英语人>网络例句>完成时间 相关的搜索结果
网络例句

完成时间

与 完成时间 相关的网络例句 [注:此内容来源于网络,仅供参考]

Methods Based on the internationally accepted de finition of QOL and the clinical characteristics of uterocervical cancer as wel l as the existing QOL scales, we designed the QOL-UCC.

对 113例宫颈癌患者用QOL UCC评估生存质量,以考察量表可信性、有效性及可行性。其中被测者信度、重测信度、分半信度、克朗巴赫系数表示量表可信性,准确关联效度、结构效度、反应度研究表示量表有效性,量表完成率及完成时间表示量表可行性。

The only function of a successive adjustor is to adjust the completion time of its corresponding starting activity.

唯一的作用是连续调节,是调整工作的完成时间,其相应的启动活动。

In Stroop test,the finishing time and time for eliminating the interference of word and color was longer than normal control;false number in C and D part was more than normal control.

STROOP测试中,患儿各部分完成时间、颜色干扰时和字义干扰时较正常对照明显长,C、D部分的错误数明显多(P.05)。

For each set of worksheets there is a Standard Completion Time that is used to create a plan for each student.

每一阶段的教材都有其标准完成时间,适合为每一个孩子安排个别的学习计画。

Additional functions offer more advanced info (like the amount of TeraFlops in a work unit, estimated time of completion, etc.).

其它函数提供更高级的信息(如一个工作单元中TeraFlops的数量,完成时间的估计,等等)。

The capability of the wire saw, in combination with the expertise of the professional CSDA cutting contractor, allowed this project to be completed in time and under budget.

线材看到的能力,结合专业知识的美洲可持续切割承包为了让这项工程完成时间,根据预算。

Presenting subjects manipulated mental workload with five tests, including Raven's Standard Progressive Matrices and four subtests of Wechsler Intelligence Scale for Chinese-Children revision in 60 to 70 minutes. Reading velocity, mistake rate, index of mental capacity in Number Cancellation Test and test time, the right number of tracking lines in Visual Tracking Test were calculated and compared between the two groups.

以瑞文标准推理测试、韦氏智力量表中部分项目测试60~70min作为脑力作业负荷,负荷前、后分别进行划消试验和视觉追踪测验,统计划消试验的阅读速度、错误率、脑力工作能力指数,统计视觉追踪试验的完成时间及正确数,分析脑力作业负荷对肥胖组和对照组各指标的影响及2组间的差异,分析肥胖青少年注意能力的特点。

Adolescents of the two groups were paired according to age groups, height, schooling level and parental educational level. Average scores of all indices were calculated and compared between the two groups. Mental workload was manipulated by presenting subjects with five tests, including Raven's Standard Progressive Matrices and four subtests of Wechsler Intelligence Scale for Children-Chinese revision in 60 to 70 minutes.

以瑞文标准推理测试、韦氏智力量表中部分项目测试60~70min作为脑力作业负荷,负荷前、后分别进行划消试验和视觉追踪测验,统计划消试验的阅读速度、错误率、脑力工作能力指数(index of mental capacity,IMC),统计视觉追踪试验的完成时间及正确数,分析脑力作业负荷对肥胖青少年推理能力、智力及注意力等认知功能的影响及两组间的差异,并分析肥胖青少年注意力的特点。

This paper emphasizes on the production system of SMT, studying the single process of the parallel-machines, mix the total completed time of the short-termed production scheduling, achieving higher utilization of machines.

论文以PCBA制造业中SMT工段生产系统为主要研究对象,研究了单制程平行机台条件下,以最小化任务完成时间为目标的短期排程问题,以实现按时交货,并提高机器利用率。

Based on the existing study on evaluation criterion and traffic pattern,this paper proposes a new evaluation criterion named Flow-Completion Time Ratio,which does not rely on the network property.

本文在现有基于评价指标和流量模型所作研究的基础上,提出了一种新的评价指标——流完成时间比。该评价指标具有不依赖网络属性的优点。

第3/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

The big eared hedgehog, the little owl, the sand gecko, the three-toed jerboa, and every show needs a villain - saw-scale - the viper!

大耳刺猬,小猫头鹰,沙壁虎,三趾跳鼠,每场戏都需要反派角色:蝰蛇。

Plasmodiophora brassicae ; resting spores ; density gradient centrifugation of sucrose ; ultrasonic disruption

根肿;休眠孢子;蔗糖密度梯度离心;超声波破碎

Article 14 After the death of an employee or retiree, the balance of his individual enterprise annuities account shall be drawn out in a lump sum by the beneficiary or legal heir designated by him.

职工升学、参军、失业期间或新就业单位没有实行企业年金制度的,其企业年金个人帐户可由原管理机构继续管理。