英语人>网络例句>滑 相关的搜索结果
网络例句

与 滑 相关的网络例句 [注:此内容来源于网络,仅供参考]

The characteristics of landslide body and bed are then summarized. Falling accumulation is primary and diluvium and alluvium are subordinate to the accumulative stratum landslides in horizontal stratum. The forming mode have six steps: a cliffy forming, b landslide bed forming, c bottom matter of landslide body forming, d soil and stone forming and, e the surface matter forming and disaggregating.

通过总结万州堆积层坡的体和床特征,得出了近水平地区堆积层坡的物质来源和结构成因为:崩塌堆积为主,冲、洪积为辅;形成模式为:后部陡壁形成,床形成,体底部物质形成,体土石混合体形成,体表层物质形成,动解体等6个阶段。

Classing by configuration:ball bearing slide/runner(Telescopic slides,Telescopic rails),drawer runner,metal box drawer systems(single wall steel drawer systems),metal drawer systems(double walled drawer systems,tandembox drawer),concealed drawer runner(undermount drawer slides,hidden drawer slide), table extension slides,Karun runner,CONCEALED BALL BEARING SLIDE,Full Extension Concealed Metal Drawer Runners--called by professionist

按结构分类:钢珠轨,喷粉轨,侧板抽屉轨,骑马抽屉导轨,隐藏式抽屉轨,餐台轨,凯林轨,隐藏式钢珠轨--业内专业人分类

Title slide Overview slide Main slides Conclusion slides References slide Title 10-12 words long Include 3 topical phrases Your name Date assignment is due Put your main points ONLY -Does not include title, overview, conclusion -All main points should be slides later 2-9 bullets -3 main point slides=3bullets Meaningful titles At least one slide for each bullet of overview Suggestions:-4 by 4: four bullets, four words long -At least 2 bullets; no more than 5 -10-25 words on a slide -No bullet should split a line Wrap up with your most important points Recommendations ok 3-4 bullets Not the same as your overview Only list web page and published sources Essential information -Author -Title of work -Date of publication -From the web, put Date of retrieval URL 10-12 words in title (3 class topics) On overview, list main point only No multi-line bullets Wrap up everything at the end -What do you want audience to remember?

名称 概观主要部份动结论动叁考名称 10-12个字渴望包括 3个谈论的片语你的名字日期任务是应得的东西放你的主要观点唯一的-不包括名称、概观,结论-所有的主要点应该是比较迟的 2-9个子弹-3 主要的点=3个子弹意义深长的名称至少,为概观的每个子弹动提议:-44:四个子弹,四个字渴望-至少 2个子弹;不超过 5 在上的-10-25个字-子弹不应该分离一条线以你最重要的观点穿得暖和忠告 ok 3-4个子弹不相同于你的概观只有目录网页而且公开了来源必要的数据-作家-工作的名称-出版的日期-从网,被放取回的日期网址在名称中的 10-12个字(3个班级主题)在概观上,目录主要部份点唯一的没有多线子弹在最后穿得暖和每件事物-你想要听众记得什么?

According to the characteristics and construction requirements, to develop the basis of elevation from the beginning of silo slipform construction used, sliding up to 4.3 meters above sea level, the reinforced air slide 5.15 meters; Party to begin construction within the building and the warehouse floor, after the completion of sliding mode Then slide up to 26 meters warehouse roof, sliding mode to remove.

根据工程特点及工期要求,拟定筒仓从基础标高开始采用模施工,升至标高4.3米时,加固空到5.15米;甲方开始施工仓内建筑及库底板,完工后模接着升至仓顶26米,模拆除。

[Objective]To explore the technique of arthroscopy plus radiotherapy in the treatment of pigmented villonodular synovitis of the knee and to evaluate its clinical value[Method]A total of 14 cases of pigmented villonodular synovitis of the knee were treated from January 2000 to July 2003Intraarticular excision under arthroscope with a combined application of routine intrusments and Bipolar radiofrequency was performed on all these 14 cases,and postoperative radiotherapy for diffused pigmented villonodular synovitis of the knee,13 patients were followed up for 10~45 months,and were evaluated for range of motion,pain,swelling effusion[Result]Thirteen cases according to the International Knee Documentation Committeecriteria,subjective knee score was (587+64) and (865 ±57) respectively before surgery and at the last followup[Conclusion]In case of pigmented villonodular synovitis of the knee joint,arthroscopical synovectomy can make good surgical results,and postoperative radiotherapy is an effective treatment for diffused pigmented vilionoclular synovitis of the knee

