英语人>网络例句>first base 相关的网络例句
first base相关的网络例句

查询词典 first base

与 first base 相关的网络例句 [注:此内容来源于网络,仅供参考]

When code stream is passing through the decoder for variable length code, first, prefix analyzer is utilized to find packet information so as to obtain length of current code and pseudo base address; then, four least significant bits of the code are added to pseudo base address through accumulator so as to obtain address of the code in code table.

码流经过可变长码解码器时,首先使用前缀分析器查找分组信息,得到当前码字的长度和伪基础地址,然后使用累加器把这个码字的最低4位和伪基础地址相加,获得该码字在码表中的地址,从而获得解码信息,完成解码。

The liquid crystal box wall structure is formed between the upper base board and the lower base board, and has several reflecting regions to form the first channel and several penetrating regions to form the second channel.

液晶盒墙结构是夹设于上、下基板之间,用以使复数个反射区形成第一通道,并使复数个穿透区形成第二通道。

Thirdly, it analyzes and studies in detail Surpac mechanism and the relevant concepts on constructing the model of mineral deposits and mining engineering systems according to the modeling procedure and the actual conditions of Jinchuan"s mines. Based on these:Lit points out some differences between the western countries and China in the practice of the geological data record, explores the inputting data on computers performed by more people at the same time and the method to improve constructing the data-base and finished the data-base of Jinchuan mineral deposits;2.It puts forward the steps and flow chart to construct the solid model and brings forward the scheme of "first individual then whole to set up Jinchuan mineral deposits geological model, summarizes some experiences for constructing the complicated geological ore body of the high accuracy: add control lines, add auxiliary demarcation lines +control lines, the operation of intersection, cross and incorporation between solid bodies and plane and section combination. The above-mentioned methods applied to construct the mineral deposits solid models of four mine areas in Jinchuan; 3.lt studies and presents the detailed flow chart of constructing block and grade model, analyses the workable scheme in setting up the block and grade model of main ore body for Jinchuan mineral deposits and also sets it up.

接着,按建模流程并结合公司矿山实情,详细研究、分析了Surpac构造矿床模型和采矿工程系统模型的机理、有关概念,在此基础上:(1)指出了西方国家与我国在地质数据记录习惯方面存在的一些差异,探索出多人多机同时录入、提高建库效率的方法,建立了金川矿床地质数据库;(2)研究并提出了构造实体模型的步骤和流程图及&先分后整&建立金川矿床地质体实体模型方案,总结出建立高精度复杂地质体模型几点经验:添加控制线法、添加辅助分界线+控制线法、实体间的交、叉、并运算法及平剖面图联合法,建立了金川矿床四个矿区主矿体的实体模型;(3)研究并提出了建立块模型、品位模型详细流程图,分析了建立金川矿床主矿体块模型和品位模型的可行方案,建立了金川矿床主矿体的块模型和品位模型。

"He knows how to play the game," Girardi said."He's worked with all kinds of different types of players, being a manager in the Minor Leagues, being a first-base coach and a third-base coach."

他懂怎麼打好一场比赛,」Girardi 说:「他与各式各样的球员相处过,在小联盟当过总教练,当过一垒与三垒指导教练。

Want to decide the azimuth of a mobile phone has two kinds of methods normally: The first kind of method is the GPS chip that the mobile phone uses, pass the satellitic network that in the sky covers the world and wireless communication to identify the trend with located mobile phone; The 2nd kind of method is three angular distance calculate a standard, mobile phone to around base the station issues signal, differ through calculating signal to arrive at base the time of the station will determine the mobile phone is located azimuth.

要确定一部手机的方位通常有两种方法:第一种方法是手机使用的GPS芯片,通过覆盖地球上空的卫星网络和无线通信来识别手机所处的方位;第二种方法是三角距离测算法,手机向四周的基站发出信号,通过测算信号抵达不同基站的时间来测定手机所处方位。

CAS radiation technology services company in Shanghai of the Chinese Academy of Sciences, the Ministry of radiation technology company in Shanghai's technology subsidiary, and the Chinese Academy of Sciences radiation technology company in 1989 by the Chinese Academy of Sciences of Nuclear Science and Physical and Chemical led the organization of the Chinese Academy of Sciences, owned by high-energy physics Shanghai by the atomic nucleus, Lanzhou Modern Physics, Plasma Physics in Hefei, the Changchun Applied Chemistry, Hefei Chinese Scientific and Technical University jointly established a joint venture and technical input, built for the cable factory in Yantai, Changshu Cable Factory, Liyang Cable Factory, Huaian cable factory Electronic contracting, such as the establishment of a special radiation cross-linking cable production lines and a number of radiation center and computer and new materials production base, by the relevant State Council ministries and provincial and municipal leaders on the importance and recognition, that was the first national high-tech Enterprise units, radiation technology company in 2002 to reform the merger into a new high-tech companies, and the Shanghai Technology Services Division of the Department of independent legal entities and by relying on the Chinese nuclear radiation and high-tech base for the successful trial production of 200-nanometer tetrafluoroethylene Ethylene special engineering plastics ultra-fine powder, consisting mainly expected to add new type of dispersing agent, detergent, antioxidant Kangfu agent, the preparation of a motor vehicle and vessel efficient use of lubricating oil additives series.

