英语人>网络例句>process cost 相关的网络例句
process cost相关的网络例句

查询词典 process cost

与 process cost 相关的网络例句 [注:此内容来源于网络,仅供参考]

The thesis studies the difference between GWSs composition and traditional workflow applications, proposes the implement mechanism and technical architecture of GWSs composition and defines the reference model of GWSs composition platform, which provide holistic framework and top-level guidance for studying dynamic GWSs composition technology, designing GWSs composition platform, and implementing representative composite service applications.2、Theories and methods of composite process modeling and process analysis. This thesis proposes a meta-model of Geo-spatial Web services composition process defining from two aspects, i.e. process and resource. According to the process definition meta-model, we propose a new Geo-spatial Web services composition Process/Resource model based on extended WF-net, which effectively resolves the problems on uncertain activity option and dynamic variation of service in composite process model. A notion with regard to soundness of process model is proposed from three aspects, i.e. the structural correctness of process model, validity of data link and validity of resource. The notion of soundness definitely gives a dividing line on correctness of composite GWS process. This thesis analyzes sufficient and essential terms of soundness, and studies compositional property of WSCP/R-net models which provides an effective method to construct a soundness WSCP/R-net model. According to WSCP/R-net, the thesis proposes composition algebra and studies the properties of it. Based on the composition algebra, 6 kinds of composite process reduction rules are induced to optimize the process.3、Geo-spatial Web service QoS model and its application architecture. This thesis proposes an extendable GWS QoS model from three aspects, i.e. Geo-spatial Web Service itself, networking conditions and service consumer which can be used to distinguish GWSs with overlapping or identical functionality. We work over the QoS evaluation methods of composite GWS process which can be used to guide the execution, monitor and service selection of composition process. Aming at some disadvantages in traditional Web service discovery model for its lacking of QoS supporting, this thesis proposes a new service discovery model SDMQ supporting QoS constraints.4、Technologies of composite service executing. SSPL, a new composite service process language, is defined to overcome the disadvantages of existing composite services process languages which can not adapt to the dynamic variation of Geo-spatial Web Services. An algorithm is described to translate WSCP/R-net model into SSPL. The thesis studies the model of dynamic services selection with QoS global optimization, presenting an algorithm GODSS to resolve dynamic services selection with QoS global optimization in GWSs Composition.5、Design and implement experimental system and representative applications. According to the research findings presented above, we design and implement an experimental system and construct two representative applications to show that our achievements are effective and practical.

针对当前空间信息服务聚合研究中存在的若干不足,本文重点在基于工作流的空间信息服务聚合框架、空间信息服务聚合流程建模和分析技术、空间信息服务QoS模型及应用体系以及空间信息服务聚合流程执行等几个方面进行深入研究,主要工作和创新点包括:1、基于工作流的空间信息服务动态聚合框架:研究了空间信息服务动态聚合和传统工作流应用的不同,在此基础上提出了基于工作流技术的空间信息服务动态聚合实现机制、技术体系和参考模型,为研究空间信息服务聚合的关键技术、开发服务聚合支撑平台以及在此基础上构造特定的空间信息服务聚合应用提供了总体框架和顶层指导。2、空间信息服务聚合流程建模和分析技术:首先基于动态服务聚合流程建模的需求和空间信息服务动态变化的应用实际,从服务聚合的过程维和资源维出发定义了服务聚合流程定义元模型;与之相对应,对基本的WF-net进行扩展,提出服务聚合流程/资源网作为空间信息服务聚合流程的形式化描述模型,有效解决了现有的基于基本Petri网和工作流网的服务聚合建模方法所不能解决的不确定路径选择和服务的动态变化性问题;从流程结构正确性、数据依赖有效性和资源实现有效性三个方面提出了WSCP/R-net健壮性的概念,明确界定了聚合流程正确性的标准,并对WSCP/R-net模型的健壮性分析方法和WSCP/R-net模型的组合特性进行了研究;提出了空间信息服务聚合代数算子并对其性质进行了研究,在此基础上提出了6种聚合流程约简规则,从而可达到优化聚合流程、提高聚合流程执行效率的目的。3、空间信息服务QoS模型和应用体系:从服务本身、网络环境和服务消费者三个层次出发,提出了一个可扩展的空间信息服务QoS模型GSQM,实现了对空间信息服务的度量和评价,并对GSQM不同质量要素信息的客观、公正采集方法进行了研究;研究了空间信息服务聚合流程QoS评价方法,有效支持了空间信息服务聚合流程的执行、监控以及服务选择等操作;针对目前的服务发现模型仅支持服务功能性描述、不能有效满足空间信息服务应用需求的现状,提出了一种新的支持QoS约束的服务发现模型SDMQ,并对模型的实现框架进行了研究。4、空间信息服务聚合流程执行技术:针对现有的服务聚合流程描述语言不能有效满足空间信息服务动态聚合流程描述的特点,基于BPEL4WS提出了一种新的空间信息服务聚合流程描述语言SSPL;研究了满足健壮性要求的WSCP/R-net模型向SSPL的转换算法,在此基础上可以满足用户无显式编码来实现空间信息服务聚合应用的目的;研究了服务动态选择QoS全局优化模型,并在此基础上提出了一种解决服务动态选择QoS全局优化问题的实现算法GODSS.5、基于论文研究成果,设计实现了"空间信息服务聚合实验系统",并构建了"矿产资源评价"和"城市消防应急响应"两个典型应用案例,对论文所述模型、方法的可行性和有效性进行了验证。

