英语人>网络例句>不稳定 相关的搜索结果
网络例句

不稳定

与 不稳定 相关的网络例句 [注:此内容来源于网络,仅供参考]

The unstable fracture of scapular neck can be divided into two main types: absolute instability and relative instability, based on the stability of the glenoid fragment in the scapular neck fracture. The former needs early operation.

根据不稳定性肩胛颈骨折中的关节盂骨折块的稳定程度,可将其分为关节盂骨折块绝对不稳定和相对不稳定两类。

Therefore, the interaction structures with distributed wall losses and attenuating severs were more stability for absolute instability and gyrotron backward oscillations.

藉由引用非线性程式进行磁旋行波放大器稳定分析,结果显示散布式损耗(distributed-losses)的设计对绝对不稳定有明显的抑制作用,而隔离管结构亦具有减短磁旋返波振荡作用长度的效用,因此我们采用兼具隔离管及散布式损耗结构的磁旋行波放大器,同时提升绝对不稳定和磁旋返波振荡的稳定性。

In chapter 3, we analyzed the motion near the collinear libration points in the model of circular restricted three body problem.

前者是稳定秤动点,对定位和轨控都比较有利,而后者是不稳定的,但可以是条件稳定的,其定位条件不同于L〓或L〓处。

The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme

主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。

The evaluated results of 152 high slopes and their retaining structures indicate that majority(85%) of them are stable and safe, and fewness(4%) of them are unstable or not safe.

分析结果表明:奉节新城高边坡及其支挡结构绝大多数(85%)处于稳定和安全状态,只有极少数(4%)处于不稳定或不安全状态,其它部分(11%)处于欠稳定或欠安全状态。

The stabilization of an unstable periodic orbit in a neighborhood of an unstable fixed point is studied.

讨论了不稳定不动点邻域的不稳定轨道的稳定问题。

Enterprise is a non-equilibrium system whose subsistence and development is always placed into a reiterative circulating process: non-stability-stability-non-stability, and the management entropy runs through it from beginning to end.

企业是一个非平衡系统,其生存和发展总是处在一个"不稳定状态——稳定状态——不稳定状态"这样反复循环的过程之中,管理熵始终贯穿企业的生存和发展的全过程。

The presterssed anchor cable frame combined with backwall, drainage is necessary due to longtime sability and permanent utilization.Firstly,according the study of engineering of geology situation of the high slope, the mechanism of deformation failure and the major hazard of the high slope of PanMei is analysed comprehensively.And the whole slope is divided into two different geology enginnering areas:Western slope(1160 section plane -1240 section plane)and Eastern slope(1240 section plane -1320 section plane). The result of 3D numerical simulation is the same as geology judgement. Later,slope cut (1:0.75) is implemented based on the engineering comparison and criterion.Meanwhile, Limit equilibrium method , Monte Carlo Probabilistic slope stability the stability , Sensitivity analysis and Finent element method of for assessing the cutted slope stability is carried out. The result indicates that Western slope is instable, Eastern slope is relatively stable.So much attention should be paid to Western slope.Different reinforcement measures in different areas are given according to its stability and meet economical request. Gravity wall is introduced in accordance with landform in order to prevent small falling at the foot of the high slope ,which will be a threat to the high slope stability. Handling measure is also applied to Eastern slope. At last,FLAC3D numerical analysis shows the feasibility and reasonableness of the handling measure of the high slope.

论文首先研究了边坡的工程地质条件,全面分析边坡的变形破坏机制和边坡的主要地质灾害,将边坡分为西段不稳定边坡区(1160剖面~1240剖面)和东段相对稳定边坡区(1240剖面~1320剖面),通过三维数值模拟再现了边坡在自重作用下的破坏机制和过程;在此基础上通过工程类比和规范要求,确定按照1:0.75进行放坡处理,并分析了放坡后边坡的稳定性状况,分别通过极限平衡法、蒙特卡洛法概率分析、参数敏感性分析和有限元稳定性计算等多种方法对边坡在各种工况下的进行稳定性研究,计算结果表明,西段边坡较之东段边坡稳定情况差,是边坡支护的关键之处,而东段边坡相对是稳定的;边坡的综合治理措施选用的是框架锚索并结合挡土墙和排水工程,治理设计根据不同区段的稳定性情况采用不同的支护结构,做到了经济合理的要求;在边坡的坡脚设置重力式挡土墙,防治边坡小规模的崩塌,会对上部的锚索支护护造成不利影响,进而影响边坡的稳定;东段边坡的填方区也给出了治理对策;最后通过三维显示拉各朗日有限差分程序(FLAC3D)模拟了高边坡放坡和支护效果,论证了治理措施的有效性和合理性。