中国科学院辐射技术公司上海服务部系原中国科学院辐射技术公司在上海的技术子公司,而中国科学院辐射技术公司是1989年由中科院数理化局核科学处牵头组织中国科学院所属的高能物理所,上海原子核所、兰州近代物理所、合肥等离子物理所、长春应用化学所、合肥中国科技大学共同合资并投入技术建立的,建成后为烟台电缆厂、常熟电缆厂、溧阳电缆厂、淮安电缆厂等承包建立了电子辐照交联特种电缆生产线和一批辐照中心和计算机及新材料生产基地,受到国务院有关部委和有关省市领导的重视和表扬,并被国家认定的第一批高技术企业单位,2002年辐射技术公司进行体制改革合并成新的高技术公司,而上海技术服务部系独立法人单位并依托中科院原子核所辐照基地的高新技术及试制成功的200纳米聚四氟乙烯特种工程塑料超细粉,以此为主料加上新型的分散剂、清净剂、抗氧抗腐剂等,配制成汽车用和船舶用的高效润滑油系列添加剂。

Thus,"Newton Base" continues to be the designated name for the first base, but its location has been moved, in this second edition, to the summit of Mons Malapert.

这样,&牛顿基地&继续作为第一月球基地的命名,不过它的位置变了,在第二版中,指的是马拉普特高地的最高点。

The Soft-Hard Acid-Base Theory was used to interpret the experimental results for the first time, the softness of sulfur, which was a Lewis base, was changed by solvents, and the reactivity of sulfur atom was changed.

结果表明,砷化镓表面硫化层厚度与所用溶液的极性有关,用极性小的有机醇作溶剂可以得到更厚的硫钝化层。

The first phase array ofthe AS γ experiment began to run in June 1990. The first phase array thatconsists of 49 plastic scintillate detector has an angle resolution of 1°, atrigger rate of 20Hz and a threshold energy of about 10TeV. The second phasearray was finished on the base of the first phase array in 1994, and after that, apart of the second phase array was made high density.

一期阵列由49个塑料闪烁体探测器组成,探测阈能为10TeV左右,事例触发率为20Hz,角分辨率小于1°。1994年在一期阵列的基础上进行了扩建,扩建后阵列比一期阵列有效面积增大8倍,随后进行了部分加密,建成二期/加密阵列。

The machine component claimed in claim 1, in which the second mounting means comprises a toggle bracket fixed with respect to the base plate, a toggle lever located above the slide plate and pivotally mounted to said toggle bracket about afirst axis, a clevis bracket affixed to the slide plate, a toggle link pivotally mounted at one end to said clevis bracket and pivotally mounted at the other end to said toggle lever at a second axis spaced from said first axis, one part of said assemblybeing pivotally mounted to said toggle lever at a third axis spaced from said first axis, the second and third axes being spaced different distances from said first axis.

机器组件索赔要求1,其中第二次安装的手段包括一个切换支架方面的底板,上面一个切换杠杆的滑板位于pivotally说,安装在固定支架切换对afirst轴,一羊角支架贴幻灯片板,一个切换链接pivotally在一端的安装支架,并说,羊角pivotally在另一端安装说,从第二个间隔轴切换杆称,第一轴,其中的一部分说assemblybeing pivotally安装在切换上说杠杆间隔从第三轴轴表示,第一,第二和第三轴间距是从不同的距离表示,第一轴。

第26/50页 首页 < ... 22 23 24 25 26 27 28 29 30 ... > 尾页
相关中文对照歌词
My Ride
Base For Your Face
Fuera De Base
Bad Bitch Hunna Based Freestyle
À La Base
Fuck Martinez
First Time
Electric City
Love In The First
Industreet (Cypher)
推荐网络例句

The system can be widely used in belt weighing and batching process control,etc.

介绍了基于智能模糊控制的嵌入式配料系统的设计方法,对模糊PID控制过程和系统调零作了重点的讨论,同时给出了PID控制的程序流程图和系统定长调零子程序。

"I dunno," she answered,"but if you show me aroun', I'll recognize it from the lighthouse just outside the porthole."

"我不知道,"她回答说,"如果你能带我转转,我能认出来的,因为灯塔就在舷窗外。"

That experience was of great benefit to me.

那次经历对我很有益处。