查询词典 construction engineering
- 与 construction engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The construction organization design is the complexity that aims at the construction gearing process, using the thought of the system and follow economic regulation of technique, carry on the plan management behavior that orchestrates an arrangement to each stage,each link that draws up to set up engineering and various resources need, the construction organization design point of this design controls in the progress,the quality control and safe control.
施工组织设计就是针对施工安装过程的复杂性,用系统的思想并遵循技术经济规律,对拟建工程的各阶段、各环节以及所需的各种资源进行统筹安排的计划管理行为,本设计的施工组织设计重点在进度控制、质量控制和安全控制。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Plastic machinery equipment, packaging equipment, oil logistics company Cargo Electronic Scale Airlines Beijing, Beijing scales, electronic truck scale Electronic Hanging molding packaging machinery printing equipment farm machinery to food and beverage processing equipment, sewage treatment equipment, cleaning, cleaning equipment, air purification equipment, energy-saving equipment dust desulfurization equipment, noise reduction equipment silencers of refuse Incinerator generators, motor generator sets electrical high-voltage low-voltage electrical distribution equipment, textile equipment and transmission equipment leather processing equipment, paper processing machinery shoe machinery coating equipment paper-making equipment and accessories throughout the washing and iron furniture manufacturing machinery equipment technology equipment gift Ceramic production and processing machinery manufacturers of computer equipment, household electrical appliance manufacturing equipment toys processing equipment and special equipment in other industries transmission machine parts valve pump hydraulic filtration equipment machinery and components filter material bearing spring fasteners, connectors seal cutter mold, fixture pneumatic fluid pressure components Machine Annex fans, ventilation equipment compression, separation equipment reducer, variable speed internal combustion engine testing machine welding machine and accessories brake materials welding, cutting equipment, engineering machinery, construction machinery equipment, metallurgy equipment, mineral processing equipment, metal forming equipment, electronics manufacturing workers control system and electric equipment, business equipment, financial and special equipment and special equipment hotel equipment metal processing industry oil processing machinery parts heat transfer process instrumentation, industrial boilers, air-conditioning refrigeration and accessories shop building materials production and processing equipment, gas equipment, casting machinery and heat treatment equipment, non-destructive testing refrigeration machines rubber machinery equipment, transport equipment, loading and unloading mining mining mining construction equipment, transportation equipment, chemical equipment, crystallization equipment inventory Mixing Equipment Chemical Equipment Chemical laboratory equipment agents joined Chemical Equipment Accessories chemical pipelines and accessories forming chemical equipment chemical equipment Drying Equipment Industrial humidifier crushing equipment mechanical separation equipment volume instrument response equipment and surveying equipment, mining equipment, heat transfer and mass transfer equipment transportation equipment glass processing machinery industry mold processing equipment mold design machine design laser processing machinery and equipment repair boiler installed second-hand second-hand second-hand machine tools Construction Machinery Stock mechanical equipment and industrial supplies projects to join other industrial products, not elsewhere classified agent electronic scales Beijing, Beijing scales, electronic truck scale Electronic Hanging, hanging hook scale value of electronic ground electronic railway scale electronic belt scale, quantitative packing scale said cylinder, liquid Handling pressure scales, electronic scales weighing electronic hook weighing system automation Electronic Truck Scale Electronic table scale, which scales the electronic scale electronic weighing scale forklift management software Electronic Weighing display controller electronic platform balance, electronic platform weighing scales, truck scale weighing small loadometer management software electronic accessories electronic platform balance scale, waterproof scale, counting scale static and dynamic axle load sensor instrument, instruments, large-screen display management system for electronic scale weighing system loader?
塑料机械石油设备包装设备物流公司货运公司航空公司北京电子秤,北京衡器,电子汽车衡电子吊秤包装成型机械印刷设备农业机械食品、饮料加工设备污水处理设备清洗、清理设备节能设备空气净化设备脱硫除尘设备消音降噪设备垃圾焚烧炉发电机、发电机组电动机低压电器高压电器配电输电设备纺织设备和器材皮革加工设备纸加工机械制鞋机械涂装设备造纸设备及配件整熨洗涤设备家具制造机械工艺礼品加工设备陶瓷生产加工机械电脑产品制造设备家电制造设备玩具加工设备其他行业专用设备机床阀门泵传动件液压机械及部件过滤设备过滤材料轴承弹簧紧固件、连接件密封件模具刀具、夹具气动元件液压元件机床附件风机、排风设备压缩、分离设备减速机、变速机内燃机试验机焊接材料与附件制动器电焊、切割设备工程机械、建筑机械选矿设备冶炼设备金属成型设备电子产品制造设备工控系统及装备电热设备商业专用设备金融专用设备酒店设备金属加工工业润滑油机械零部件加工仪器仪表加工换热、制冷空调设备工业锅炉及配件车间设备建材生产加工机械燃气设备铸造及热处理设备无损检测仪器制冷设备橡胶机械输送设备矿业装卸设备矿业输送设备矿山施工设备库存化工设备结晶设备混合设备化工实验设备化工设备配件化工设备代理加盟化工管道及配件化工成型设备化工成套设备干燥设备工业加湿器粉碎设备分离设备机械量仪表反应设备地矿勘测设备传质设备传热设备储运设备玻璃机械行业专用设备加工模具加工模具设计激光加工机械设计机械设备维修安装二手机床二手锅炉二手工程机械库存设备及工业用品机械项目合作工业制品代理加盟其他未分类北京电子秤,北京衡器,电子汽车衡电子吊秤、吊勾秤电子地上衡电子轨道衡电子皮带秤、定量包装秤钢瓶称、液压搬运秤,电子天平电子吊钩秤自动化称重系统电子汽车衡电子桌秤、案秤电子叉车秤电子秤称重管理软件电子称重显示器、控制器电子台秤、磅秤电子平台秤、小地磅汽车衡称重管理软件电子秤配件电子台秤、防水秤、计数秤动静态轴重仪传感器、仪表、大屏显示器电子秤管理系统装载机称重系统?
