英语人>网络例句>loading 相关的网络例句
loading相关的网络例句

查询词典 loading

与 loading 相关的网络例句 [注:此内容来源于网络,仅供参考]

Should the carrying vessel has arrived at the port of shipment as advised and the Seller fails to have the quantity of the goods ready for loading in time as specified, the Seller shall be liable for any dead freight or demurrage

如果买方船只按时到达装运港,而卖方不能按规定的时间备妥货物以待装船,则由此而产生的空舱费及滞期费应由卖方负担。

Sludge activation phase, acclimatization phase and aerobic granulation phase. In operation control, the settling-time was used as the key factor for the formation of aerobic granules, which could decant the flocculent sludge and regulate the organic loading, and eventually promote the granulation process.

在运行控制过程中通过将沉降时间作为培养好氧颗粒污泥的一个关键控制参数,它既可以去除反应器中沉降性差的污泥还可以在短时间内调节反应器中的运行负荷,从而促进反应器中好氧污泥快速实现颗粒化。

With regard to engineering,if the effluent time is too short the wire loading of decanter of IAT will be enhanced.

关于工程,如果出水时间太短电线载入酒瓶的内隐联系测验将得到加强。

In situ SEM observations have revealed that fatigue crack propagation is caused by the shear band decohesion around the crack tip and the formation and cracking of the shear band is mainly caused by the plasticity generated in the loading part of a load cycle.

论文摘要: In-Situ SEM的研究揭示了疲劳裂纹的扩展是由裂纹尖端附近的剪力区散屑和生成热引起的,而剪力区裂纹主要是在循环负载下受载部位产生塑性变形引起。

The industrialization process paraments of strawberry by vacuum freeze drying was tested at platform of JDG-230 vacuum freeze drying production line that have drying area :250 m~2,and aims at improving quality and econemic benefit of strawberry by vacuum freeze drying ,result demonstmted:①optimization industrialization process paraments:loading capacity:10.5 kg/m~2,deepfreeze temperature:-30℃,deepfreeze time:2.5 h,pressure of drying room while vacuum sublimation drying:110~130 Pa. pressure of drying room wh...

以干燥面积为250m2的JDG-230型真空冷冻干燥生产线为实验平台,以提高冻干草莓产品质量和经济效益为目标,对冻干草莓生产的工艺参数进行了工业化生产试验,结果表明:1工业化生产适宜工艺参数为:装盘量10.5kg/m2、速冻温度-30℃、速冻时间2.5h、升华干燥时干燥仓压力110~130Pa、干燥解析时干燥仓压力30~50Pa、解析时的物料温度45~50℃;2获得可应用于大工业化生产控制的草莓冻干过程曲线。

In view of the above steps a second phenomenon, clone the operating system is to store the default camera driver in C: \ Windows \ Driver \ Camera \ 301P the following folder, when you click on the new CD-ROM drive to install the camera, the system will not prompt already exists there and the camera drivers to uninstall this driver, please find this folder and removed; step II, first to install a new camera driver, and then plug in the camera loaded with hardware, the installation is complete restart the computer after normal use; step three, repeat the above two steps do not directly click on the new CD-ROM installation the latest drivers, plug in the camera after the system detects new hardware and auto-complete loading hardware drivers; step four, entered the Device Manager, can see the image processing equipment has been successfully installed, but when you open the "AMCAP" Preview images can not be preview, black and white, black phenomenon; five steps to the right mouse button on the image processing equipment "Vimicro USB PC Camera (ZC0301PL)" update driver, a dialog box appears choose "from the list or designated as the location of the installation steps to choose the next six to choose "Do not Search" and enter "to install from the floppy disk interface.

针对以上第二种现象步骤一、克隆操作系统是将摄像头驱动默认存放在C:\Windows\Driver\Camera\301P文件夹下面,当你点击新的摄像头驱动光盘安装时,系统不会提示已经存在有摄像头驱动并把此驱动卸载,请把这个文件夹找到并删除掉;步骤二、先安装新的摄像头驱动,再插上摄像头装载硬件,安装完成后重新启动电脑后可以正常使用;步骤三、不需重复以上两个步骤,直接点击新的光盘安装最新的驱动,插上摄像头后系统检测到新硬件,并自动完成硬件驱动装载;步骤四、进入到设备管理器中,,可以看到图像处理设备已经成功安装,但当你打开"AMCAP"预览图像时会出现无法预览、白屏、黑屏现象;步骤五、把鼠标右键放在图像处理设备的"Vimicro USB PC Camera(ZC0301PL)"更新驱动程序,出现对话框后选择"从列表或指定为位置安装步骤六选择下一步后选择"不要搜索",进入"从软盘安装界面。

The seismic performance such as failure pattern,fai lure mechanism,hyst eresis loop curves,restoring-force model,displacement-restoring capacity,displac ement ductility,rigidity degradation and energy dissipation of two pieces of HPC frame with double-story and double-span are studied systematically by testing o f low reversed cyclic loading.

通过低周反复荷载试验对两榀双层双跨高性能混凝土框架的破坏形态、破坏机制、滞回曲线、骨架曲线、恢复力模型、变形恢复能力、位移延性、刚度退化、耗能能力等性能进行了较为深入系统的研究。

Seller shall pay to Buyer Demurrage incurred at the loading Port in accordance with the terms and conditions of the Charter Party.

卖方应按照租船契约的条款和条件向买方支付在装货港产生的滞期费。

Based on the spectral density function,an efficient and practical method of wind loading simulation is presented.

1引言随着现代材料、施工技术以及设计理论的发展,出现了越来越多柔性的、自重轻、阻尼小的建筑物。

The buyer, if felt necessary, would depute their representative or nominate agency at their cost to witness operations at the loading port.

如果买方认为有必要,可以授权代表或代表监督在装运港对货物检测的操作,其费用由买方自行承担。

第44/100页 首页 < ... 40 41 42 43 44 45 46 47 48 ... > 尾页
相关中文对照歌词
Life's Zombies
Across The Line (Unreleased 2007 Demo)
Across The Line
Believe Me
Christmas For Every Boy And Girl
License
Heartless Remix
Big Tops
Three Strikes
The Christmas Song
推荐网络例句

Don not attempt to do something which you can not to do.

不要企图做那些办不到的事情。

The expression of CTGF and TNF-αweredetected by immunochemistry and the number of Clara Cells was calculated.

光镜下观察肺组织的病理变化,采用免疫组化染色观察肺组织中结缔组织生长因子和肿瘤坏死因子-α的表达和Clara细胞的数量。

The latest results are published online January 13 in the Journal of the National Cancer Institute. They come from a case–control study that involved 459 cases,"which, for the rarity of this cancer, is a very big study," Dr. Stang said.

Stang医师表示,这项最新的研究结果线上发表在1月13日的国家癌症机构期刊上,研究来自一项收纳459个病例的病例控制研究,这是一项非常大的研究。