英语人>网络例句>horizontal plan 相关的网络例句
horizontal plan相关的网络例句

查询词典 horizontal plan

与 horizontal plan 相关的网络例句 [注:此内容来源于网络,仅供参考]

The problems of point - line - plane - volume; the facts of square - circle - triangle; the mysteries of central - peripheral - frontal - oblique - concave - convex; the right angle and perpendicular; of scale and position; the interest in post- lintel, wall-slab, vertical-horizontal; the arguments of two-dimensional and three-dimensional space; the extent of a limited field; the meaning of implied extension; the meaning of plan, of section, of spatial expansion - spatial contraction - spatial compression - spatial tension; the direction of regulating lines, of grids; the relationships of figure to ground, or number to proportion, of measurement to scale, of symmetry to asymmetry, of diamond to diagonal; the hidden forces, the ideas of configuration; the static, the dynamic: all these begin to take on the form of a vocabulary.

点-线-面-体的课题;正方形-圆形-三角形的事实;中央-边缘-正对-倾斜-凹入-凸出的奥秘;直角与垂直;尺度与位置;柱-梁、墙-板、竖直-水平的旨趣;两维与三维空间的思辩;局促场所的极限;暗示延伸的含意;平面、剖面、空间扩充-空间收缩-空间挤压-空间张拉的意义;控制线与网格的方向;图与底、数字与比例、尺寸与尺度、对称与非对称、菱形与对角线的关系;暗藏的力量、构型的想法;静态、动态━这一切都将发展成为语汇的形式。

This paper offers a theoretical basis for the construction of the underground roadway near 1178 level and for the mining safety of the horizontal jamb. The research has instructional significance to the corporation's produce plan and decision-making.

研究成果为矿区1178附近分段道的安全施工和水平矿柱的安全回采提供了理论依据,对科学决策矿区的重大生产问题及合理制定未来的生产计划具有指导价值。

Primarily clad in high-performance glazing that features horizontal sunshades along all southern exposures, the tower's triangular plan is designed to ensure that all rooms receive southern light as well as views of the sea and nearby mountain ranges.

高性能的玻璃幕墙在朝南面形成水平遮阳系统,塔楼三角形的平面设计确保了所有房间均能得到南面的采光以及海景和附近的山景。

The tube ABC shown is cantilevered with AB and BC in a horizontal plan.

所示的管ABC是由位于同一水平面内的AB和BC组成的悬臂。

When selecting well location and optimizing design plan, the authors advocate sticking to the following principles including restricting hole deviation, barefoot interval and horizontal displacement in the scope of 35 degrees, 400 meters and 200 meters respectively, trying to decrease the work of changing direction and hole deviation to ensure smooth borehole and increasing the quality of sidetracking and cementing wells and the results of oil increase.

在进行井位筛选和优化设计方案时应遵循的原则是:将井斜、裸眼段长、水平位移分别控制在35度、400米、200米之内,尽量减少变方位变井斜的工作量保证井眼平滑,提高侧钻井固井质量和增油效果。

In the first place, the normal flexible body dynamics modelling method of continous system is built based on hamilton principle. And then taking the flexible beam tunning in the horizontal plan for example, in the assumption of Euler-Bernoulli beam,the identical linearilized vibration differential equation is deduced according to geometry constraint conditions .

首先基于Hamilton原理建立起一般柔性体连续系统的动力学建模方法,进而以水平面内作大范围回转运动的柔性梁为例,在Eu1er-Bemoulli梁模型的假设前提下,根据轴向不可伸长的柔性梁的几何约束条件,推导出作大范围刚体运动的柔性梁连续系统的一致线性化振动微分方程。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The feasibility and the security of the double-decked concrete structure technology used in horizontal section of desulphurization flue in Zunyi Electric Power Plant was introduced as well as construction plan,comparison of time with other construction plan,the heat preservation and anticorrosion of the concrete structure.

介绍了遵义电厂的脱硫烟道水平段采用双层混凝土结构技术的可行性和安全性,以及施工的方案和与其他施工方案的工期的比较,并且介绍了混凝土结构的保温防腐问题。

Finally arranges and the plan plating department horizontal plan designing and the plan electroplating bath tank the platoon windsail and so on the non- standard equipment detail as well as craft card certain.

最后布置并绘制电镀车间平面图,设计并绘制电镀槽、排风罩等非标准设备详图以及工艺卡若干张。

第1/2页 1 2 > 尾页
推荐网络例句

If you are unfortunate enough to the lovelorn, please tell me, I will help you out, really, please contact me!

如果你不幸失恋了,请告诉我,我会帮助你摆脱困境,真的,请联系我啦!

China's plan to cut energy intensity by 20 percent and pollutant discharges by 10 percent between 2006 and 2010 is a case in point.

中国计划在2006年到2010间降低20%的能源强度和减少10%的主要污染物排放,就是一个这样的例子。

Well, Jerry would rattle off all the details of that movie.

那么,杰瑞会急促背诵那部电影所有细节。