查询词典 correctness
- 与 correctness 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The successful utility of a 300 MW unit proves the correctness of this test,which provides an effective way to solve the slagging problem in the furnace of a large scale power plant boiler. power plant boiler ; slagging ; numerical test ; coal powder burner
当锅炉采用导流板式燃烧器时,一方面由于导流板的作用,使一次风向炉膛中心偏转,改善了一次风背火侧的补气条件,另一方面由于一次风煤粉气流的切圆直径变小
-
The correctness of theory analysis is proved by the test results of 5 concrete-filled double steel tubular short column specimens subjected to axial compression load.
试验结果表明,在轴心受压荷载作用下双钢管混凝土柱的受力全过程是由弹性、弹塑性以及破坏3个阶段组成的,具有很好的延性。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts ofthe Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points lines and levels of reference given by the Engineer in writing and for the correctness subject as above mentioned of the position levels dimensions and alignment of all parts of the Works and for the provision of all necessary instruments appliances and labor in connection therewith.
承包人负责根据工程师的书面指示准确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The checking of any setting-out or of any line or level by the Engineer or the Engineers Representative shall not in any way relieve the Contractor of his responsibility for the correctness thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails,pegs and other things used in setting-out the Works.
承包人不得因工程师或工程师代表对任何位置测定或任何线或任何水平面的检查而免去确保其正确无误的责任,承包人必须仔细保护和保存工程位置测定中使用过的水准点、观测杆、测标及其他物品。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。
-
The checking of any setting-out or of any line or level by the Engineer or the Engineer's Representative shall not in any way relieve the Contractor of his responsibility for the correctness thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails, pegs and other things used in setting-out the Works.
承包人不得因工程师或工程师代表对任何位置测定或任何线或任何水平面的检查而免去确保其正确无误的责任,承包人必须仔细保护和保存工程位置测定中使用过的水准点、观测杆、测标及其他物品。
-
The Contractor shall be responsiblefor the true and proper setting-out of the Works in relation tooriginal points, lines and levels of reference given by theEngineer in writing and for the correctness, subject as abovementioned, of the position, levels, dimensions and alignment of allparts of the Works and for the provision of all necessaryinstruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
- 推荐网络例句
-
There are different types of personal loans available.
有许多不同类型的个人贷款优惠。
-
The above mentioned teaching model of spiral rising can be used to avoid rigidness in teaching.
上述螺旋式上升的教学模式,可以避免教学形成模式後的僵化现象。
-
In addition, the mass transfer process of main components in the heat pump cycle, such as a generator and an absorber, is analyzed, and the mass trasfer model, the relation of its separation effectiveness with the thermodynamic inconvertibility are described.
根据热力学第一、二定律,从理论上建立了描述该类热泵的数学模型。从热力学不可逆性原理出发,分析了热泵循环过程的热力学不可逆性引起的〓损失。