英语人>网络例句>slide 相关的网络例句
slide相关的网络例句

查询词典 slide

与 slide 相关的网络例句 [注:此内容来源于网络,仅供参考]

The slide arrangement mirrored that of the 21/2 lathe with a single tool-slide that socketed into and swivelled about the front of the saddle.

幻灯片的安排反映,在21 /2 车床用一个工具,幻灯片和swivelled嵌成左右的前端,鞍座。

When the shockwave energy weakened, mountain collapse often occurs in the ringed mountain, particularly in the previously steeper inside, while plagioclase slope slide (primary meteorite-stricken slope slide) occurs in the outside mountain, and the mountain structure is constantly adjusted in aftershocks to achieve the gravity balance; during the long geological ages after the formation of meteorite crater, under the action of erosive transit and dryness and humidity of hydrosphere and air current, volcano and earthquake activities, etc., the physiognomy gradually reverts to the original state.

在冲击波能量减弱时,环形山原来较陡峭的内侧多发生山体崩塌,外侧山体发生斜岩滑坡,在余震中山体构造不断调整以达到重力平衡;在漫长的地质年代里,陨击坑成型以后,在水圈、大气环流的侵蚀搬运、寒暑燥湿、火山和地震等因素作用下地貌逐步趋于还原。

At the same time, the design and calculation methods of several major engineering measures such as common anti-slide pile, anti-slide pile with prestressed anchor cable and foundation beam with prestressed anchor cable, are discussed.

随着国民经济的快速发展和国家西部大开发战略的实施,将有越来越多的铁路干线在山区投入建设,斜坡隧道的数量也将不断增加,可以预见,斜坡地段因滑坡引起的隧道变形这类复杂的岩土工程问题将不可避免地大量出现。

At the same time, the design and calculation methods of several major engineering measures such as common anti-slide pile, anti-slide pile with prestressed anchor cable and foundation beam with prestressed anchor cable, are discussed.

同时,对普通抗滑桩、预应力锚索抗滑桩和预应力锚索地梁等几种主要工程措施的设计计算方法进行了讨论,方便工程部门在设计时参考。

The machine component claimed in claim 1, in which the second mounting means connects one part of said assembly to the slide plate through a bracket affixed to the slide plate, the said one part being in turn attached to said bracket.

机器组件索赔要求1,其中第二次的安装方法连接其中的一部分说,大会通过贴在滑板括号到幻灯片板,其中一部分是说反过来说,重视支架。

The machine component claimed in claim 1, in which the second mounting means comprises a toggle bracket fixed with respect to the base plate, a toggle lever located above the slide plate and pivotally mounted to said toggle bracket about afirst axis, a clevis bracket affixed to the slide plate, a toggle link pivotally mounted at one end to said clevis bracket and pivotally mounted at the other end to said toggle lever at a second axis spaced from said first axis, one part of said assemblybeing pivotally mounted to said toggle lever at a third axis spaced from said first axis, the second and third axes being spaced different distances from said first axis.

机器组件索赔要求1,其中第二次安装的手段包括一个切换支架方面的底板,上面一个切换杠杆的滑板位于pivotally说,安装在固定支架切换对afirst轴,一羊角支架贴幻灯片板,一个切换链接pivotally在一端的安装支架,并说,羊角pivotally在另一端安装说,从第二个间隔轴切换杆称,第一轴,其中的一部分说assemblybeing pivotally安装在切换上说杠杆间隔从第三轴轴表示,第一,第二和第三轴间距是从不同的距离表示,第一轴。

The machine component claimed in claim 1, in which the second mounting means comprises a toggle bracket fixed with respect to the base plate, a toggle lever located above the slide plate and pivotally mounted to said toggle bracket about afirst axis, the toggle bracket having a plurality of attachment openings at different spacings from said first axis, a clevis bracket affixed to the slide plate, a toggle link pivotally mounted at one end to said clevis bracket and pivotally mounted atthe other end to said toggle bracket at one of said plurality of openings, constituting a second axis spaced from said first axis, one part of said assembly being pivotally mounted to said toggle bracket at a third axis spaced from said first axis,whereby the spacing of the second axis from the first axis can be adjusted by selecting a different opening, and whereby the second and third axes are spaced at different distances from said first axis.

机器组件索赔要求1,其中第二次安装的手段包括一个切换支架方面的底板,上面一个切换杠杆的滑板位于pivotally安装固定谈及afirst轴切换括号,括号有一个切换扣押开口多元化,从不同间距表示,第一轴,一个羊角支架贴在滑板,一个切换链接pivotally在一端说,羊角安装支架和pivotally安装atthe的另一端说,在一个多元切换支架开口说,构成间隔从第二轴表示,第一轴,其中的一部分被pivotally说集会上说安装在从间隔三分之一轴切换括号表示,第一轴,即从第一轴,第二轴间距可以通过选择一调整不同的开放,即第二和第三轴是从不同的距离间隔表示,第一轴。

Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .

本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。

The stick and brush are then moved across a glass slide causing the cells to become attached to the slide.

然后刷子再把细胞放置在幻灯片。

The multi- connecting rods press is one kind new press which taking the multi- linkmotion gear as the operating mechanism.The slide has the obviously comes back promptly kinematics the characteristic.In work sector,The slide"s speed is steady, and is lower than the crank press greatly, this is advantageous to enhance quality of the big distorts stretch. At the same time it reduces the impact between the molds and lengthen the mold"s service life.

多连杆压力机是一种以多连杆机构为工作机构的新型压力机,滑块具有明显的急回运动特性,在工作区间,滑块速度平稳,并且大大低于曲柄压力机,这有利于提高变形较大的拉伸件的质量,同时减少模具间的冲击,延长模具使用寿命。

第9/100页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
The Slide Song
Slide
Slide
Slide Away
Slide Over
The Further I Slide
The Slide
Slide
Full Lock Power Slide
Slide N Slide Out
推荐网络例句

It goes back to what I told you...

现在回到我告诉过你的。。。

With a supporter in Mr Charest and an admirer in Mr Dumont, Mr Harper may be encouraged to call an election himself.

由于在沙雷那边有个支持者,杜蒙那边有个崇拜者,鼓励哈珀为自己举行一次选举。

Come to a "Chronicle" in.

来个"纪事"的。