英语人>词典>汉英 : 渡线 的英文翻译,例句
渡线 的英文翻译、例句

渡线

词组短语
junction line
更多网络例句与渡线相关的网络例句 [注:此内容来源于网络,仅供参考]

In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.

本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。

A common line connecting various types of single-and double-switch turnout; cross-cross and a diamond-shaped cross-straight; cross-connect with the combination of a switch and cross-reference points, such as crossing lines.

常用的线路连接有各种类型的单式道岔和复式道岔;交叉有直交叉和菱形交叉;连接与交叉的组合有交分道岔和交叉渡线等。

If the turnout will be double-cross the X-shaped above two points and two points respectively below link, that is, cross-crossing lines.

如果将复式交分道岔的X形的上面两点和下面两点分别连接起来,就是交叉渡线

The evolution process under the control of the multigeodynamic force system (including the boundary forces of Eurasia-Pacific-Indian three massive plates around Nansha block, effects of the deep mantle, relative soft layer-sliding planes within Nansha lithosphere block and the earth's rotational inertial force) can be briefly divided four stages: the late Cretaceous to the early Eocene stage of uprilfing-erosion and shear-extension caused by the oceanwards-eastwards withdrew of Pacific subduction zone and the delamination of proto-subducted slab after the stage of pre-Cretaceous pre-rifting active continentoceanic plate margin. In this stage, the Nansha transcrustal layering-block started to move southeastwards on the Nansha transcrustal layer-sliding plane, meanwhile, the Andu-Bisheng and Liyue-Banyue basement layering-block slid on their upper-crust layer-sliding planes, and Xibu accretion zone was formed. Successively, it entered the stage of the mid-Eocene to early Oligocene, when NW-SE sea-floor spreading occurred in the southwest subbasin owing to the slip-line field initiated by the collision between the Indian and Eurasian plates, Zengmu foreland-basin started to develop in the same time. And in the stage of late Oligocene to early Miocene, near NS simple-shear extension and sea-floor spreading in the central subbasin of eastern South China Sea resulted from the south-southeastwards drawing-force of the mantle-flow. The crustal layering-blocks and the Miri accretion zone formed also in this stage.

南沙岩石圈新生代微板块及板内层块构造的动力演化过程,在多元动力等因素(如块体之外的欧-太-印三大板块运动边界力和地幔深部活动因素、块体内部软弱层滑面以及地球自转变化)控制下,大致经历了4个阶段的演化:从前晚白垩世的裂前活动陆-洋板块边缘阶段因太平洋俯冲带向东跃迁、原向NNW俯冲消亡的板片的拆沉、幔隆而进入晚白垩世-早始新世的隆升剥蚀、剪切伸展演化阶段,南沙超壳层块顺超壳层滑面祥东南运移、安渡-毕生与礼乐-半月基底层块沿上壳层滑面拆离,西布增生带形成;继而先后在中始新世-早渐新世期间受印-欧板块碰撞滑线场、地球自转加速影响出现西南海盆NW-SE向海底扩张和曾母前陆盆地的发育,和晚渐新世-早中新世期间南—东南向地幔流牵引造成的中央次海盆近NS向单剪伸展与海底扩张、壳体层块向南差异滑移、米里增生带形成;中中新世以来,印度-澳洲板块快速向北俯冲,构成今日南海格局。

The construction plan of double-joined arch is validated using numerical simulation when dilapidating segments to construct single connecting tunnel between two shield-driven tunnels in this paper.

应用数值模拟方法研究了在盾构法修建隧道的基础上拆除管片修建渡线隧道中双联拱段方案的可行性,研究表明双联拱方案是可行的;另外,拆除管片并开挖时、施做中墙时均会引起地面较大的沉降,施工完毕后会在双联拱右部与原盾构隧道之间产生塑性区,为此提出了施工建议。

Mission, is an important logistic supply line, the wartime certanly will be an enemy the target of the point stroke, therefore, the mobile camouflage of the study for use by the military ship boat have the important meaning.

军用船艇在未来渡海登岛作战中担负着繁重的渡海登岛输送、水上交通运输等任务,是重要的后勤补给线,战时势必是敌重点打击的目标,因此,探讨军用船艇机动伪装具有重要的意义。

The procedure is applied in two projects:(1) Shanghai Huanqiu finance center tower foundation pit dewatering, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 149m, the horizontal flow barrier goes deep to 34m, the extraction wells are penetrated to 55m, the filters of the extraction wells are located between 34m to 55m, and the water level in the deep foundation pit is decreased to 26m under land surface, the result of 8 pumping wells optimization project is designed.(2) The forth subway of Dong Jia-du tunnel repair foundation pit dewatering in Shanghai, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 144.45m, the horizontal flow barrier goes deep to 65m, the extraction wells are penetrated to 60m, the filters of the extraction wells are located between 45m to 60m, and the water level in the deep foundation pit is decreased to 42.45m under land surface, then an optimization project is designed.

最后将成果分别应用于两个工程实例中:(1)上海环球金融中心塔楼基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、抽水井埋深达55m、抽水井过滤器埋深为34至55m,基坑内地下水位降至埋深达26m的情况下的地下水复杂流动状态,得出了8口抽水井优化降水方案;(2)上海地铁4号线董家渡隧道修复基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达144.45m、基坑周围挡水连续墙埋深达65m、抽水井埋深达60m、抽水井过滤器埋深为45至60m,基坑内地下水位降至埋深达42.45m的情况下的地下水复杂流动状态,确定出了最优降水方案。

更多网络解释与渡线相关的网络解释 [注:此内容来源于网络,仅供参考]

mitriform:主教冠形状的

trailing point crossover 背向渡线 | mitriform 主教冠形状的 | trolly 手推车, 货车

salnatron:粗碳酸钠

orthopole 正交极, 垂极 | salnatron 粗碳酸钠 | trailing point crossover 背向渡线

ladder track:梯线

平行渡线 parallel crossover | 梯线 ladder track | 套线道岔 mixed gage turnout

single day tide -s:一日潮

single deck screen 单层筛 | single day tide -s 一日潮 | single crossover 渡换线

single day tide -s WESTBANK:一日潮

single deck screen WESTBANK 单层筛 | single day tide -s WESTBANK 一日潮 | single crossover WESTBANK 渡换线