查询词典 construction
- 与 construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In chapter two and three, combined with example, this paper discusses theapplication of value engineering in construction engineering project managementsuch as design, invitation for bid, optimization of construction organization anddesign, selection of material and equipment, and demonstrates that valueengineering can bring huge economic and social benefit in constructionengineering project management and recommends some adoptable valueengineering methods in each stage of construction engineering project for thepurpose of extending it maneuverability in construction engineering projectmanagement.
第二、三章结合实例介绍了价值工程在建设工程项目管理我国建设工程项目管理中设计、招标、施工组织设计优化、优选材料和设备等阶段的应用,论证了价值工程在建设工程项目管理中能够产生巨大经济效益和社会效益,并推介了一些在建设工程项目各阶段可以采用的价值工程方法,旨在推广建设项目管理中应用价值工程的可操作性。
-
Based on the essence of socialist moral integrity, guided by Marxisim, Leninism, Maozedong thought, Dengxiaoping theory,"Three represents" and two "resolutions" by CCPCC on the construction of socialist moral integrity, and at the same time , on the basis of the fact that internet is an important position for the construction of socialist moral integrity and for the development of Chinese advanced culture, this paper discusses both the positive and negative impacts of the development of internet on the construction of socialist moral integrity from the viewpoint of dialectical materialism and historical materialism, and it also talks about new mechanisms, measures, methods for the construction of internet moral integrity on the principle of scientific and humane spirit.
论文从社会主义精神文明建设内涵出发,以马列主义、毛泽东思想、邓小平理论和"三个代表"的重要思想以及中共中央关于精神文明建设的两个《决议》为指导,从理论和实践、宏观和微观、历史和逻辑的视角,立足于网络是社会主义精神文明建设和中国先进文化发展的重要阵地,运用辩证唯物主义和历史唯物主义的观点分析了网络发展对社会主义精神文明建设正负影响,坚持科学精神和人文精神的协调原则,探讨了网络精神文明建设的新机制、新途径、新方法、新措施。
-
In order to cope with the huge deformation of the highlystressed phyllite ground in the ridge section of Wushaoling tunnel, the construction program is constantly optimized, the construction technology is persistently improved, standard time duration is determined for each construction step and strict construction organization management is performed.
针对乌鞘岭隧道岭脊段高地应力千枚岩大变形,通过对施工方案不断优化,对施工工艺不断改进,并制定各工序标准耗时,同时进行严格的施工组织管理,得到了在高地应力条件下能较好控制软岩大变形的一整套快速施工技术。
-
AYDOGDU Schweisstechnik leads high-quality services and products to Piping construction, Construction of pipage system in addition to Pipework system construction, Plant construction and to Inert gas welding.
该企业竭诚为贵公司介绍关于焊接、管道结构、管道安装、焊接操作以及工业设备制造和设备制造费用信息,请拨打
-
Regions actively introduce policies to guide the reform and development of the construction industry, construction enterprises modern property rights system reform in full swing; Industry and enterprise restructuring has made remarkable progress, constantly improve industrial concentration; Construction management and the rapid increase of technological innovation, market competitiveness gradually improved; outstanding works of the main line to clear rectifying and standardizing the market mechanism has taken shape, the market order and safety engineering quality, especially construction safety situation has further improved.
各地区积极出台有关政策引导建筑业改革发展,建筑业企业现代产权制度改革全面展开;行业和企业结构调整取得明显进展,产业集中度不断提高;建筑业企业管理和技术创新能力快速增强,市场竞争力逐步提高;以清理拖欠工程款为主线的市场整顿规范机制基本形成,市场秩序和工程质量安全,特别是建筑安全生产形势进一步好转;清理拖欠工程款和农民工工资问题取得初步成果。
-
To make use of non-polluting materials and interior decoration crafts; Attention to the construction site refuse and construction waste disposal life to the timely liquidation, and are not allowed to randomly flash; To prevent the spread of SARS virus, attention sewage and ventilation Road closed; Attention to personal hygiene, appropriate attention to rest and infectious diseases should be prohibited in the construction workers, to prevent the spread of diseases; attention to the construction site of the ventilation and air purification disinfection works after, must be disinfected later hand over completed project.
