英语人>网络例句>bridge construction 相关的网络例句
bridge construction相关的网络例句

查询词典 bridge construction

与 bridge construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

Matsuura The reporter learned from the bridge construction headquarters was informed that currently the main tower of the bridge Matsuura has risen to 100 meters, 100 meters above the construction has also reached the river in Harbin construction record.

记者从松浦大桥建设指挥部获悉,目前松浦大桥主塔已经升至100米,百米以上施工也创下哈尔滨市江上建筑施工最高纪录。

The method of control calculation of Suspension bridge and the design of SBCS (Suspension Bridge construction Control analysis System) is mainly analyzed in this paper.

本文主要研究了悬索桥施工控制方法及施工控制分析计算软件SBCS(Suspension Bridge construction Control analysis System)。

Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."

六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"

On the North River Bridge Weicheng CFST arch main bridge construction S233 Provincial Highway Bridge (Gaoyou Depalletizing three to Jiangdu Port Section) under a span of 80.6m CFST arch, rigid tie beam for 1.4m × 1.8m pre-stressed box girder, cast-in-place method using stent Construction .

浅谈北澄子河大桥钢管砼拱主桥施工大桥为S233省道的一座跨径80.6m的下承式钢管混凝土拱桥,刚性系梁为1.4m×1.8m预应力箱形梁,采用支架现浇方法施工。

In the segment precasting, cantilever erection and bridge deck construction during the PAKSEY bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line.

在PAKSEY大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The article is used finite yuan the method builds his to emulate analytic model, the construction of imitate bridge, study successive bridge bracket is irrigated build construction each operating mode, analyse what each operating mode issues bracket to be out of shape reach stability, ordinal come the design of bracket of test and verify is reliable, provide reference for bridge construction.

文章利用有限元方法建立其仿真分析模型,模拟桥梁的施工,探究连续梁支架浇筑施工各工况,分析各工况下支架的变形及稳定性,依次来验证支架的设计是否合理可靠,为桥梁施工提供参考。

According to the construction course and finished dead state of the inclined tower cable-stayed bridge without back stay at Tongling Road in Hefei and combining the modern theory and method of the bridge construction control mentioned in this paper, established a space model by large-scale general finite element software ANSYS. It can obtain some valuable result by emulating analysis of the bridge which is under the construction course and finished dead state. It can provide an instruction for the Tongling Road bridge with the result and construction job site monitoring data.

文中根据合肥市铜陵路预应力混凝土无背索斜塔斜拉桥的具体施工过程和成桥状态,结合文中介绍的现代桥梁施工控制理论和方法,运用大型通用有限元软件ANSYS建立了三维空间模型,对该桥进行了施工过程和成桥状态下的结构仿真模拟分析,将模拟计算结果与施工现场振动频率法索力测试数据和分析结果相结合,为铜陵路无背索斜塔斜拉桥拉索张拉施工提供指导,及时调控,确保了该桥在成桥后线形美观,受力性能满足要求。

Advanced construction technology and the capacity of general contractor Yajisha Bridge Ping vertical swivel General Xinguang bridge construction technology for upgrading the technology of hydraulic synchronization Balinghe Bridge Mobile slipform construction technology company at technology and equipment, management capabilities, are a modern highway construction general contracting capabilities.

先进施工技术与总承包能力丫髻沙大桥平竖综合转体施工技术新光大桥液压同步提升技术坝陵河大桥移动滑模施工技术公司在技术力量和设备、管理能力上,都具备了现代化高速公路施工总承包的能力。

第1/46页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

If Pentium 4 used to be the master of all games built on Quake3 engine, now the situation has changed completely.

如果奔腾4使用的是掌握所有游戏建立在求苛刻的发动机,现在的情况已完全改变。

No, this is not what we mean by framing, although the principle is the same.

不,这不是我们所讲的框架的含义,尽管法则是一样的。

As we walked up a steep, rocky trail, he fell and uttered a mild expletive.

当我们走上一面陡峭的岩石小径时,他跌倒了,随口说了一句温和的感叹词。