Main points of the thesis are as follows:(1) The main function models and information relations between these models in the CAPP system in the integrated CAD/CAM project are explained, a new process plan design method is mentioned based on analyses of process plan design. This method is based on the process plan prototype, and develops the prototype little by little until the perfect process plan is completed, the prospect of this method is discussed;(2) The feature abstracting rules and methods are studied, a feature coding system is developed based on GT, all the defined feature models are described by the mathematical methods;(3) The integrated method of CAD/CAPP based on features is mentioned, this method defines a feature exchanging model, and develops an interface software to exchange design data into technology data base, this technology data base includes the design and technology information of the parts;(4) The process plan reasoning method based on features is created, this method uses Mycin algorithm to solve the reasoning of the feature process plan. A process plan making system is developed. In this system part process plan is made by the semi-intelligent method, this method uses the feature reasoning, feature process chain searching and man-computer talking together;(5) The main structure of the HOPE system is introduced, a shaft drawing and its process plan made by this system are shown, the data process problem in process drawing making is also discussed;(6) A new method of describing process rule is introduced, this method uses IfThen rules and neural nets weight values together to describe process rules, the BP algorithm is adopted in this method;(7) The optimal machining sequence problem of the process steps on the same fixturing is discussed, optimal algorithms SA is applied to solve this problem, the result shows that this method is more efficient than the traditional method;(8) All jobs in the thesis are summarized. In order to carry out the research in the future, some rational proposals are given.

全文论述的内容主要有下列几个方面:(1)较为系统地阐述了CAD/CAM一体化工程项目中CAPP系统的主要功能模块及其信息流程,在分析工艺设计过程的基础上,提出了基于特征原型的渐进式工艺设计方法,并探讨了该方法的应用前景;(2)研究了零件特征提取的原则和方法,在成组技术的基础上,开发了一套基于特征的分类编码系统,并在提取零件特征的基础上,定义了零件特征的数据模型,开发了基于轴类零件特征的参数化设计系统;(3)研究了基于特征的CAD/CAPP集成的方法,通过定义零件特征数据模型的存储结构,开发了将设计数据转换到工艺数据库中的接口程序,为后续的CAPP系统提供必要的零件形状和工艺信息;(4)研究了基于特征的工艺推理方法,将Mycin算法应用到工艺决策中,开发了基于特征的工艺推理及工艺方案生成系统,在系统中综合运用特征推理、特征加工工艺链查询及人机对话相结合的半智能化方法确定零件加工工艺;(5)介绍了整个HOPE系统的总体结构,通过运行HOPE系统绘出了一轴类零件的零件图,并生成了该零件的加工工艺方案,初步探讨了基于特征的工序图生成技术中数据处理问题;(6)研究了工艺设计过程中知识如何有效表示的问题,提出了将显式的IF-THEN规则表示与隐式神经网络权值表示相结合的工艺知识表示方法,并利用BP算法进行了工艺知识表示的初步研究;(7)研究了工艺设计过程中同一安装下工步优化排序问题,利用神经网络中基于模拟退火的理论来解决该工步优化排序问题,实践证明该方法较传统的算法具有更高的效率;(8)总结了本文所进行的研究工作,为今后进一步开展工作提出了较为合理的建议。