-
Dozens of companies under the jurisdiction of the civil engineering construction subsidiary, decoration companies, steel companies, fire works, road and bridge companies, professional installation companies, Hong Xiang real estate development company, Shun Po security supplies, construction machinery Leasing companies such as the production and management units and currently employs more than 5,000 people, all types of engineers and technicians more than 1,700 people, senior engineers and technicians from more than 500 people, the construction division Yiji 4, the project manager qualification certificates held by 171 persons.
公司下辖十个土木建筑施工分公司、装饰装修公司、钢结构公司、消防工程公司、路桥公司、安装专业公司、鸿祥房地产开发公司、顺宝安全防护用品公司、施工机械租赁公司等生产经营单位,现有员工5000余人,各类工程技术人员1700余人,中高级工程技术人员500余人,壹级建造师4人,持有项目经理资格证书者171人。
-
It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .
据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。
-
Combined with airport avenue works in Taiyuan,from preparation work,construction drainage pipe and well,water-enclosed test,trench back filling,drainage construction and other aspects the construction technology of rain-water pipe in municipal engineering is introduced in detail in order to ensure the drainage effect of pavement as well as safety for flood-passing.
通过太原市机场大道新建工程的施工,从施工准备、排水管施工、井室施工、闭水试验及沟槽回填、排水施工技术措施等方面详细地介绍了市政工程雨水管施工工艺,以保证公路路面排水畅通,同时确保城市安全渡汛。
-
Engineering Department has a professional insulation construction team, advanced construction equipment, has long been engaged in pipeline, equipment, ball tank (iron sheets, wiping noodle, PAP) anti-corrosion insulation construction, central air-conditioning duct a variety of production and pipeline insulation, polyurethane, on-site foam.
工程部拥有一支专业的保温施工队伍,先进的施工设备,长期从事管道、设备、球罐体防腐保温施工,中央空调风管制作及各种管道保温,聚氨酯,现场发泡。
-
He said that the development and construction of coastal ports are millions of people for centuries Binhai dream October 23, 2008, voted in the electricity group guidance and participation of the coastal port of 100,000-ton waterway engineering finish the project bidding; 12 month one day, the CLP Group and Yancheng City People's Government for the signing of the "General Yancheng Coastal Port Development Cooperation Agreement"; December 18, the construction units in the three cross-Agency Ltd. Air official start sand block breakwater construction.
他说,滨海港的开发建设是滨海百万人民的百年梦想,2008年10月23日,在中电投集团的指导和参与下,滨海港10万吨级航道工程完成了项目招投标;12月1日,中电投集团与盐城市人民政府签订了《江苏盐城滨海港综合开发合作协议书》;12月18日,施工单位中交三航局有限公司正式开始防波挡沙堤的施工。
-
Contrapose to the different cofferdams which affecting factors are different, several methods are adopted. It gives a detailed illustration on construction technique and construction technics. Gives a detailed analysis on several crucial issues which emerged when geosynthetics was used in the engineering, and gives the causation and mechanism about how the problems emerged, and then, gives the solution and advice. The several crucial issues is: the choose and construction of geocomposites; the setting and closure of cofferdams; the kinds and forms of breakages of geosynthetical dyke.
针对对工程的各作业面不同的施工条件,工程采用了几种不同的施工方法,论文对典型的施工方法和施工工艺进行了详细的说明,并对土工合成材料在该工程应用过程中出现的几个有重要影响的问题,例如土工织物滤布的选择和施工、龙口的设置与合龙、堤心充砂袋体破坏形式的种类与解决作了细致的分析,给出了问题发生的原因和机理,并给出了解决方案和建议。
- 相关中文对照歌词
- Under Construction
- Ice Cream
- Change In The Making
- Wall Around My Heart
- Automotive Engineering
- The Child With The Star On His Head
- Temecula Sunrise
- Not Man Big
- The Construkction Of Light
- Domination
- 推荐网络例句
-
Bob Eckert has been chairman and chief executive of Mattel for eight years.
美泰董事长兼首席执行官鲍勃·埃克尔特在任已8年。
-
The outlook for honors and disgraces carries on and surpasses the traditional outlook for honors and disgraces theoretically, and carries on and develops the theory of construction of socialist mora...
社会主义荣辱观的提出在理论上是对传统荣辱观的一次继承和超越,是对社会主义道德建设理论的继承和发展,在实践上有利于形成良好的社会风尚。
-
She has an abhorrence of change.
她憎恶变革。