查询词典 span bridge
- 与 span bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In company with nonstop rushing of the long-span tunnel construction, a matterstation encounter more and more. For instance, the demand of the present design and construction code is already insatiability with the need of long-span tunnel engineering design and construction. And both domestic and foreign concerned research output is not too much to refer. So the engineering design and construction on long-span tunnel has definite blindness of the approve use for reference.
随着大跨度隧道建设的不断涌现,所遇到的问题也越来越多,比如现行的设计与施工规范已经不能满足大跨度隧道设计与施工的需要了,但国内外有关的研究成果并不多,可借鉴的设计与施工经验较少,大跨度隧道的设计与施工带有一定的盲目性。
-
For beams employed in any span between supports there shall be no splice in the middle one-fourth of the span nor in the one-eighth of the span nearest any support, nor closer than 1200 mm to the edge of any support/joint, as applicable.
在任何支撑点的跨距内使用的梁,在跨距中间的四分之一位置上,不得有拼接口,在靠近支撑的八分之一跨距位置上,不得有拼接口。在应用上,接口与支撑/接头边缘的距离不得小于
-
The internal forces of the main arch springers are calculated in different rise-span ratios of top and bottom arch ribs. The internal forces of arch ribs and deformations of main spans are calculated in 1/5, 1/4 rise-span ratios of top and bottom stacked arch ribs and in 1/5 rise-span ratio of dumb-bell arch ribs.
给出上、下拱肋为不同矢跨比情况下的主拱拱脚截面内力,当叠合拱桥的上、下拱肋矢跨比分别采用1/5、1/4与矢跨比为1/5的哑铃拱拱肋的内力和主梁及拱顶变形计算结果。
-
The text obtains some data that caving span of immediate roof is 30m, caving span of main roof at first weighting is 42m and caving span of main roof at periodic weighting is 14m. Mining influence range is determined about 40m through numerical modeling, namely about three advance pillars were in the range of mining influence.
利用数值模拟得出煤柱采场直接顶的垮落步距为30m,老顶的初次来压步距为42m,老顶的周期来压步距为14m;通过模拟超前支承压力,确定了采动影响范围约为40m,即采场超前的三个煤柱都在影响之内。
-
In the pump body installed a stator swing span and a swing span rotation shaft, the swing roller bearing on the stator swing span connects with an end of the stator mount, the other end of the stator mount connects with the stator; on the plunger connecting rod sliding boot installed a static pressure balance chamber, the holding rings are arranged on the two sides of the plunger connecting rod sliding boot which has a fit clearance with the holding rings; the rotor rotates the stator simultaneously via the plunger piston; the needle roller bearings are arranged on the two inner circles and fit with the port axle.
在泵体内安置有定子摆架和摆架转轴,位于定子摆架上的摆架滚子轴承与定子托架的一端配合联接,定子托架的另一端与定子相连;柱塞连杆滑靴上设有静压平衡室,柱塞连杆滑靴两侧设有保持环,柱塞连杆滑靴与保持环有一定的配合间隙;转子通过柱塞带动定子同步旋转;在转子内圆两端设有滚针轴承,滚针轴承与配流轴配合。
-
Span/pp class="MsoNormal"strongspan style="font-size: 10pt; font-family:"Arial","sans-serif";"The Call of Duty Experience:/span/strongspan style="font-size: 10pt; font-family:"Arial","sans-serif";" emCall of Duty: World at War/em utilizes cutting-edge technology including highly-detailed character models, self-shadowing, environmental lighting and amazing special effects to deliver jaw-dropping visuals.span /spanDepth of field, rim-lighting and texture-streaming technology bring the adrenaline-pumping combat to life, while physics-enabled battlefields and fire that spreads through environments realistically immerses players into the harrowing and dynamic combat.
跨度/页级=&MsoNormal& strongspan风格=&字体大小:10pt;字体家庭:&宋体&,&无衬线&,&的工作经验电话:/跨度/ strongspan风格=&字体大小:10pt;字体家庭:&宋体&,&无衬线&,&使命的emCall:战争世界/时间利用尖端技术,包括高,细致的角色模型,自阴影,环境照明和惊人的特殊效果,提供令人惊叹的visuals.span / spanDepth外地,环照明和纹理,流媒体技术使肾上腺素抽水作战的生命,而物理功能的战场环境,消防,通过传播,切实沉浸到悲惨和动态combat。球员/跨度/页
-
With the appearance of a free span pipeline, its loading types and stress state will be changed. Especially when ocean currents pass through it, a periodical vortex shedding is often produced and induces vibration of the free span pipeline. This type of vibration contributes a lot to the fatigue failure of a free span pipeline.
管跨段的出现改变了海底管线所承受的载荷形式和应力状态,尤其是在海流作用下流经管跨时,常伴随着周期性的涡旋发放,引发管跨段的周期性振动,成为管跨段发生疲劳失效的主要因素之一。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
When making design with bridge configuration, bridge deck overlay which was only treated as the appendant of bridge, currently not make special calculate and analyze about it, at the same time, current codes also just give directed account for method、material and thickness of deck pavements, there havent any design theory and index to dependent, so it is necessary to do some systemic study about concrete bridge deck overlay and make certain about the stress and distortion characteristic of the deck pavements.
桥面铺装作为特殊的路面结构,它起着保护桥梁和承担路面功能的作用。但是目前,在进行桥梁结构设计时,桥面铺装层只是作为桥梁工程的附属结构,一般不作专门的计算分析,现行规范也只是对桥面铺装的做法、材料、厚度做了指导性的说明,至今没有可以依据的设计理论和指标,因此有必要对桥面铺装展开系统的研究,明确铺装层结构的受力和变形特点。
- 相关中文对照歌词
- London Bridge Is Falling Down
- Couch Potato
- Under The Bridge
- Take It To The Bridge
- My Arms Are The Brooklyn Bridge
- Your Only Friends Are Make Believe
- Kief Catcher
- Think Like A Man
- Bridge To Love
- Bridge Burn
- 推荐网络例句
-
The system can be widely used in belt weighing and batching process control,etc.
介绍了基于智能模糊控制的嵌入式配料系统的设计方法,对模糊PID控制过程和系统调零作了重点的讨论,同时给出了PID控制的程序流程图和系统定长调零子程序。
-
"I dunno," she answered,"but if you show me aroun', I'll recognize it from the lighthouse just outside the porthole."
"我不知道,"她回答说,"如果你能带我转转,我能认出来的,因为灯塔就在舷窗外。"
-
That experience was of great benefit to me.
那次经历对我很有益处。