A univariate ANOVA is executed to analyze the influencing factors of the production cost by dividing it into direct material, direct labor cost, indirect cost and total cost separately. It is found that the variables of farm scale and crop type show significant impacts in the direct labor cost and total production cost. The one-crop farming variable makes significant difference in the total production cost; whereas different planting ways differentiates the indirect cost. In addition, years of farming, farmer's age, and full-time status all make no significant difference in all aspects of production cost.

此外,将农场生产成本分为直接材料、直接人工、间接成本、总生产成本四面向进行多因子变异数分析,结果发现耕作面积、作物类型变项仅在有机农场的直接人工和总生产成本中有显著差异;有机农场是否为单一经营在总生产成本上有显著差异;不同栽培方式的有机农场仅在间接成本的高低上有显著差异;此外,而耕作年数变项因本研究有机农场耕作年数较高之样本特性影响,导致该变项对生产成本并无显著的差异;年龄、专兼业经营等变项在生产成本上高低并无显著差异。

The chapter four to chapter eight analyze the railway engineering cost making standard from the sides respectively including railway engineering quotation, railway quotation direct cost, site administration cost, construction measurement cost, indirect cost and profit, analyze the key factor which influencing cost, confirm the scientificity and rationality of the current cost making standard basing on field measuring data, bring forward the advise of the ways and method of reducing invest and cost, and bring forward the opinion and advice for improve and perfect the current railway cost making standard.

第4~8章分别从铁路工程定额、铁路定额直接费、现场管理费、施工措施费、间接费和利润等方面对铁路工程造价计价标准进行分析,分析影响费用的关键因素,依靠实测数据检验现行各项计价标准的科学性与合理性,提出降低投入、减少成本支出的途径和方法的建议,并对现行铁路计价标准提出改进和完善的意见和建议。

The objectives of this paper were to investigate the simulation and design of continuous multiple-station rolling forming process for a U-Section Steel Bar by CAE software-DEFORMTM Due to the limitation of elements number using a short strip 120mm went through all the stations to simulate the real continuous rolling forming on factory The roller gap was fixed as 0 30mm roll speed was 20 rad/sec and progressive angles were all equal for each rolling process which were the formed angle divided by by the number of station Three rolling processes were selected with 6 9 and 12 stations respectively During simulation processes two cases occurred Case A the strip was through a single station Case B the strip across two stations Because the strip laterals side was stretched and twisted during the process The model of case B closer to the practical process than case A and the calculated stress and strain on the tip of U section for case A were lower than these for case B by up to 15% From the result of case B for each process the stress for 12-station process was smallest 9-station process second and 6-station process next Because less-station can save larger cost and forming time but the bigger stress and strain for 6-station caused wrinkles on lateral sides not found on 9-station and 12-station Therefore 9-station process was a more suitable design than 12-station process smaller stretched and twisted and stress The progressive angles for 12-station was 7 5?

本文主要是以DEFORMTM有限元素软体模拟U型钢片连续道次成型与单一道次成型以确认单一道次模拟的是否可取代连续道次模拟之研究。因DEFORMTM 软体对於网格元素上的限制故使用较短素材120mm通过所有的成型站以模拟工厂实际连续成形方法。辊轮间隙固定为0 3mm;辊轮转速为20 rad/sec;弯曲角度的方法为将成型角度平均除以成型站数。有三种辊轮成型方式被选择分别为6站,9站,与12站。在模拟的过程中有两种现象会产生 Case A,素材通过单一成型站。Case B,素材会通过两个成型站。因为在模拟过程中素材的两端会有拉应力与扭力。Case B的模拟比Case A像实际的制程,并计算应力与应变在U型断面的Tip部中可发现Case A比Case B低约15%。从Case B的每站的结果可以得知,12站的成型应力最小,9站次之,6站最后。

In view of the not high whole level of cost control of our construction enterprise, lacks the feasibility strong cost control method. The construction enterprise cost has one -sidedness to control the idea, workers cost consciousness of enterprise is not strong, construct enterprise cost is remain current situation during the course of constructing, etc. The thesis submits the focal point of every stages of cost controlling and the method and theory of cost control.

