英语人>网络例句>load chart 相关的网络例句
load chart相关的网络例句

查询词典 load chart

与 load chart 相关的网络例句 [注:此内容来源于网络,仅供参考]

A comparison of the two displaying methods of cooling-load rate distribution, that is, time frequency chart and probability distribution curve, is made.

对时间频数图、概率分布图这两种负荷率分布的表示方法进行了比较。

When mixed into the same carbon fiber quantity is 1.0%, differ age material's AC impedance chart is discrepancy very much, along with to hydrate age's add, C-S-H gel isa great deal of form, the solution resistance at the concrete is gradually aggrandizement, the carbon fibre of here qua transmit electricity quality disperse would leading effect of conductance, along with the add of exterior load, the transmit electricity quality of concrete is almost nothing change, till breakage, resistance change rate tempestuousness add, and that the resistance change rate along with inside stress linearity add of corbon fibre concrete in elasticity phase, when near peak value load, resistance rate just gradually add, indicate the test sample would be about to breakage.

当碳纤维体积掺量同为1.0%时,不同龄期材料的交流阻抗谱相差很大,随着水化龄期的增长,C-S-H凝胶大量形成,水泥基材料中的溶液电阻逐渐增大,此时作为导电性分散相的碳纤维将起电导的主导作用。随着外部荷载的增加,基准水泥基材料的导电性几乎无变化,直到破坏时,电阻变化率剧烈增大,而碳纤维水泥基材料在弹性阶段其电阻变化率随内部应力线性增加,当接近峰值荷载时,电阻率才逐渐增大,预示试件即将破坏。

Secondly, the paper carries on the destruction processes and the stress distribution situation numerical simulation of the concrete three point bending specimen with bias crack under static load function,, and analyze specimen crack expansion and the destruction mechanism, obtain the reason that the crack expanding flectional way is because the material nonuniformity, in the same time, from the specimen destruction process chart we can see that the crack bias degree has some influence on the crack expansion way.

其次论文对含偏置裂纹的混凝土三点弯曲试件在静态载荷作用下的破坏过程和应力分布情况进行了数值模拟,并对试件的裂纹扩展和破坏机理进行了分析,得出裂纹扩展的曲折性是由于材料不均匀性所引起的,同时从试件的破坏过程图中可以看出,裂纹的偏置程度对裂纹的扩展路径有一定的影响。

Having studied the relation of oil well paraffine precipitation and the rod load, the paper finds one new method to predict the oil paraffine precipitation ---statistics comparison of the indicator diagram, and calculates the paraffin removal cycle as well as the paraffin removal time And predicts the oil well paraffin precipitation; Combined with the test data of oil field and the basic production parameter of the oil well system, the paper has carried on close analysis of the efficiency of the single well system, and obtained each target reflecting the system operation; the efficiency of the oil pumping mechanical well system has been improved and the submersion pressure mathematical model has been completed, and the author draws up the dynamic control chart of sub-area system efficiency, thus raises the management level in the oil well system efficiency.

通过研究油井结蜡速度与抽油机悬点载荷的关系,将油井结蜡与示功图结合到一起,找到一种对油井结蜡预测的新方法——示功图统计对比法,计算出清蜡周期与清蜡时间,预防了油井蜡卡;以现场示功图为依据,结合生产参数对抽油机井系统效率进行实测分析,完善系统效率与沉没压力的数学模型并绘制油井系统效率动态控制图,对系统效率进行了检测评价与优化。

Based on the air-conditioning properties of radiation cooling with evaporative cooling, the precise distribution of moisture and cooling load is carried out using psychrometric chart.

根据蒸发冷却和辐射供冷的热湿处理空调特性,利用焓湿图分配其热湿负荷。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The load characteristics chart of the whole distillation tower was proposed.

提出了一种蒸馏塔全塔负荷性能图。

This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.

本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。

This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.

该下载资料由本站会员上传,如果侵犯了您的权力,请通知我们,将立即删除!摘要本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。

第2/3页 首页 < 1 2 3 > 尾页
推荐网络例句

Cynanchum Lingtai apricot production in the average weight 65 grams, the brightly-colored fruit, juicy rich, sweet-sour taste, sweet from the nucleolus, when the late Qing Dynasty famous Shaanxi, Gansu provinces, the Qing imperial court Tongzhi tribute for years.

灵台生产的牛心杏平均单果重65克,果实色泽鲜艳,汁多味浓,甜酸适口,离核仁甜,清末时就驰名陕、甘两省,清同治年间曾为朝廷贡品。

Chenopodium album,Solanum nigrum, and Amaranthus retroflexus were very susceptible to the herbicides. Polygonum persicaria and Abutilon theophrasti were relatively less susceptible to the herbicides, and Lycopersicon esculentum was not susceptible to it. The relationship between reduction rates of weed biomass and PPM values of weed leaves 2,4, and 6 days after treatment was established.

供试的6种杂草对该混剂的敏感性存在显著差异:红心藜Chenopodium album、龙葵Solanum nigrum和反枝苋Amaranthus retroflexus对该混剂最敏感,ED90值分别为47.65、71.67和29.17g/hm2;春蓼Polygonum persicaria和苘麻Abutilon theophrasti敏感,ED90值分别为96.91、114.20g/hm2;而番茄不敏感。

However, I have an idea.

不过,我有个主意。