查询词典 ore
- 与 ore 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The mineral processing simulation software aims to realize the simulation calculation of different ore dressing process and is a powerful tool for design and optimization of ore dressing process.
选矿流程模拟软件旨在实现各种选矿过程的模拟计算,以作为选矿过程设计与优化的强有力工具。
-
At the first stage, gold concentrate is produced by ore dressing. We can produce 5 tons of gold every year by daily dressing 4550 tons of ore.
首先我们从采矿石中选出金精矿,公司选矿能力为每天4550吨,矿产金年产量为5吨。
-
The ore-dressing production process is a complex industry process, and cost control deals with many technique indices, so the cost control of ore- dressing production process is difficult to be implemented by the routine approaches.
目前国内许多选矿企业的主要产品价格已与国际市场价格接近,如何降低生产成本,提高市场竞争力,这是关系到选矿企业兴衰的重大问题。
-
In addition, the industrial chain has developed from single mining and ore dressing into integration of exploration, mining and ore dressing.
全球矿业持续经历了几年的疯狂繁荣,以至于这一行业越来越高度集中,产业链亦从单一的矿山采选发展到探采选一体化。
-
In some cases, when the ore dressing machinery factory the size of large ore blocks is also a great degree, in order to reduce the paragraphs broken ratio, or the product in order to get a finer granularity, can also be broken processes, Sec.
在个别情况下,当选矿机械厂的规模很大,原矿块度也很大,为了减少各段破碎比,或者为了得到更细的产品粒度,也可用四段破碎流程。
-
The result shows clearly that a production management was controlled thus the indexes of ore loss and dilution ratio were reduced and the ore dressing recovery percentage was raised and eco...
试验结果表明:通过生产过程管理控制,降低了采矿贫化率和采矿损失率,提高了选矿回收率,增加了矿山企业的经济效益
-
Mt Keith ore dressing plant is casting antenatal 5 years not exceptional also, the ore dressing plant is average of nickel reclaim rate just 60%.
Mt Keith选矿厂在投产前5年也不例外,选矿厂平均镍的回收率刚好60%。
-
Gold metallogenesis in the level of ore belt, ore deposit and orebody are controlled by multi-order tectonic system resulted from orogenesis.
金矿床成矿作用从矿带、矿床到矿体甚至矿脉均受到不同级别的构造变形控制。
-
In order to cut down the cost and pursue economy of scale, every enterprise chartered big vessels to transport a great deal of iron ore when ordering. However, the massive stock occurred because it far more overpast the demand of steel enterprises throughput. Next, the volumes stock bring on abundant cost of stockpile, since it can not be distributed in time due to limited capacity of transportation. Furthermore, there is a big pressure to railway authority to distribute the iron ore.
钢铁企业订购铁矿石时,为降低成本、追求规模效益,一般采取大船进行海运运输,而一次的运量可能大大超过了企业近期的生产能力,大量的库存便产生了;其次,如此大量的矿石集中到港,无法通过疏运能力的"瓶颈",在港口堆场堆存又产生了大量的堆存费用;此外,大批量的疏运对铁路部门也产生了压力。
-
In order to find new pegmatite Nb-Ta ore-deposit, it is very important practical-significances to ascertain the host structure characteristics and the relations between the tectonic epochs and ore-forming.
通过查明矿床的容矿构造特征以及构造期次与成矿的关系,对寻找新的铌钽伟晶岩矿床具有重要的实践意义。
- 相关中文对照歌词
- Oré
- Pronto
- Praise Ye Jah
- Ego
- Iron Ore Betty
- Kurenai
- Full Attention
- City Lights
- 69
- I'm Holding You
- 推荐网络例句
-
Pradeep Indulkar, a senior official at the Maharashtra state Home Ministry say 101 human were killed and 287 injured.
马哈拉施特拉邦内政部高级官员Pradeep Indulkar称,有101人在冲突中丧生,287人受伤。
-
Mark Frei, a senior vice president of West, says 80% of West's homeagents have some college education, compared with 30% of those whowork in office-based call centers.
Frei说,该公司80%在家办公的人员都拥有本科学位,而在公司电话中心工作的人中只有30%拥有本科学位。
-
Based on the application of grey forecasting control theory on the hybrid d cable-stayed bridge, the paper puts forward construct control system of the hybrid cable-stay bridge by cantilever assemble construction.
将灰色系统理论和预测控制理论应用于混合梁斜拉桥,提出了悬臂拼装施工的混合梁斜拉桥施工控制体系。