英语人>网络例句>梁 相关的搜索结果
网络例句

与 梁 相关的网络例句 [注:此内容来源于网络,仅供参考]

The properties of blast loading are that it is highly impulsive, exhibiting high-pressures but lasting for a very short duration. The propagation process of shock wave produced in steel-concrete composite beams subjected to blast loading is very short. And there is only small deformation for the beam during the time of the propagation process of wave.

由于爆炸荷载作用时间短、超压峰值大等特点,当爆炸荷载作用于钢-混凝土组合上时,将在内产生冲击波,冲击波在钢-混凝土组合内的传播过程极短,并且在冲击波的传播过程中的变形很小,因此,可将冲击波在内的传播过程进行独立分析。

Research on Design Theories and Methods of Unseating Prevention Devices Based on the seismic standard of China, the design theories of unseating prevention devices were presented, according to the response spectrum of random loading and the fortify intensity at expansion joints, the design method was put forward. In the light of the use of unseating prevention devices at home and abroad, the choice and methods for installation of the devices are introduced and compared.

4连装置设计理论与方法研究考虑场地土的不同地震动参数和桥等级的不同,在论文中引入桥地震荷载重要系数,并根据冲击荷载的反应谱,提出连装置的设计地震力力和位移计算方法;参照国内外的连装置设计使用的现状,介绍了多种类型连装置的选用及安装方法;对连装置缓冲部分不同的构造进行了试验。

For the frame foundation beam with prestressed anchor cable on the linearly elastic Winkler foundation model, elastic two-constant foundation model and isotropic elastic half-space foundation model, the thesis puts up the finite element computation model which can consider the harmonious deformation of the beam and foundation and the influences between the prestressed anchor cables. The limit design idea of the cable foundation beam has been brought out, which can ensure the safety of the beam with the limit capability of the anchor cable. The computing procedure has been given and programmed.

给出了包括线弹性Winkler地基模型、双参数线弹性地基模型以及各向同性弹性半空间体地基模型上预应力锚索地有限元力学计算模型,该模型能同时考虑地与岩土体的协调变形,各锚索预应力之间的相互影响,并据此编制了计算程序;考虑到锚索地的工作特点,提出了锚索地的极限状态设计思想,在充分发挥锚索承载力的同时保证了地的安全,给出了其具体计算过程和有限元程序。

By comparing their consumptions of materials and deflexions, a suggestion that better effect can be achieved by enhacing its girder height and lessening its webs thickness for long span continuous through girder is presented.

至于连续桥,由于其边跨对中间跨的弯矩可起卸载作用,中间支点截面有负弯矩,使内所受弯矩沿长分布比较均匀,因而有利于充分利用支点附近的截面和内的预应力筋;此外,由于其桥跨在桥墩上连续,致使变形曲线匀顺,因而对高速行车有利。

Shear lag effect of box girder is important problem in bridge structure designing and construction, however, the experiment calculation method of effective distribution width of flange plate of model T is not accordance with engineering.

的剪力滞效应是桥等结构设计和分析中不可忽视的问题。然而,对箱剪力滞效应的影响因素还没有统一的定论,国内外现行设计规范对箱剪力滞的分析与计算没作具体的规定,只提出了T型翼缘有效宽度的经验取值方法,我国甚至只根据宽跨比规定了T型翼缘有效宽度。

For partially prestressed concrete I or T girder bridge,there is no sufficient stiffness owing to damage like prestress loss and cracks etc. The experiments of original and reinforced girders have been proved that the effect is remarkable to apply steel and concrete composite reinforcement method.

部分预应力混凝土I型或T型桥,由于预应力损失、裂缝损伤等造成主正常使用状态下刚度不足,采用钢-混凝土组合加固主,通过原及加固的加载试验,表明加固效果十分显著。

The continous prestressed concrete girder bridge is divided into three inters,(30m+50m+30m), with the main span of 50m, and 30m-symmetry one.

本预应力混凝土连续桥共分为三跨(30m+50m+30m)主跨50m,边跨对称30m;主采用单箱单室预应力混凝土箱,跨中高为1.5m,支座处高为2.8m,截面高度按二次抛物线形式变化;桥面净宽为7+2×1.5m;设计荷载为公路-Ⅰ级。

It was pointed out that the calculation formula for stress of laminated beam without pin joint in interlayer under bending experiment from relevant literature is wrong, and the calculation formulas for bending stress of laminated beam with or without pin joint in interlayer were rederived.

指出了有关文献推导出的上下层间无销钉连接叠层弯曲应力计算公式是错误的,重新推导出了上下层间无销钉连接与有销钉连接的叠层弯曲应力计算公式,对学生正确理解和认识叠层弯曲实验有理论指导意义。

Owing to the complex construction of continuous girder bridges,which is laboursome and time-consuming,people have been thinking about an approach to combining the advantages of the two so as to speed up the building and reduce the work procedures. Thus the "simply-supported-continuous system" is introduced.

但是由于现浇连续的施工复杂繁琐、费工费时,人们一直希望将简支的批量预制生产和连续的优越性能结合起来,用或板批量预制生产的方式来加快连续的建设速度,以省去繁琐的支模工序,由此产生了将整跨板预制、架设就位后在端部浇筑混凝土并张拉预应力使之连续的&先简支后连续&施工法,而形成的体系则被称为&先简支后连续结构体系&。

At the same time, the finite staff element method is used to analyze the influence of beam rigidity; and the two new methods proposed are used to analyze the influence of connect way between piles and beam; and the conclusion is obtained that the rigidity ratio between beam and piles being 0.48 is appropriate; the continuative increase of the rigidity ratio is not significant; the worst condition is that connecting way between piles and beam is hinged; the best condition is that connecting way between piles and beam is rigid. Whether is single-row pile or are double-row piles, when the front of single-row pile or the front of the front-row pile(in the double-row piles) needed excavation, it is supposed to that ought to be carefulness to excavate, because it is that the engineering cost increased greatly.

同时,用有限杆单元法,对双排桩的连刚度和用文中提出的方法以桩连接方式进行了试验和理论分析得出如下结论:在满足不相互影响排桩间距的情况下,桩顶连与桩的刚度比不小于0.48是合适的,此时再增加连刚度无意义;桩连接为铰结时双排桩受力变形性质最差,刚结时受力变形性质最好;不论是单排桩还是双排桩,桩前和前排桩桩前土体需要开挖时应慎重,因为这种开挖对支护结构影响很大,造价增加很多;双排桩省钱,而且抵抗变形的能力强,值得在工程中研究和广泛应用

第6/100页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
推荐网络例句

If you are unfortunate enough to the lovelorn, please tell me, I will help you out, really, please contact me!

如果你不幸失恋了,请告诉我,我会帮助你摆脱困境,真的,请联系我啦!

China's plan to cut energy intensity by 20 percent and pollutant discharges by 10 percent between 2006 and 2010 is a case in point.

中国计划在2006年到2010间降低20%的能源强度和减少10%的主要污染物排放,就是一个这样的例子。

Well, Jerry would rattle off all the details of that movie.

那么,杰瑞会急促背诵那部电影所有细节。