查询词典 loading factor
- 与 loading factor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This paper discusses the problems met in static test as the setting of datum line beam and reference stake,compaction of main beam by jack,loading side test,and quick and slow loading method,in order to ensure scientificity and accuracy of static test data,and to improve the quality of pile foundation detection and the reliability of detection evaluation result.
对基准梁与基准桩的设置、主梁压实千斤顶、边堆载边试验、慢速与快速加荷法等静载试验中遇到的问题进行了探讨,以保证静载试验数据的科学性和准确性,从而提高了桩基检测工作的质量和检测评定结果的可靠性。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.
在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。
-
In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
-
Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.
装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
- 相关中文对照歌词
- The Twang Factor
- Life's Zombies
- Age Ain't A Factor
- Across The Line (Unreleased 2007 Demo)
- Across The Line
- When The Love Factor's High
- Fed
- Chill Factor
- Believe Me
- Stress Factor
- 推荐网络例句
-
Fostering the concept of multi-culture firmly and mastering the development of advanced culture correctly are conductive to resisting terrorism, separatism of nationalities and ultraism of religion, which is of great academic theoretical, immediate and profound historical si...
牢固树立多元文化的理念和正确把握先进文化的发展方向,有助于在世界范围内自觉地抵制恐怖主义,民族分裂主义和宗教极端主义。不仅具有重大的学术理论意义,而且也具有重大的现实意义和深远的历史意义。
-
But if anyone walks in the night, he stumbles, because the light is not in him.
11:10 若在黑夜行走,就必碰跌,因为那光不在他里面。
-
You are asking for the moon.
你的要求太过分了。