查询词典 calculated
- 与 calculated 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In order to testify the reliability of the approximate approach, the calculated value of volumetrically averaged energy dissipation rate based on the approximate approach are compared with the calculated results from an analytical equation derived on the thermodynamic laws and using the universally accepted equations for the friction factor.
为了检验能量耗散率近似算法的可靠性,将按近似算法计算得到的管内湍流体均能量耗散率与按热力学方法导出的解析式并采用公认的摩擦因子公式计算的体均能量耗散率进行了对比。
-
Firstly, the flood control regulation of TGP in Sep is computed based on the analyses on the inflow in Sep and Oct, and the risk and loss on the ahead impounding scheme is calculated and analyzed. Then, the storage level, power production and releasing discharge are achieved by computing on the electricity generation model through reservoir regulation graph. Thirdly, obstruction in channel is analyzed and the problem in the Chongqing reach is more serious in 175-145-155m scheme. The sediment aggrading process and distribution on different schemes is calculated by 1-D reservoir mathematical model. The navigation benefit is computed by navigation model. Based on above calculations, the impounding time is decided by the multi-purpose decision model, and evaluate by analytical hierarchy and balance layout model. A best impounding scheme is achieved to match the requirement of flood control electricity generation and navigation et al.
首先,在对宜昌站9、10月份来水分析的基础上,采用第2章建立的防洪优化调度子模型进行了三峡水库9月份防洪调度,分析了汛末提前不同天蓄水对防洪的影响,计算了汛末不同蓄水方案水库9月份的洪灾风险率和风险损失;接着,根据第2章建立的发电调度子模型进行了三峡水库发电调度计算,得出了不同蓄水方案下水库的坝前水位、发电量及下泄流量过程;然后,分析了175-145-155m方案下三峡水库的碍航问题,指出175-145-155m方案下重庆河段的碍航问题最为严重,通过进行不同蓄水方案下水库一维泥沙冲淤计算,得出了不同蓄水方案下库区淤积过程及分布,并通过航运调度子模型,计算了不同蓄水方案下水库的航运效益;最后,根据以上防洪、发电及航运调度计算的结果,运用第3章水沙多目标决策模型对水库的蓄水时间进行了多目标决策,并采用层次加权均衡规划模型对计算结果进行评价,得到一个能满足水库防洪、发电及航运各方面要求的最佳蓄水方案。
-
The first 0x10 bytes is an unknown hash calculated from the decrypted block. It is deduced that is calculated from the decrypted block and not the ciphered one due to the fact that 4.01 and 4.05 have a lot of ipl blocks in common, which, when decrypted, are similar, but they are totally different in its encrypted form.
前面的0x10字节是从译好的模块中计算出来的未知认证代码,之所以可以推断出是从译好的模块计算而来而非密码模块,是因为4.01和4.05有很多共同的初始程序模块,而这些模块在编译之后是相同的,然而他们在密码阶段则完全不相同。
-
Through field measurement for the contact pressure of box foundation with Ⅰ shaped plane of a high rise building on cobble subsoil, the distribution law of the contact pressure has been diagrammed. At the same time, the contact pressure has been calculated with finite compression layer model, which is well accordant with the measured result. The relative error of average value for the measured to the calculated contact pressure is 6.9%. This shows that the numerical calculation is right.
通过对西南交通大学某教学楼箱形基础基底反力的实测结果,得出了&Ⅰ&形平面箱基置于密实卵石层上的基底反力分布规律,又用有限压缩层地基模型对该箱基反力进行了计算,结果表明:实测反力与计算反力分布规律一致,实测反力平均值与计算反力平均值相对误差为6.9%,也说明此法计算箱基反力是可行的。
-
4According to rationale of dynamic of structures,the program of finiteelement method that calculated largescale dynamic structure is finished.Using theprogram of finite element method,the dottier element of some model gas operatedof rapid-fire gun is calculated.
4根据结构动力学的基本原理编制了计算大型结构动力问题的有限元程序,对某型自动火炮自动机中较薄弱的元件进行了数值分析。
-
Resources of several geneses were calculated, migrating parameters and gathering parameters were calculated, and progress was made on translating degassing quantity into resources quantity.
对多成因CO〓进行资源量计算,获取较合理的运移系数和聚集系数,在脱气量和资源量转换研究方面取得进展。
-
By means of FEM the magnetic field distributions of AMB are calculated and the coupling phenomena of AMB are discussed. Intercrossing magnetic force, which is used to weigh coupling degree, is calculated also.
采用有限元法对磁力轴承的磁场分布进行了计算和分析,研究了磁力轴承的耦合问题,针对空间电磁力的分布,计算出衡量耦合强弱的交叉电磁力。
-
If rock compressibility is calculated by the elastic modulus method, its results are relatively reasonable. But if it is calculated by the Hall Plate empirical formula, the value of rock compressibility is too large. Thai's to say, it overvalues the elastic energy of formation rocks. And the velocity of pressure drawdown of the gas reservoir numerical simulation is caused to be too slow.
由Hall图版经验公式法计算得到的岩石压缩系数偏大,即对地层岩石的弹性能量估计偏大,从而导致气藏数值模拟计算的压降速度偏慢;而采用弹性模量法计算岩石压缩系数,其结果相对较为合理。
-
Where a foreign investor reinvests all its annual after-tax profits derived from the enterprise with foreign investment in the same year, and the accumulative reinvestment amount is lower than the above said limited amount, the tax to be refunded shall be calculated on the basis of the actual reinvestment amount; if the accumulative reinvestment amount exceeds the above said limited amount, the tax to be refunded shall be calculated on the basis of the limited amount, and the part in excess shall not be entitled to tax refund.
外国投资者以源于外商投资企业同一年度的全部税后利润再投资的,其再投资额低于上述限额的,按实际投资额计算退税;超过上述限额的,按限额计算退税,超过部分不得计算退税。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
- 相关中文对照歌词
- Bongo Bongo
- Please Take Me Home
- Papa
- Just Let Me Breathe
- My Last Sting
- Who Must Die?
- Panther Power
- Maybe Today
- Oh No
- New Tattoo
- 推荐网络例句
-
There are different types of personal loans available.
有许多不同类型的个人贷款优惠。
-
The above mentioned teaching model of spiral rising can be used to avoid rigidness in teaching.
上述螺旋式上升的教学模式,可以避免教学形成模式後的僵化现象。
-
In addition, the mass transfer process of main components in the heat pump cycle, such as a generator and an absorber, is analyzed, and the mass trasfer model, the relation of its separation effectiveness with the thermodynamic inconvertibility are described.
根据热力学第一、二定律,从理论上建立了描述该类热泵的数学模型。从热力学不可逆性原理出发,分析了热泵循环过程的热力学不可逆性引起的〓损失。