英语人>网络例句>pier 相关的网络例句
pier相关的网络例句
与 pier 相关的网络例句 [注:此内容来源于网络,仅供参考]

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Combined with the course of construction of Songyuan Longhua Songhua River super-sized bridge,methods of temporary anchor of beam and pier,structure and function of the form traveler ,and improved structure for the pasret-hung casting of the 1# pier base were introduced in this paper.

结合松原龙华松花江特大桥的施工过程,介绍墩梁临时固结的措施,以及挂篮的细部构造及其各部件的功能,并对1#块悬臂浇注时,挂蓝的改进进行阐述。

For a prestressed concrete curved box girder bridge,the interior bracket transition at the inner side of pier circular curve has 2cm dislocation;the middle consolidated concrete filled steel tube pier has 6.4cm offset to the outer side of circular curve. The demand on safety and service performance of bridge are met by reinforcement.

某预应力曲线连续箱梁桥,在施工支架拆除后,过渡墩圆曲线内侧支座脱空2cm,中间固结钢管混凝土墩向圆曲线外侧偏6.4cm,通过加固满足了桥梁安全和使用性能的要求。

Route:Water Bus Pier,Wulin Gate→Sanbao Ship Lock→Bridge No.4 over Qiantang River →View Bridge No.1 far away→Water Bus Pier,Wulin Gate.

夜游线路:武林门巴士码头→三堡船闸→钱江四侨→远观钱江一桥后返回武林门水上巴士码头。票价:上舱120元/人,下舱80元/人

And, based upon the introduction of constitution and reinforcement of bridge pier cap the span adjustment method combined with bridge pier cap and beam seat is proposed.

以神朔复线两座大桥工程为例,介绍了施工图设计概况,阐述了加垫梁墩帽的构造及配筋,提出了采用桥墩墩帽加垫梁调整孔跨的优缺点及其适用条

Not only blocked off the bridge pier from the bridge pier location started long wall has been stretching Cosco two Bay City residential areas.

挡住去路的不仅是桥墩,从桥墩位置开始的长长的围墙,一直伸进中远两湾城住宅区。

A parody to the 4th generation of Central Star Ferry Pier: with the bell sound of the 3rd generation of Central Star Ferry Pier plugged.

恶搞第四代中环天星码头:配上第三代中环天星码头钟声。

Finally, according to the researches of flume experiment and numerical simulation, the article puts forward a new method of flow rate calculation for the circular and pier shaped cylinder measuring flumes, which is much more application, and can meet the need of the free outflow and submerged discharge, meanwhile it analyses the precision of the new method, and provides the theory for the broad application of the circular and pier shaped cylinder measuring flumes.

最后,根据水槽试验和数值模拟研究成果,建立一套适用范围较广的、能满足自由出流和淹没出流需要的圆柱形和桥墩形量水槽的测流计算方法,并对方法的精度进行分析,为圆柱形和桥墩形量水槽的广泛应用提供理论基础。

Atlantic City has the Garden Pier, a warped spine of concrete sprouting grass; in Brighton, the West Pier concert hall where Cubbitt's violin played is now a humped ribcage half-submerged in the sea.

大西洋城依然保留着花园栈桥,一堆残垣断壁之中杂草丛生;在布莱顿, Cubbitt 的琴声曾经在西栈桥上的音乐厅回响,而今它只剩下一座圆丘状的钢梁,像一具骸骨在海面上半沉半浮。

第5/43页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Pier Paolo
Love At The Pier
Hunstanton Pier
Elvis Impersonator: Blackpool Pier
The Shortest Pier
Lido Pier Suicide Car
推荐网络例句

This is not an ordinary box, which is used as a background picture of the dialog box, very pretty.

详细说明:这可不是一个一般的对话框,它是用图片作为背景的对话框,非常好看。

Conceal me what I am,and be my aid for such disguise as haply shall become the form of my intent.

遮掩我的身份,帮助我,我的面具将成为我的目的。

Now, there is no effective methods for this disease, chemotheraphty and hemapoietic stem cell transplantion are often used, but complete remisson rate is not very high.

目前还没有良好的治疗方法,常采用化疗和造血干细胞移植的治疗手段,但完全缓解率并不高,而且在治疗过程中容易诱发肿瘤溶解综合征。