针对我国建筑业企业成本控制水平整体不高,缺乏可操作性强的成本控制方法,建筑业企业成本控制理念存在片面性,建筑业企业职工成本意识不强,施工企业成本控制只停留在施工阶段等现状,本论文拟从投标到竣工验收的全过程为研究对象,提出了各阶段成本控制工作的重点和成本控制方法。

The process features and shape features of the electronic part are classified and defined, and then the feature model library is built, which enables rapid input of the part information. The rules and methods of stamping process design are summarized to build the stamping process library, so that the stamping process can be designed rapidly and intelligently. Furtherly, the process design rules and methods in process station layout of multi-station progressive die as well as the methods of decompounding and compounding process and the expression method of the process station layout are concluded and summarized, and then the rule library and case library of process station layout are built. Designing the process station layout rapidly is carried out based on rules and cases. At last the rapid design function of process station layout is validated through simulating the rapid designing layout system of multi-station progressive die on Pro/E 3D platform.

主要研究成果有:对电子产品冲压件的工艺特征与形状特征进行了分类和定义,建立了特征模型库,实现了冲压件信息的快速输入;归纳了冲压工艺设计规则和方法,建立了冲压工艺知识库,实现了冲压工艺快速与智能化设计;归纳总结了多工位级进模工步排样中的工序设计原则和方法,工序分解与工序组合方法,工步排样知识的表示方法,建立了工步排样规则库和实例库,利用基于规则和实例的推理方法,实现了工步排样的快速设计;在Pro/E三维软件平台上开发了电子产品多工位级进模工步排样快速设计系统,系统通过实例验证了工步排样的快速设计功能。

The idea of zero cost cycle is devised to solve the critical problem of minimum cost flow. Additional related results obtained include: the theory of bottleneck analysis based on minimum cost augmentation chain and zero cost cycle; the proof of the existence condition and the coherence condition of bottlenecks based on network output; methods to solve various kinds of process bottlenecks; the development of the algorithms of optimization and bottleneck analysis of MCPN (i. e, MCPN-CBA1 and MCPN-CBA2); a series of scheduling strategies and algorithms based on cost analysis, profit evaluation and bottlenecks of process flow line.

四。提出了基于工艺流程成本分析、利润评价的两类生产网络模式:最小成本生产网络和最大利润生产网络;首次提出零成本圈的概念,从而提出并研究了最小费用流的临界问题;创建了基于最小成本增广链、零成本圈的瓶颈分析理论,证明了过程瓶颈的存在性条件以及基于网络加工量的瓶颈一致性条件;给出了求解各类瓶颈的关键技术,研究开发了MCPN的瓶颈分析算法MCPN-CBA1、MCPN-CBA2;提出了一系列基于工艺流程成本分析、利润评价及过程瓶颈的调度策略和调度算法。

Acceptance Criteria Activity Duration Estimation; Activity Definition; Activity Sequencing; Addenda Approved budget Arbitration Award of Contract ; Award Criteria Audits Balanced Matrix; Baseline Bill of Quantities Brainstorming Characteristic Checklists civil engineering civil building Claims Clarify Closing Communication Management Communications Planning Communications Skills Communication channels or paths Completion Computer-based Concrete structure Conditions of Contract Conflict Management Contract Management Contract administration Change Control Contract Closure Contract file Contract agreement; Contractual obligations Contractor Contractor's Representative Construction Management Planning Contract Price Control Chart Cost Estimating; Cost of Quality Cost Control Cost Budgeting Cost Management Co-operation Failure costs Critical Path Feedback Fixed-price Fossils Force Majeure Daywork Functional Organization Decision; Fundamental Tenets Decision Tree Defects Liability Definitions Delphi technique General Rules Deliverables General Provisions Deviation; Generation Direct Costs Discounted cash flow; Dissemination Highway engineering; Discharge Human Resource Management; Disputes Human Resource Planning Drawings Hydraulic engineering; Hydroelectric engineering; Employer's Taking Over Identity Certificate Evaluation of Tenders Initiating Process Group; Executing Process Group Instructions to Tenderers Industrial building Investment payback analysis; Ineffective Individual and team performance Information Distribution Negotiation Indirect Costs Nominated Subcontractors Incentive bonus Information Technology Interpretation; Insurance Observation Inspections Off-site Online On-the-job training Opening of Tender