尽量使用无污染的室内装饰材料与工艺;注意施工现场生活垃圾和建筑垃圾的处理,要及时清理,不得随意抛洒;为了防止非典病毒的传播,注意下水道和通风道的封闭;注意个人卫生。。。。。。
-
Cao Yushu total right to build wells at coal mine near a period of construction work to be fully affirmed the work of the next stage of requirements: First, be aware of Coal Mine Safety Elm Well the importance of pre-production and further enhance the sense of responsibility and sense of mission , we must bear in mind the "second pioneering" historical mission, to take more effective and more practical methods of work, the scientific arrangement of the work, carefully organize construction work, the remaining project duration inverted one by one to ensure that mine pre-production schedule; second, is necessary to study the construction process to solve difficulties and problems arise, focus on strengthening the soft rock supporting and construction process of research, trial and error comparison, mine worked out well for Elm soft rock supporting a new road.
曹总对榆树井煤矿筹建处近一时期的矿井建设工作予以了充分肯定,并对下一步的工作提出了要求:一是要认识榆树井煤矿安全试生产的重要意义,进一步增强责任感和使命感,要牢记肩负的"二次创业"历史使命,采取更加有效、更加务实的工作方法,科学安排各项工作,精心组织施工,对剩余工程逐项倒排工期,确保矿井按期试生产;二是要及时研究解决施工过程中出现的困难和问题,重点加强对软岩支护和施工工艺的研究,反复试验比较,摸索出适合榆树井煤矿软岩支护的新路子。
-
Construction methods of large-span reticulated cylindrical shell are studied in this paper, based on variety of existing spacial structure construction methods. A new type of construction method that the structure is formed integrally by sliding support is bring forward in literature [1]. Construction process run-after computation is conducted by Ansys program, and a new type of hinged joint is obtained.
本文在概括总结了现有的各种空间结构施工方法的基础上,着重研究了大跨度柱面网壳结构的施工技术,对文献[1]提出的新施工方法——柱面网壳支座水平滑移结构整体成形施工法进行了施工全过程的跟踪模拟和结构内力分析,给出了具体施工实施方法,并提出了一种可单自由度转动的新型铰接节点。
-
Some important state level centers, labs, bases, such as the "China National Engineering Research Center for Human Settlements," the "NERC for Urban Water and Wastewater," the "National Center of Testing and Supervision for Gas Appliances," the "City Gas Technical Development Center of the Ministry of Construction," the "Quality Testing and Supervision Center for Equipment of Water and Wastewater Engineering of the Ministry of Construction," the "Environmental Sanitary Engineering Technical Research Center of the Ministry of Construction", the "Environmental Sanitary Engineering Technical Promotion Office of the Ministry of Construction","Key Scientific Research Base of the Conservation Planning for Cultural Heritage of the State Administration for Cultural Heritage" and the "National House Applicants Testing Lab" are all stationed in the Group.
我院在保持专业设计研究院优势的基础上,建立以"项目为中心"的管理体制,设立院集团设计运营中心、项目总监部、专业设计研究工作室和名人工作室,专业化改革逐步完善,企业核心竞争力逐渐增强。我院将继续发扬"忠诚、贡献、创新"的企业精神,秉承"科学管理、竭诚服务、精心设计、质量第一"的执业方针,坚持"从质量中求精品、从管理中求效益、从服务中求市场、从创新中求发展"的工作宗旨,充分利用设计与科研、人才与技术等综合优势,积极开拓更广阔的业务市场,与国内外朋友开展广泛诚挚的合作,为广大客户提供高效优质的服务。
-
Enterprise HISTORY: Chengdu Yu Lung Industrial Company was established in 2002, can take a road surface and highway roadbed construction and professional secondary road construction, irrigation and water conservancy, bridge construction, municipal construction.
企业简况:成都市羽龙实业公司成立于2002年,可承担一级公路路面和高速公路路基施工及专业二级路面施工、农田水利、桥梁施工、市政工程施工。
- 相关中文对照歌词
- Under Construction
- Ice Cream
- Change In The Making
- Wall Around My Heart
- Temecula Sunrise
- Not Man Big
- The Construkction Of Light
- Domination
- Domination / Hollow
- Construction Of The Masses, Pt.2
- 推荐网络例句
-
He tendered his resignation to the Prime Minister.
他向首相递了辞呈。不适合
-
International economy and trade,Nanking 210044
国际经济与贸易,南京 210044
-
Lord… have I misheard you?
主啊,是我听错了吗?