Modeling and stability analysis problem of linear switched system are emphasized in this part and main results include:(1) Through investigation in the projection of 〓 on x, where x denotes continuous state vector, a series of sufficient conditions for stability, asymptotic stability and unstability of linear switched system's equilibrium in the sense of Lyapunov are achieved. And also, a sufficient and necessary condition for state bounded stability of linear switched system is received.(2) For a class of periodical linear switched system whose switching sets are a group of ordinal lines starting from the original point, it's proved that state bounded stability can be defined by the running characteristic in a single period (3) Based on linear switched system, the concept of linear switched system network is put forward. Linear switched system network is a complex network interconnected by many linear switched systems.

这部分着重研究线性切换系统的建模与稳定性分析问题,主要成果包括:(1)通过考察〓在x上的投影,得到线性切换系统的平衡点在Lyapunov意义下稳定、渐近稳定及不稳定的一系列充分条件,并得到了线性切换系统状态有界稳定的一个充要条件;(2)证明了对于一类切换集为从原点出发的一组射线的周期线性切换系统,其状态有界稳定可根据一个周期内的系统运行特性来判定;(3)在线性切换系统的基础上提出了线性切换系统网络的概念,线性切换系统网络是由多个线性切换系统交互作用而形成的复杂网络。

The result showed that the strong storm followed by mesoscale squall line was primary cause of strong sandstorm producing, steps and ladders short wave trough of 500 hPa was great criterion triggering system for the mesoscale squall line producing, the essential dynamic condition was provided by distortion field and the mesoscale low pressure of 700 hPa for the strong sandstorm forming and maintaining in mid-west of Hexi Corridor, the deep vertical circulation development condition was basic power that urged squall line to occur and sand dust to curl up, which was provided for the deep convection development by superimposition of lifting movement before ground cold front and ascendant current of secondary circulation in upper air jet entrance region, temperature and the barometric gradient around the cold front was enlarged by enhancement of ground thermal low and temperature diurnalvariation of afternoon, by which essential thermal energy unstable condition was provided for the gale and strong sandstorm eruption, the strong sandstorm appeared in downstream of -200 m^2s^(-2) center of vertical helicity, the vertical helicity had good instruction significance for development of squall line and landing region of sandstorm, the mesoscale squall line occurred in unstable stratification, basic condition of potential energy transforming as kinetic energy was provided by strong unstable stratification for the strong sandstorm forming and developing.

结果表明:中尺度飑线所伴随的强风暴是产生强沙尘暴的主要原因;500 hPa阶梯短波槽是中尺度飑线产生的大尺度触发系统,河西走廊中西部700 hp变形场、中尺度低压为强沙尘暴形成和维持提供了必要的动力条件;地面冷锋前上升运动与高空急流入口区次级环流的上升气流的叠加,为深对流发展提供了深厚的垂直环流发展条件,是促使飑线发生和沙尘卷起的基本动力;地面热低压的加强和午后气温的日变化加大了冷锋前后的温度和气压梯度,为大风、强沙尘暴爆发提供了必要的热力不稳定条件;强沙尘暴出现在垂直螺旋度为-200平方公尺/s^2中心的下游,垂直螺旋度对飑线的发展和沙尘暴的落区具有较好的指示意义;中尺度飑线发生在不稳定层结内,较强的不稳定层结为强沙尘暴形成、发展提供了位能转化为动能的基本条件。

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Objective To investigate the effects of interleukin-1 β converting enzyme gene on the biologic characteristics of ovarian cancer cells.

目的 探讨白细胞介素-1 β转换酶的表达,对卵巢癌细胞生物学特性的影响。

Campylobacter: This illness is the most commonly identified cause of diarrheal illness in the world.

弯曲:这种病是最常见的原因查明腹泻病,在世界上。

Gangs fill the daily lives of many of our poorest and most vulnerable citizens with a terror that the court does not give sufficient consideration, often relegating them to the status of prisoners in their own homes.

法院没有充分的考虑到黑社会的猖獗所带来的恐怖,这使得我们最穷、最可怜的市民每天生活在他们的阴影当中,成为在家的囚犯。