英语人>网络例句>supporting construction 相关的网络例句
supporting construction相关的网络例句

查询词典 supporting construction

与 supporting construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

According to some problem in the construction control of the Second Bridge of Danjiangkou, this paper outspreads the study pertinently after analyzing and summarying the construction control technology and understanding the development trend of construction control at home and abroad.

本文在分析总结国内外施工控制技术并了解其发展趋势后,就丹江口二桥的实际施工控制过程中出现的一些问题,有针对性地展开了课题的研究。

The cracking furnace piling of ethene facilities has been completed. 0.3 million/year LLDPE and 0.3 million/year HDPE piling, stake prefabricating, the construction within the plant and the preparation ofthe road construction within the plant and the preparation of drain and pipes are under construction.

乙烯装置的裂解炉打桩已完成。30万吨/年LLDPE装置和30万吨/年HDPE装置的打桩和桩预制以及厂区内道路的施工及雨排、地管施工的准备工作正在加紧进行。

Section Four: Countermeasure and suggestion for solving. The author attempts to propose her own view and train of thoughts, in the field of teachers training offering, propagandizes to the new curriculum, and construction for the new curriculum resources construction, the construction and improvement of policy and the necessary system.

第四部分&解决问题的对策与建议&:作者尝试从教师培训,加大对新课程宣传,加快新课程资源建设,完善政策与配套制度的建设等几方面提出自己的看法和思路。

The total quantity of our countryside collective construction land has already surpassed 270,000,000 acres, which is quintupling compared with the cities state-owned construction land. Whether the collective construction land can be collocated effectively through the market not only relates to vital interest of peasants, but also relates to the stability and development of three agricultural questions.

我国农村集体建设用地总量已经超过2.7亿亩,是城镇国有建设用地的5倍,集体建设用地能否以市场方式有效合理的配置不仅关系到农民的切身利益,也关系到三农问题的稳定与发展。

Based on reappraising, key environmental factors like Disposal of Construction Refuse on Construction Site of a construction project are additionally provided.

2007年全公司识别、更新的环境因素共计688个,经重新评价,重要环境因素新增&建设项目建筑施工现场建筑垃圾处置&,确定2007年公司级重要环境因素为22项。

Dongguan Branch have steel construction project national first class qualification of responsibility contracts on specialities, the construction work of the house constructs and always contracts one grade , smelts the project to always contract one grade, adopt " H section steel steel construction energy-conserving residential housing system " technology belong to at home leading technology, have good market prospects.

山东莱钢建设有限公司东莞分公司拥有钢结构工程专业承包国家一级资质、房屋建筑工程施工总承包一级、冶炼工程总承包一级,采用&H型钢钢结构节能住宅建筑体系&技术属国内领先技术,具有良好的市场前景。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Combined with the construction of Shuangtan Bridge Wu-Feng freeway,it introduces the successful finish the suspension construction technique of large-tonnage arch ring box by using the cable suspension steel reinforced concrete arch ring,and puts forward the safety program that should attention in construction.

结合巫奉高速公路双潭大桥施工,详细地介绍了采用缆索吊装钢筋混凝土主拱圈,成功地完成了大吨位主拱圈的吊装施工技术,并提出了施工中应注意的安全事项。

The construction of China Blasting Network and industry information-based platform has laid a basis for "Digital Blasting". The paper also described some efforts made by the blasting industry in the construction and application of information technology in recent years, including the construction and application of China Blasting Network, industry application system software, the industry database clusters, the website clusters, digital archives, vibration measurement grid, digital products, as well as the current development goals of "Digital Blasting".

建设中国爆破网,搭建行业信息化平台,是&数字爆破&的基础工作,本文阐述了爆破行业近几年在信息化建设与应用方面所做的一些工作,内容包括:中爆专网、行业应用系统软件、行业数据库集群、网站集群、数字档案管、测振网格、数字化产品等的建设、研发和应用,同时也提出了当前&数字爆破&的发展目标。

第45/50页 首页 < ... 41 42 43 44 45 46 47 48 49 ... > 尾页
相关中文对照歌词
Under Construction
Ice Cream
Road Of The Righteous
Starring Role
Change In The Making
Wall Around My Heart
9-5ers Anthem
Overload
Outro
Behind The Mask
推荐网络例句

Connectors are lines that can be anchored to particular places, called glue points , on the graphic object.

连接符,可固定在图形对象的特定的地方的线条。

Another way of putting it, too many agents have a say in each other's work, and bureaucratic rigor mortis sets in.

另一种表达是,太多的作用物在彼此的工作里都有话语权,官僚的僵尸开始抬头。

As someone aptly said,'there is no business without competition.

有人说恰如其分,没有业务竞争。