查询词典 cable bend
- 与 cable bend 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First, the computation theory of the anti-sliding pile has been researched including interaction between the pile and tho landslide, the mechanical model of the pile and the calculation method of the internal force of the pile with prestressed anchor cable. Second, the internal force status, the mechanical computation model and the design method of the foundation beam with prestressed anchor cable have been analyzed. Finally, by the example, engineering instance and the geology mechanical model test, the main results and conclusions deduced from the thesis have been compared and validated.
论文首先对抗滑桩的相关设计计算理论进行了研究,包括抗滑桩与边坡岩土体的相互作用,抗滑桩的力学计算模型以及预应力锚索抗滑桩的内力计算方法;其次对预应力锚索地梁的受力状态、计算模型以及设计方法进行了分析研究:最后结合工程实例和地质力学模型试验对相关结论进行了分析比较、验证。
-
In this paper, Shenyang Fumin Bridge main girder to carry out innovative design of the traveling carriage, Based on the similar design of traveling carriage , adopted under the former anchor beam arc settings to resolve the fate of the plane rotation problem , makes the main truss rod assembly by universal application of the cradle of the space cable plane cable-stayed bridge girder construction.
摘 要:本文对沈阳市富民桥主梁的施工挂篮进行创新设计,参考同类挂篮的成功设计思路的基础上,通过将前锚梁下缘设置弧形来解决索的平面转动问题,使得主桁由万能杆件拼装的挂篮应用于空间索面的斜拉桥主梁施工中。
-
This paper introduces bolting technology with wire meshes,beam and cable anchor and parameter design of main support in 1113(3) conveying workface of zhang ji coal mine,through surveying to combined rock pressure of driving and coal winning,it proves feasibility about bolting with wire meshes,beam and cable anchor in large cross section composite roof roadway.
介绍了张集煤矿1113(3)综采工作面运输巷,采用锚梁网索支护技术解决巷道支护过程中的难点及确定合理支护参数,通过对掘进和回采期间的综合矿压观测,证明锚梁网索支护在大断面复合顶板煤巷中应用是可行的。
-
Factory covers an area of 45,000 square meters, construction area of 22,000 square meters, with total assets of 20,600,000 yuan, the main products have GCS, MGS, GXL series Switchgear; XM lighting distribution box; high-performance anti-corrosion of steel cable tray XQJ , NDCH fire-resistant cable groove box, XQJG FRP bridge, LQJ bridge aluminum alloy; BGFM total box closed busbar, QLFM from phase enclosed bus and other products.
厂区占地面积4.5万平方米,建筑面积2.2万平方米,拥有总资产2060万元,主要产品有GCS、MGS、GXL等系列开关柜;XM照明配电箱;高效防腐XQJ钢制电缆桥架、NDCH耐火电缆槽盒,XQJG玻璃钢桥架,LQJ铝合金桥架;BGFM共箱封闭母线、QLFM离相封闭母线等产品。
-
Brake Cable - This cable is the connection between the brake mechanism and the brake lever.
刹车线-这是电缆之间的联系机制和刹车制动杠杆。
-
Brake cable – The cable that connects the brake lever to the brake mechanism.
制动电缆-电缆连接制动杠杆的刹车机制。
-
Such adjustment is done at the cable doubler , where the single cable from the brake lever interfaces with the two cables to the respective rear brakes.
这种调整是在有线电视倍增,其中一根电缆从制动杠杆接口与两个电缆各自的后轮制动系统。
-
However, some cable dampers of cable stay bridge; Tune Mass Damper working in a long time, and strong vibration environment are very easy to have leaking, and dampers failing which may cause a serious result in the structure.
可对于应用到振动频繁的斜拉索、 TMD 等工作环境下的阻尼器,漏油问题会很容易发生,带来阻尼器失效,甚至引起结构破坏的恶果。
-
With reference to the Shanghai Changjiang River Bridge Project, the three-dimensional finite element model is used to calculate the shear forces of welded studs in anchorage zone of steel and concrete composite pylon of cable-stayed bridge under the action of stay cable forces.
结合上海长江大桥工程,采用空间有限元模型,计算在抖拉索索力作用下钢-混凝土组合索塔锚固区焊钉的剪力,分析焊钉竖向剪力、横向剪力和合剪力分别在索塔竖桥向和横桥向的分布规律。
-
Concrete work covers the following aspects:(1) Based on the finite displacement theory and the characteristics of Self-anchored and single-tower suspension bridge, and considering the nonlinear factors. A span of 80 +190 +260 +80 m independence of the self-anchored suspension bridge tower carried out a detailed analysis. Through static analysis of the vector cross-over cable, cable-plane form, stiffening beam camber and the temperature load on the structure.
具体工作如下:(1)基于有限位移理论,针对自锚式独塔悬索桥的受力特点,全面考虑几何非线性因素对自锚式悬索桥的影响,对一座跨度80+190+260+80m的自锚式独塔悬索桥进行了详细分析;通过静力计算来分析主缆矢跨比、索面形式、加劲梁拱度和温度荷载对结构的影响。
- 相关中文对照歌词
- Cable TV
- Baby Bend Over
- Love Handles
- Touch Ya Toes
- Bend Ya
- Bend Ya
- Get Real Low
- Shake It 4 Daddy
- Bend Time Back Around
- Train Round The Bend
- 推荐网络例句
-
I can not negligent, he should do what?
我不能不在意了,他要做什么呢?
-
It is very dangerous to swim in the river alone.
一个人到河里游泳是很危险的。
-
Marlboro became one of the world's most valuable brands the old-fashioned way -- traditional mass marketing.
万宝路成为世界上最有价值的品牌走的是老式的道路――传统的大众市场。