英语人>网络例句>installation kit 相关的网络例句
installation kit相关的网络例句

查询词典 installation kit

与 installation kit 相关的网络例句 [注:此内容来源于网络,仅供参考]

Hydropower installation - cable, telephone line, network line layout engineering, Kitchenware, sanitary ware, all types of water pipe installation and repair; renovation works - floor polishing, waxing, painting doors and windows, carpet cleaning, aluminum alloy, anti-theft Net renovation; carpentry production - package×,°×, dining rooms and restaurants and local modeling corridor ceiling, counter-type production.

水电安装--电线、电话线、网络线的布置工程,橱具、洁具、各类水管的安装及维修;★★翻新工程--地板打磨、打蜡,门窗油漆,地毯清洗、铝合金、防盗网的翻新;★★木工制作--包门套、窗套、客厅餐厅及走廊局部造型吊顶、柜类制作工程。

To address this situation, I believe that the operation could be improved on are: the installation and adjustment of measuring, the first sub-scale do to adjust the nominal cylinder liner size, and then dial indicator card installed and well well inserted under the initial installation of the traffic card directly into the cylinder table by measuring the smallest cylinder liner wear, the cylinder table adjust the volume of the extended length of rod inserted, so that the volume of the dial indicator cylinder table has small hands around 1.5-2.0 preloading cell volume and cylinder volume table mother under lock locking plug, the final table and then measured the volume of cylinder rod and rod card inserted at the anvil micrometer measuring bar between the seat and the large dial and adjust the dial indicator to zero.

针对这种情况,笔者认为,操作上可改进为:安装和调整量具时,先将干分尺调整到气缸套的公称尺寸,再将卡装好百分表和初步安装好插杆的量缸表直接卡入所测气缸套磨损最小处,调整量缸表插杆的伸出长度,使量缸表的百分表小表针有1.5-2.0格左右的预压量并将量缸表的插杆锁母锁紧,最后再将量缸表的测杆和插杆卡在千分尺的砧座和测杆之间并将百分表的大表盘调整到零。

Combined with practical construction,the author introduces the fixed form of color steel plate installation,lap joint of side and end,selection of self-tapping screw ,and setting of ribbon skylight,illustrates the methods to install color steel plate,and points out the problems should be noticed in installation construction,in order to ensure construction quality.

结合施工实践,对彩钢板安装的固定方式、侧向和端部搭接、自攻螺钉的选用、采光带的设置等方面进行了介绍,并阐述了彩钢板的安装方法,指出了安装施工中需注意的问题,以保证施工质量。

Crane Installation: lifting plate road, installation, with 5 tons, 8 tons, 12 tons, 20 tons, truck crane, hydraulic truck 1-3 t, 2-5 t forklifts, all kinds of hanging chain.

起重安装:起重盘路、安装、备有5吨、8吨、12吨、20吨、汽车吊、一至三吨液压车、二至五吨铲车、各种吊链等。

Chinese Nuclear Industry 23rd Construction Corporation(CNI23), as a synthetic equipment-installing company of Chinese nuclear industry system, was founded in 1958. Its main businesses are nuclear power engineering, nuclear engineering and national defense industry projects. It undertakes all the tasks of mainlands installation of nuclear facilities, and it also has gained the main contractor status of the domestic nuclear power plant projects and the market of nuclear engineering equipment installation.

中国核工业第二三建设公司作为我国核工业系统的综合性设备安装公司,自1958年成立以来以核电工程、核工程和国防军工工程建设为主营业务,承担了国内大部分核设施的安装施工任务,奠定了国内核电站工程、核工程设备安装市场的主要承包商地位。

Note: Installation of software often requires one or more reboots to complete the installation.

注:安装软件,往往需要一个或多个重启完成安装。

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间的配合达到最佳状态,仍需大量的修整工作,如镗床的齿轮与齿条,若拆卸后齿轮的各项性能指标经检测尚能使用不需更换,而齿条磨损严重需更换,那么齿条及齿条安装面上的定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮的啮合间隙需达到技术要求的标准,此项工作需时约一天。

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间旳配合达到最佳状态,仍需大量旳修整工作,如镗床旳齿轮与齿条,若拆卸后齿轮旳各项性能指标经检测尚能使用不需更换,而齿条磨损厉害需更换,那么齿条嘉逸条安装面上旳定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮旳啮合间隙需达到技术要求旳标准,此项工作需时约─天。

Existing professional engineering and technical personnel 15, manufacture and installation of 100 staff, 10 management staff, mainly engaged in powders, liquids, wood painting, book and the whole plant equipment planning, design, manufacture, installation, maintenance.

现有专业工程技术人员15名,制造安装人员100名,管理人员10名,主要从事粉体、液体、电著及木器涂装设备的整厂规划、设计、制造、安装、维修。

On a second installation portion movable relative to the first installation portion owing to the on/off of the elevator doors, a mark reader is installed to detect the wireless marking apparatus.

在通过电梯门的开闭动作而相对于第1安装部相对移动的第2安装部上,安装有检测无线标记装置的标记读取器。

第18/100页 首页 < ... 14 15 16 17 18 19 20 21 22 ... > 尾页
相关中文对照歌词
Trippy
Kit (What's The Scoop)
First Date Kit
Pioneers
Pack Up
Screw Done Already Warned Me
Maybe She Will
Tickle Cove Pond
Pledge Of Allegiance
Longform
推荐网络例句

What was it that made you want to change sider ?

是什么使你临阵倒戈?

I don't know what he wants, but let's play along with him.

我不知道他要干什么,可我

There are a few points you should remember when inflating tires:

在给轮胎充气时,应注意以下几点