作者:王晓旭,廖瑛,黄华扬,席雅文,李朝旭,韩志关节镜;放射治疗;膝关节;膜炎;色素绒毛结节性摘要:[目的]探讨采用关节镜结合放射治疗膝关节色素沉着绒毛结节性膜炎的方法及其临床应用价值。[方法]2000年1月~2003年7月,共收治14例膝关节色素沉着绒毛结节性膜炎患者,采用关节镜下常规器械加双极射频进行关节内病变切除,术后弥漫性色素沉着绒毛结节性膜炎辅以放疗,13例通过10~45个月的随访,了解患膝活动度、疼痛、肿胀情况。[结果]13例随访患者,术前国际膝关节评分委员会膝关节功能主观评分为(587±64)分,最后随访时,IKDC膝关节功能主观评分为(865±57)分。[结论]通过关节镜能完成膝关节色素沉着绒毛结节性膜炎膜较彻底切除,对弥漫性膝关节色素沉着绒毛结节性膜炎辅以术后放疗是一种有效方法。

The classifications, characteristics and recent applications of sliding construction are summarized. Some key technologies of sliding construction such as calculation of sliding drift load, sliding nonsynchronous affection, sliding dynamic response, stability of sliding blocks, and affection on structural mechanics for different sliding blocking have been researched, and the corresponding programs have been coded.

总结了移法施工的分类、特点以及应用情况,对于移法施工牵引力的计算、移不同步影响、移法施工激振影响、移施工过程中的单元分块稳定性研究、移分块对结构成型影响等关键问题进行了理论推导与算例分析,并编制了相关的实用程序。

A spring-block model to forecast the movement of sliding body is presented, in which the deformation and speed inhomogeneousness of sliding mass, the energy conversion and dissipation and the friction on the slip surface are also considered. The deformation of single sliding body in the whole sliding process can be determined by numerical method.

考虑到落体动过程的速度和变形的不均匀性、变形能的积累与释放以及体与床的摩擦等,建立了落体运动的弹簧块模型,该模型通过数值计算的方法可以计算落体动全过程的变形。

On the instrument cabinet, there is power switch, start switch, stop pushbutton, main engine exhaust thermometer, lub oil pressure gauge, lub oil thermometer, cooling water thermometer, main engine revolution indicator, starting battery voltmeter, cooling water high temperature and lub oil low pressure alarm device; beside the gear box, there is working oil pressure gauge, lub oil thermometer, lub oil low pressure alarm , working oil low pressure alarm and lub oil high temperature alarm.

本船主机有机带控制报警仪表箱,仪表箱上设有电源开关、启动开关、停车按钮、主机排气温度表、油压力表、油温度表、冷却水温表、主机转速表、启动蓄电池电压表、冷却水高温及油低压报警装置;齿轮箱机旁配工作油压力表、油温度表、油低压报警、工作油低压报警及油高温报警。

One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初三个行程(即75mm 高度)—→检查出混凝土合适度及模系统工作状况—→继续浇筑混凝土500mm 高—→再升三个行程—→浇筑混凝土至模板上口—→转入正常升,每次升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初三个行程(即75mm 高度)—→检查出混凝土合适度及模系统工作状况—→继续浇筑混凝土500mm 高—→再升三个行程—→浇筑混凝土至模板上口—→转入正常升,每次升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

第2/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Means the parent directory, so this command means to execute "toolchain.sh," which is in the current directory.

代表父目录,所以这个命令就是执行当前目录下的"toolchain.sh"。

Yes,In fact,I'm on our city ream.

是的。事实上我是我们市队的。

The strong ionospheric disturbances caused by the significant magnetic storm appeared on the whole world.

用欧亚大陆地面电离层垂测站资料考察1989年3月12~16日磁暴期间的电离层暴形态及其发展变化。