow foundation protection | 桥梁墩台防撞 collision prevention of pier and abutment | 桥梁水毁 bridge disaster by flood

after bridge:尾驾驶室

after breast 后横缆 | after bridge 尾驾驶室 | after bridge 尾驾驶台

after bridge:尾桥楼

after bridge 尾驾驶台 | after bridge 尾桥楼 | after brow 船尾跳板

bridge after BHD:荍艛后端壁

荍艛前端壁 bridge front bulkhead | 荍艛后端壁 bridge after BHD | 瓽板角材 gusset angle

bridge after bulkhead:[舟+乔]艛后端舱壁

manning the rail 站[舟+皮] | bridge after bulkhead [舟+乔]艛后端舱壁 | bridge front bulkhead [舟+乔]艛前端舱壁

Aqueduct bridge:渠桥

aqueduct 水管 | aqueduct bridge 渠桥 | aqueduct bridge 渡槽

the part of a bridge or an arch between one vertical support and another:(桥或拱的)墩距,跨距,跨度

These forests cover a broad span of latitudes. 这些... | the part of a bridge or an arch between one vertical support and another (桥或拱的)墩距,跨距,跨度 | The bridge crosses the river in a single spa...

roller bascule bridge:滚动式竖旋桥

roller balance bridge 滚动式竖旋桥 | roller bascule bridge 滚动式竖旋桥 | roller bearing 滚轴支座

第41/50页 首页 < ... 37 38 39 40 41 42 43 44 45 ... > 尾页
相关中文对照歌词
Under Construction
London Bridge Is Falling Down
Ice Cream
Under The Bridge
Take It To The Bridge
Change In The Making
Wall Around My Heart
My Arms Are The Brooklyn Bridge
I'd Rather Drown
Bridge To Love
推荐网络解释

Are you well supplied with peelings:你这里的材料够用吗

That always got 'em groaning but kept 'em strong.|这食物总是让他们鬼叫 但让他们身体强... | Are you well supplied with peelings?|你这里的材料够用吗? | These'll do. Only a day old.|我这儿有很多 只放了一天

screen printing ink:网孔版油墨

导线油墨 wire marking ink | 网孔版油墨 screen printing ink | 誊写油墨 stencil ink

ballottement:浮球感

清除伤口内的污物和异物,孕妇监护主要通过定期的产前检查(antenatal care)来完成,应从确诊早孕时开始.测而较硬,且有浮球感(ballottement)时则为胎头,推动胎头胎背不受影响.如为胎臀则可(Prehospital Emergency Care) ,