验收标准活动时间的估计;活动的定义;活动序列分析;增编核定预算仲裁授予合同;授标标准审计平衡矩阵;基线工程量清单集思广益特性清单土木工程民用建筑索赔澄清闭幕通信管理通信规划沟通技巧沟通渠道或路径完成以计算机为基础的混凝土结构合同条件冲突管理合同管理合同管理变更控制合同结束合同文件合同协议;合同义务承包承包商的代表规划建设管理合同价格控制图成本估算;质量成本成本控制成本预算成本管理合作失败成本关键路径反馈固定价格化石不可抗力计日工职能组织决定;基本原理决策树缺陷责任定义德尔福技术的一般规则交付的一般规定偏差;代直接费用贴现现金流量;传播公路工程;放电的人力资源管理;争端的人力资源规划图纸水利工程;水电工程;雇主接管身份证书评标启动过程组;执行过程组指示的投标工业建设投资回报分析;无效个人和团队的业绩信息分配谈判指定分包商的间接费用激励奖金信息技术解释;保险观察视察场外在线在职培训开幕投标

This thesis dedicated to research the investment control of BT project, researched the risk in the program construction, the compose portion and the factors effecting the investment. The research includes the conception and the character of the BT project; the actualize process and the questions should be pay attention to; the conditions of BT contract and the sector of the compose poison of the contract price. In this part researched the conception of the BT purchase price and concluded that the relation between the purchase price and the investment. Then studied the risk factors that effect the investment according to the character of the project and then brought forward several advices of the contract item about how to share the risk. Studied compose sector and it's calculatingly methods of the construction cost which is the main part of the investment, then studied how to control the cost during the construct process and analyzed project variations as well as how control that. In the end, researched the capital cost of BT program, the main content include the concept of the capital cost, the calculatingly methods using the engineering economic method, the method writer suggest in the thesis according to the project practice, how to control the capital cost, mainly through setting up an account and inspecting it, and regulating the program financing rate in reason.

本论文的研究重点即BT项目的投资控制,围绕该问题,本论文的主要研究内容有,从BT模式和BT项目的基本分析开始,研究了BT模式的基本概念、BT项目的运作过程、基本特征;研究了BT项目的合同条件和合同价款,该部分分析了BT项目的合同结构、BT项目的承发包工作范围、BT项目的回购价款组成和确定;根据项目建设特征分析了影响BT项目投资的风险因素,并且提出了在对风险进行分配和分担类合同条款制定时建议;建设工程费用是构成BT投资的主体费用,本文对其各组成部分的基本构成、计算方式进行了分析,研究了实施过程中管理控制和工程变更及变更控制的问题;文章的最后对构成BT项目投资的资金成本进行了探讨,分析了资金成本的概念和形成,运用工程经济学的基本理论分析了资金成本各部分的基本计算方式,依据现有的工程实践情况提出了本文建议的计算方式,最后分析了如何对资金成本进行控制――主要通过设立资金账户对其进行监管以及对项目融资的利率进行合理规定。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
The City Is Here For You To Use
Part Of The Process
Illumination
A Process So Familiar
Cost Of Love
Cost Of Love
You Can Leave, But It's Going To Cost You
Love Don't Cost A Thing (RJ Schoolyard Mix)
Cost Me A Lot
Free
推荐网络例句

"The operators will suffer a temporary decrease in the number of consumers and short message services as people may not like having to provide their ID cards for a phone number," Xu Junqi, vice-dean with the Policy-Making Institute of the Telecommunications Research Centre under MII, said yesterday.

信息产业部下属的通信决策研究院副主任徐俊其昨天说:&实行手机实名制后,人们可能不太情愿用身份证注册手机号,所以通信运营商会暂时面临用户减少和短信用户减少的问题。&

I don't believe in make-believe!

我不相信这些虚构的故事。

The edible root of the beet .Fodder preserved in a silo; silage.

贮窖的饲料贮藏在贮窖中的饲料;青贮作物