英语人>网络例句>water supply pipe 相关的网络例句
water supply pipe相关的网络例句

查询词典 water supply pipe

与 water supply pipe 相关的网络例句 [注:此内容来源于网络,仅供参考]

Conduit of water supply, catchment installs standard of acceptance of work: Quality of conduit, pipe fitting should accord with active standard; Valve is installed should decorous, switch Ying Ling is vivid; Press via connecting water to try, all conduit, valve, connect should not have ooze water, slack phenomenon.

给水、排水管道安装工程验收标准:管道、管件质量应符合现行标准;阀门安装应端正,开关应灵活;经通水试压,所有管道、阀门、接头应无渗水、漏水现象。

In recent years,the technique of pipe jacking construction has been developed quickly and widely applied in water supply and drainage pipe projects in China,but it is required to study and discuss the mechanism of soil disturbance and changes of soil properties during pipe jacking.

在前人的基础上,研究了顶管施工引起土体扰动的机理,提出了更加准确的土体扰动分区图。

In recent years, the technique of pipe jacking construction has been developed quickly and widely applied in water supply and drainage pipe projects in China, but it is required to study and discuss the mechanism of soil disturbance and changes of soil properties during pipe jacking.

近年来,顶管施工技术在中国得到迅速发展,并广泛应用于给排水管道工程,但顶管施工中土体的扰动机理及土体性状的变化有待深入研究与探讨。

The theories of Nash equilibrium and repeated games were used to evaluate the problems caused by the existence of more than one water supply enterprises in a city,such as reconstruction of pipe network,waste of resources and bad competition on price of city water supply.

利用纳什均衡及重复博弈的原理,讨论同一城市多家企业经营城市供水所引发的管网重复建设、资源浪费、无序价格竞争问题,研究管网正反馈因素对城市供水企业博弈结果的影响。

Is located in the Qingpu District of Shanghai Huqingping 2599, Panda high-tech industrial park, is set research and development, manufacturing, sales automatic Jiaoyun sewage pumps, Sets, air compressor, antiscale Centrifugal pumps, constant pressure fire pump, no suction pipe network frequency automatic pressurized water supply equipment, pipeline cleaning equipment, frequency conversion kits water supply equipment, control cabinet, pressure complete sets of equipment in a body specialized company.

上海熊猫机械集团有限公司坐落于上海市青浦区沪青平公路2599号熊猫高科技工业园区内,是集研究、开发、制造、销售自动搅匀排污泵、高压清洗机、空压机、防垢离心泵、恒压消防泵、变频无负压管网自动增压给水设备、管道清理设备、变频成套供水设备、控制柜、气压成套设备于一体的专业集团公司。

In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.

本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。

Including Ring high pressure air, FRP acid pH blower, electromagnetic pump, auto-powder-bubble machine, sludge dewatering machine, coaxial vortex pumps, chemical liquid filters, coaxial acid pH self-suction pump, centrifugal vertical pipe Pumps, water-dirt pumps, horizontal direct-pumped, Shen stainless steel water pump, Gear pumps, two high-speed pumps, automatic booster pumps, automatic pressure booster pump, building water supply submersible pumps , Multi-Purpose centrifugal pumps, computer frequency constant pressure pump, electronic constant pressure booster pumps, reciprocating washing machines, pressure-pumping interactive tied, tied for interactive frequency constant pressure pump, stainless steel deep-well pump, dust collection machines and dust collection Equipment, gas-casual, casual trachea, and many other environmental chemical equipment and sewage treatment works, such as the planning design and construction.

包括环形高压风机,FRP耐酸硷送风机,电磁气泵,自动型粉体泡药机,污泥脱水机,涡流式同轴抽水机,化学液体过滤器,同轴自吸式耐酸硷泵浦,立式管道离心泵,沉水式污物泵,卧式直接式泵浦,沉水不锈钢泵,齿式水泵,两段高速泵,自动增压泵,压差式自动增压泵,大楼给水潜水泵,多段式离心水泵,电脑变频恒压泵,电子恒压增压泵,往复式清洗机,压差式交互并列泵浦,变频恒压交互并列泵浦,不锈钢深井泵,集尘机及集尘设备,散气盘,散气管等各式环保化工设备及污水处理工程的规划设计施工等。

Dahuofang water diversion project is a typical case of this kind of engineering. This project is divided into two parts from Anshan pressure station: the up-gravity-force water diversion with double-pipe, and the down-pressure-flow part, which provides water for seven water supply station of six cities, lots of brunches, and full of ups and downs, covering many kinds of boundary conditions of modern engineering.

大伙房输水工程就是其中一个较为典型的工程实例,该工程以鞍山加压站为分界点将整个系统分为两部分,鞍山上游为重力流输水并且有一段为双管运行,鞍山下游为压力流,一共给6个城市7个净水厂供水,多分支,多起伏,几乎包含了当今输水工程中存在的各类边界情况。

PE-X pipe and aluminum plastic compound pipe in water-supply engineering are introduced.

介绍了PP R管、PE X管和铝塑复合管在给水工程中应用的优劣。

Note: The potable water expansion tank shall be installed in the cold water service pipe line on the supply side of the water heater.

注:饮用水膨胀罐应该安装在热水器的供水端的冷水维修管道上。

第3/7页 首页 < 1 2 3 4 5 6 7 > 尾页
推荐网络例句

Cynanchum Lingtai apricot production in the average weight 65 grams, the brightly-colored fruit, juicy rich, sweet-sour taste, sweet from the nucleolus, when the late Qing Dynasty famous Shaanxi, Gansu provinces, the Qing imperial court Tongzhi tribute for years.

灵台生产的牛心杏平均单果重65克,果实色泽鲜艳,汁多味浓,甜酸适口,离核仁甜,清末时就驰名陕、甘两省,清同治年间曾为朝廷贡品。

Chenopodium album,Solanum nigrum, and Amaranthus retroflexus were very susceptible to the herbicides. Polygonum persicaria and Abutilon theophrasti were relatively less susceptible to the herbicides, and Lycopersicon esculentum was not susceptible to it. The relationship between reduction rates of weed biomass and PPM values of weed leaves 2,4, and 6 days after treatment was established.

供试的6种杂草对该混剂的敏感性存在显著差异:红心藜Chenopodium album、龙葵Solanum nigrum和反枝苋Amaranthus retroflexus对该混剂最敏感,ED90值分别为47.65、71.67和29.17g/hm2;春蓼Polygonum persicaria和苘麻Abutilon theophrasti敏感,ED90值分别为96.91、114.20g/hm2;而番茄不敏感。

However, I have an idea.

不过,我有个主意。